EP2713641 - METHOD FOR RECEIVING DATA, METHOD FOR TRANSMITTING DATA, MOBILE TERMINAL, AND SERVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.07.2018 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 18.08.2017 | ||
Former | Grant of patent is intended Status updated on 09.04.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Huawei Device Co., Ltd. Building B2, Zone B Huawei Industrial Base Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2014/14] | Inventor(s) | 01 /
CHEN, Guoqiao Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2014/14] | Representative(s) | Thun, Clemens Mitscherlich PartmbB Patent- und Rechtsanwälte Karlstraße 7 80333 München / DE | [N/P] |
Former [2014/14] | Thun, Clemens Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstraße 33 80331 München / DE | Application number, filing date | 12861348.6 | 24.07.2012 | [2017/38] | WO2012CN79101 | Priority number, date | CN201110444013 | 27.12.2011 Original published format: CN201110444013 | [2014/14] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013097452 | Date: | 04.07.2013 | Language: | ZH | [2013/27] | Type: | A1 Application with search report | No.: | EP2713641 | Date: | 02.04.2014 | Language: | EN | [2014/14] | Type: | B1 Patent specification | No.: | EP2713641 | Date: | 20.09.2017 | Language: | EN | [2017/38] | Search report(s) | International search report - published on: | CN | 04.07.2013 | (Supplementary) European search report - dispatched on: | EP | 02.09.2014 | Classification | IPC: | H04W76/04, // H04W4/20 | [2017/15] | CPC: |
H04W4/20 (EP);
H04L67/55 (US);
H04W76/25 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2014/14] | H04W8/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/14] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM EMPFANGEN VON DATEN, VERFAHREN ZUM ÜBERTRAGEN VON DATEN, MOBILES ENDGERÄT UND SERVER | [2014/14] | English: | METHOD FOR RECEIVING DATA, METHOD FOR TRANSMITTING DATA, MOBILE TERMINAL, AND SERVER | [2014/14] | French: | PROCÉDÉ POUR LA RÉCEPTION DE DONNÉES, PROCÉDÉ POUR LA TRANSMISSION DE DONNÉES, TERMINAL MOBILE ET SERVEUR | [2014/14] | Entry into regional phase | 23.12.2013 | Translation filed | 23.12.2013 | National basic fee paid | 23.12.2013 | Search fee paid | 23.12.2013 | Designation fee(s) paid | 23.12.2013 | Examination fee paid | Examination procedure | 23.12.2013 | Examination requested [2014/14] | 25.03.2015 | Amendment by applicant (claims and/or description) | 10.04.2017 | Communication of intention to grant the patent | 25.07.2017 | Fee for grant paid | 25.07.2017 | Fee for publishing/printing paid | 07.08.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.04.2017 | Opposition(s) | 21.06.2018 | No opposition filed within time limit [2018/35] | Fees paid | Renewal fee | 29.07.2014 | Renewal fee patent year 03 | 29.07.2015 | Renewal fee patent year 04 | 27.07.2016 | Renewal fee patent year 05 | 28.07.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.07.2012 | AL | 20.09.2017 | AT | 20.09.2017 | CY | 20.09.2017 | CZ | 20.09.2017 | DK | 20.09.2017 | EE | 20.09.2017 | ES | 20.09.2017 | FI | 20.09.2017 | HR | 20.09.2017 | IT | 20.09.2017 | LT | 20.09.2017 | LV | 20.09.2017 | MC | 20.09.2017 | MK | 20.09.2017 | NL | 20.09.2017 | PL | 20.09.2017 | PT | 20.09.2017 | RO | 20.09.2017 | RS | 20.09.2017 | SE | 20.09.2017 | SI | 20.09.2017 | SK | 20.09.2017 | SM | 20.09.2017 | TR | 20.09.2017 | BG | 20.12.2017 | NO | 20.12.2017 | GR | 21.12.2017 | IS | 20.01.2018 | [2020/34] |
Former [2020/31] | HU | 24.07.2012 | |
AT | 20.09.2017 | ||
CY | 20.09.2017 | ||
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
MC | 20.09.2017 | ||
MK | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
PT | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SI | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
TR | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2020/27] | HU | 24.07.2012 | |
AT | 20.09.2017 | ||
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
MC | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
PT | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SI | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
TR | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2020/16] | AT | 20.09.2017 | |
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
MC | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SI | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
TR | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2019/15] | AT | 20.09.2017 | |
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
MC | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SI | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2018/52] | AT | 20.09.2017 | |
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SI | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2018/35] | AT | 20.09.2017 | |
CZ | 20.09.2017 | ||
DK | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2018/24] | AT | 20.09.2017 | |
CZ | 20.09.2017 | ||
EE | 20.09.2017 | ||
ES | 20.09.2017 | ||
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
IT | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
NL | 20.09.2017 | ||
PL | 20.09.2017 | ||
RO | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
SK | 20.09.2017 | ||
SM | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
IS | 20.01.2018 | ||
Former [2018/21] | CZ | 20.09.2017 | |
FI | 20.09.2017 | ||
HR | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
NL | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
Former [2018/15] | FI | 20.09.2017 | |
HR | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
NL | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
Former [2018/12] | FI | 20.09.2017 | |
HR | 20.09.2017 | ||
LT | 20.09.2017 | ||
LV | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
Former [2018/11] | FI | 20.09.2017 | |
HR | 20.09.2017 | ||
LT | 20.09.2017 | ||
RS | 20.09.2017 | ||
SE | 20.09.2017 | ||
BG | 20.12.2017 | ||
NO | 20.12.2017 | ||
GR | 21.12.2017 | ||
Former [2018/09] | FI | 20.09.2017 | |
LT | 20.09.2017 | ||
SE | 20.09.2017 | ||
NO | 20.12.2017 | ||
Former [2018/08] | FI | 20.09.2017 | |
LT | 20.09.2017 | ||
NO | 20.12.2017 | ||
Former [2018/07] | LT | 20.09.2017 | |
NO | 20.12.2017 | Documents cited: | Search | [XY]EP1841130 (RESEARCH IN MOTION LTD [CA]) [X] 1,5,7,9,13,18,20 * paragraph [0019] - paragraph [0027] * * paragraph [0030] - paragraph [0045]; figures 1,2 * * paragraph [0054] * [Y] 2-4,6,8,10-12,14-17,19; | [I] - PER LJUNG, "Opportunities for energy savings in mobile devices", PERSONAL INDOOR AND MOBILE RADIO COMMUNICATIONS (PIMRC), 2011 IEEE 22ND INTERNATIONAL SYMPOSIUM ON, IEEE, (20110911), doi:10.1109/PIMRC.2011.6139950, ISBN 978-1-4577-1346-0, pages 2394 - 2401, XP032102350 [I] 1,5,7,9,13,18,20 * A. Notifications; page 2396 * DOI: http://dx.doi.org/10.1109/PIMRC.2011.6139950 | [Y] - 3GPP, "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Push architecture (Release 10)", 3GPP DRAFT; 23976-A00, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110622), vol. SA WG2, XP050547972 [Y] 2-4,6,8,10-12,14-17,19 * page 8; figure 1 * * page 11; figure 4 * * page 13 - page 15 * | [T] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on non-MTC Mobile Data Applications impacts (Release 12)", 3GPP STANDARD; 3GPP TR 22.801, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111221), vol. SA WG1, no. V12.0.0, pages 1 - 22, XP050555043 [T] 1-20 * page 7 - page 12 * | [T] - HUAWEI ET AL, "Push Proxy/Device Agent Function for reducing heartbeat/keep-alive of applications", vol. SA WG2, no. San Diego, US; 20130408 - 20130412, (20130413), 3GPP DRAFT; S2-131498 WAS S2-131353, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_96_San_Diego/Docs/, (20130413), XP050708682 [T] 1-20 * the whole document * | International search | [X]CN1585372 (CHINESE MOBILE TELECOMM GROUP [CN]); | [Y]CN1705268 (CAMEO INFOTECH INC [CN]); | [Y]CN102209302 (SHENZHEN CITY GIONEE COMM EQUIPMENT CO LTD) |