EP2829230 - AWAKING DEGREE DETERMINATION DEVICE, AWAKING DEGREE DETERMINATION PROGRAM, AND AWAKING DEGREE DETERMINATION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.01.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 15.02.2019 | ||
Former | Grant of patent is intended Status updated on 11.11.2018 | ||
Former | Examination is in progress Status updated on 13.07.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Fujitsu Limited 1-1, Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | [2019/12] |
Former [2015/05] | For all designated states Fujitsu Limited 1-1, Kamikondanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | Inventor(s) | 01 /
MASUDA, Yuta c/o Fujitsu Limited 1-1 Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi Kanagawa 211-8588 / JP | 02 /
SANO, Satoshi c/o Fujitsu Limited 1-1 Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi Kanagawa 211-8588 / JP | 03 /
ODAGIRI, Junichi c/o Fujitsu Limited 1-1 Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi Kanagawa 211-8588 / JP | [2015/05] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2015/05] | Application number, filing date | 12872173.5 | 19.03.2012 | [2019/12] | WO2012JP57073 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013140525 | Date: | 26.09.2013 | Language: | JA | [2013/39] | Type: | A1 Application with search report | No.: | EP2829230 | Date: | 28.01.2015 | Language: | EN | [2015/05] | Type: | B1 Patent specification | No.: | EP2829230 | Date: | 20.03.2019 | Language: | EN | [2019/12] | Search report(s) | International search report - published on: | JP | 26.09.2013 | (Supplementary) European search report - dispatched on: | EP | 18.11.2014 | Classification | IPC: | A61B5/16 | [2015/05] | CPC: |
A61B5/18 (EP,US);
A61B5/02405 (EP,US);
A61B5/0245 (EP,US);
A61B5/347 (US);
A61B5/681 (US);
A61B2503/22 (EP,US);
A61B5/316 (EP);
A61B5/6893 (EP,US);
A61B5/6898 (EP,US);
A61B5/7257 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG ZUR BESTIMMUNG EINES AUFWACHGRADES. PROGRAMM ZUR BESTIMMUNG EINES AUFWACHGRADES UND VERFAHREN ZUR BESTIMMUNG EINES AUFWACHGRADES | [2015/05] | English: | AWAKING DEGREE DETERMINATION DEVICE, AWAKING DEGREE DETERMINATION PROGRAM, AND AWAKING DEGREE DETERMINATION METHOD | [2015/05] | French: | DISPOSITIF DE DÉTERMINATION DU DEGRÉ D'ÉVEIL, PROGRAMME DE DÉTERMINATION DU DEGRÉ D'ÉVEIL ET PROCÉDÉ DE DÉTERMINATION DU DEGRÉ D'ÉVEIL | [2015/05] | Entry into regional phase | 12.09.2014 | Translation filed | 12.09.2014 | National basic fee paid | 12.09.2014 | Search fee paid | 12.09.2014 | Designation fee(s) paid | 12.09.2014 | Examination fee paid | Examination procedure | 12.09.2014 | Examination requested [2015/05] | 04.03.2015 | Amendment by applicant (claims and/or description) | 17.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.09.2018 | Reply to a communication from the examining division | 12.11.2018 | Communication of intention to grant the patent | 04.02.2019 | Fee for grant paid | 04.02.2019 | Fee for publishing/printing paid | 04.02.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.07.2018 | Opposition(s) | 02.01.2020 | No opposition filed within time limit [2020/09] | Fees paid | Renewal fee | 16.09.2014 | Renewal fee patent year 03 | 02.01.2015 | Renewal fee patent year 04 | 05.01.2016 | Renewal fee patent year 05 | 03.01.2017 | Renewal fee patent year 06 | 30.01.2018 | Renewal fee patent year 07 | 04.01.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.03.2012 | AL | 20.03.2019 | AT | 20.03.2019 | CY | 20.03.2019 | CZ | 20.03.2019 | DK | 20.03.2019 | EE | 20.03.2019 | ES | 20.03.2019 | FI | 20.03.2019 | HR | 20.03.2019 | IT | 20.03.2019 | LT | 20.03.2019 | LV | 20.03.2019 | MC | 20.03.2019 | MK | 20.03.2019 | MT | 20.03.2019 | NL | 20.03.2019 | PL | 20.03.2019 | RO | 20.03.2019 | RS | 20.03.2019 | SE | 20.03.2019 | SI | 20.03.2019 | SK | 20.03.2019 | SM | 20.03.2019 | TR | 20.03.2019 | BG | 20.06.2019 | NO | 20.06.2019 | GR | 21.06.2019 | IS | 20.07.2019 | PT | 20.07.2019 | [2022/32] |
Former [2022/27] | HU | 19.03.2012 | |
AL | 20.03.2019 | ||
AT | 20.03.2019 | ||
CY | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
MC | 20.03.2019 | ||
MT | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/49] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
MC | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/17] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/13] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/09] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/04] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
IS | 20.07.2019 | ||
PT | 20.07.2019 | ||
Former [2020/03] | AL | 20.03.2019 | |
AT | 20.03.2019 | ||
CZ | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/52] | AL | 20.03.2019 | |
CZ | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
PL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
SM | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/49] | AL | 20.03.2019 | |
CZ | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/48] | ES | 20.03.2019 | |
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/47] | ES | 20.03.2019 | |
FI | 20.03.2019 | ||
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/46] | FI | 20.03.2019 | |
HR | 20.03.2019 | ||
IT | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/39] | FI | 20.03.2019 | |
HR | 20.03.2019 | ||
LT | 20.03.2019 | ||
LV | 20.03.2019 | ||
NL | 20.03.2019 | ||
RS | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/38] | FI | 20.03.2019 | |
LT | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/37] | FI | 20.03.2019 | |
LT | 20.03.2019 | ||
SE | 20.03.2019 | ||
NO | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/34] | FI | 20.03.2019 | |
LT | 20.03.2019 | ||
SE | 20.03.2019 | ||
NO | 20.06.2019 | ||
Former [2019/33] | FI | 20.03.2019 | |
LT | 20.03.2019 | ||
NO | 20.06.2019 | Documents cited: | Search | [A]WO2007144880 (ELFI TECH LTD [IL], et al) [A] 1-7 * page 16, line 12 - page 17, line 5 ** figures 9-25 *; | [I]EP2087841 (FUJITSU LTD [JP]) [I] 1-7 * paragraphs [0022] - [0030] * * paragraphs [0035] - [0054] * * paragraphs [0062] - [0068] * * figure -; claim - *; | [A]WO2010082200 (WIDEMED LTD [IL], et al) [A] 1-7 * page 8, line 5 - page 9, line 17 * | International search | [A]JP2000300528 (JAPAN SCIENCE & TECH CORP); | [A]JP2005535359 (DATEX-OHMEDA, INC.); | [A]WO2010140241 (FUJITSU LTD [JP], et al); | [A]WO2010140273 (FUJITSU LTD [JP], et al) | by applicant | WO2008065724 | JP2010155072 | - SATO SHUNSUKE; KIKKAWA SHO; KIRYU TOHRU, Basics of Biosignal Processing, CORONA PUBLISHING CO., LTD. |