blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2785098

EP2785098 - NETWORK PROBLEM POSITIONING METHOD AND DEVICE BASED ON USER PERCEPTION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  15.09.2017
Database last updated on 19.10.2024
FormerGrant of patent is intended
Status updated on  18.12.2016
Most recent event   Tooltip15.09.2017Application deemed to be withdrawnpublished on 18.10.2017  [2017/42]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[N/P]
Former [2014/40]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian, Longgang
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / WANG, Xiufeng
Huawei Administration Building
Bantian
Longgang
Shenzhen Guangdong 518129 / CN
02 / XU, Zhenglei
Huawei Administration Building
Bantian
Longgang
Shenzhen Guangdong 518129 / CN
03 / CHEN, Xin
Huawei Administration Building
Bantian
Longgang
Shenzhen Guangdong 518129 / CN
04 / DENG, Liang
Huawei Administration Building
Bantian
Longgang
Shenzhen Guangdong 518129 / CN
 [2014/40]
Representative(s)Isarpatent
Patent- und Rechtsanwälte Barth
Charles Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
[N/P]
Former [2014/40]Isarpatent
Patent- und Rechtsanwälte
Friedrichstrasse 31
80801 München / DE
Application number, filing date12852083.028.06.2012
WO2012CN77691
Priority number, dateCN20111038224725.11.2011         Original published format: CN201110382247
[2014/40]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013075487
Date:30.05.2013
Language:ZH
[2013/22]
Type: A1 Application with search report 
No.:EP2785098
Date:01.10.2014
Language:EN
[2014/40]
Search report(s)International search report - published on:CN30.05.2013
(Supplementary) European search report - dispatched on:EP02.12.2014
ClassificationIPC:H04W24/08
[2015/01]
CPC:
H04W24/08 (EP,US); H04L41/507 (EP)
Former IPC [2014/40]H04W24/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/40]
TitleGerman:NETZWERKPROBLEMPOSITIONIERUNGSVERFAHREN UND VORRICHTUNG AUF DER BASIS VON BENUTZERWAHRNEHMUNG[2014/40]
English:NETWORK PROBLEM POSITIONING METHOD AND DEVICE BASED ON USER PERCEPTION[2014/40]
French:PROCÉDÉ ET DISPOSITIF DE LOCALISATION D'INCIDENTS RÉSEAU BASÉE SUR LA PERCEPTION DES UTILISATEURS[2014/40]
Entry into regional phase22.05.2014Translation filed 
22.05.2014National basic fee paid 
22.05.2014Search fee paid 
22.05.2014Designation fee(s) paid 
22.05.2014Examination fee paid 
Examination procedure22.05.2014Examination requested  [2014/40]
12.06.2015Amendment by applicant (claims and/or description)
04.11.2015Despatch of a communication from the examining division (Time limit: M04)
11.03.2016Reply to a communication from the examining division
24.05.2016Despatch of a communication from the examining division (Time limit: M04)
27.09.2016Reply to a communication from the examining division
19.12.2016Communication of intention to grant the patent
03.05.2017Application deemed to be withdrawn, date of legal effect  [2017/42]
02.06.2017Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2017/42]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2015
Fees paidRenewal fee
22.05.2014Renewal fee patent year 03
30.06.2015Renewal fee patent year 04
30.06.2016Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.06.201706   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US2005192001  (SAMUEL ISAAC [GB]) [Y] 6,7 * paragraph [0002] - paragraph [0005] * * paragraph [0019] - paragraph [0028] * * paragraph [0039] - paragraph [0041] * * table 1 *;
 [Y]  - PUTTONEN J ET AL, "Coverage optimization for Minimization of Drive Tests in LTE with extended RLF reporting", PERSONAL INDOOR AND MOBILE RADIO COMMUNICATIONS (PIMRC), 2010 IEEE 21ST INTERNATIONAL SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20100926), ISBN 978-1-4244-8017-3, pages 1764 - 1768, XP031838170 [Y] 1-19 * page 1764 - page 1766 *
 [Y]  - NOKIA SIEMENS NETWORKS ET AL, "Adding RLF specific use cases and requirements", 3GPP DRAFT; S5-113829 S5-113654 REL11 CR32421-B00 USE CASES AND REQUIREMENTS FOR RLF, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111118), vol. SA WG5, no. San Francisco, USA; 20111114 - 20111118, XP050579077 [Y] 1-5,8-19 * A.11.1 Description; page 9 *
 [T]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on Minimization of drive-tests in Next Generation Networks; (Release 9)", 3GPP STANDARD; 3GPP TR 36.805, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091221), no. V9.0.0, pages 1 - 24, XP050401520 [T] 1-19 * page 6 - page 21 *
International search[A]WO2008121062  (ERICSSON TELEFON AB L M [SE], et al);
 [Y]CN101562830  (SHENZHEN YOUWANG TECHNOLOGY CO [CN]);
 [X]CN102075978  (LANGCHAO COMM INFORMATION SYSTEM CO LTD);
 [A]CN102143507  (BEIJING ZHONG CHUANG TELECOM TEST CO LTD);
 [A]CN102149119  (WAVE COMM AND INFORMATION SYSTEM CO LTD)
Examination   - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Subscriber and equipment trace; Trace concepts and requirements (Release 11)", 3GPP STANDARD; 3GPP TS 32.421, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110926), vol. SA WG5, no. V11.0.0, pages 1 - 35, XP050554003
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.