EP2762663 - Method for the production of a striker assembly for door locks of vehicle doors [Right-click to bookmark this link] | |||
Former [2014/32] | Striker assembly for door locks of vehicle doors | ||
[2019/04] | Status | No opposition filed within time limit Status updated on 03.04.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 26.04.2019 | ||
Former | Grant of patent is intended Status updated on 27.01.2019 | ||
Former | Request for examination was made Status updated on 09.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Peter Wahl GmbH & Co. KG Spessartstrasse 5 97892 Kreuzwertheim / DE | [2014/32] | Inventor(s) | 01 /
Wahl, Peter Eichenweg 9 D-97892 Kreuzwertheim / DE | [2014/32] | Representative(s) | Oppermann, Mark Oppermann & Oppermann Patentanwälte Am Wiesengrund 35 63075 Offenbach / DE | [2019/22] |
Former [2014/32] | Oppermann, Ewald Oppermann & Oppermann Patentanwälte Am Wiesengrund 35 63075 Offenbach / DE | Application number, filing date | 13005437.2 | 19.11.2013 | [2014/32] | Priority number, date | DE20132000991U | 01.02.2013 Original published format: DE 202013000991 U | [2014/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2762663 | Date: | 06.08.2014 | Language: | DE | [2014/32] | Type: | A3 Search report | No.: | EP2762663 | Date: | 01.06.2016 | Language: | DE | [2016/22] | Type: | B1 Patent specification | No.: | EP2762663 | Date: | 29.05.2019 | Language: | DE | [2019/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.05.2016 | Classification | IPC: | E05B85/04 | [2014/32] | CPC: |
E05B85/045 (EP);
E05B17/0004 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/02] |
Former [2014/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Herstellung einer Schließbügelanordnung für Türschlösser von Fahrzeugen | [2019/04] | English: | Method for the production of a striker assembly for door locks of vehicle doors | [2019/04] | French: | Procédé de fabrication d'agencement à gâche pour serrure de porte de véhicules | [2019/04] |
Former [2014/32] | Schließbügelanordnung für Türschlösser von Fahrzeugtüren | ||
Former [2014/32] | Striker assembly for door locks of vehicle doors | ||
Former [2014/32] | Agencement à gâche pour serrure de porte de véhicules | Examination procedure | 29.11.2016 | Amendment by applicant (claims and/or description) | 29.11.2016 | Examination requested [2017/02] | 28.01.2019 | Communication of intention to grant the patent | 11.04.2019 | Fee for grant paid | 11.04.2019 | Fee for publishing/printing paid | 15.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.01.2019 | Opposition(s) | 03.03.2020 | No opposition filed within time limit [2020/19] | Fees paid | Renewal fee | 21.10.2015 | Renewal fee patent year 03 | 18.11.2016 | Renewal fee patent year 04 | 14.11.2017 | Renewal fee patent year 05 | 22.11.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 29.05.2019 | CY | 29.05.2019 | DK | 29.05.2019 | EE | 29.05.2019 | HR | 29.05.2019 | LT | 29.05.2019 | LV | 29.05.2019 | MC | 29.05.2019 | MK | 29.05.2019 | MT | 29.05.2019 | RO | 29.05.2019 | RS | 29.05.2019 | SI | 29.05.2019 | SM | 29.05.2019 | BG | 29.08.2019 | NO | 29.08.2019 | GR | 30.08.2019 | IS | 29.09.2019 | IE | 19.11.2019 | LU | 19.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | [2022/31] |
Former [2021/34] | AL | 29.05.2019 | |
CY | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
MT | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IS | 29.09.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2021/31] | AL | 29.05.2019 | |
CY | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IS | 29.09.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2021/26] | AL | 29.05.2019 | |
CY | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/46] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IE | 19.11.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/36] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/35] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
LU | 19.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/34] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
Former [2020/26] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SI | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2020/14] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2020/12] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2020/10] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2020/09] | AL | 29.05.2019 | |
DK | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2019/51] | AL | 29.05.2019 | |
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2019/50] | AL | 29.05.2019 | |
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
Former [2019/47] | LT | 29.05.2019 | |
NO | 29.08.2019 | Documents cited: | Search | [XYI]DE29713784U (GRIWE INNOVATIVE UMFORMTECHNIK [DE]) [X] 1 * page 3, line 7 - page 5, line 34; figures 1, 2 * [Y] 1,2 [I] 3,4; | [Y]DE202012000718U (WAHL PETER GMBH & CO [DE]) [Y] 1,2* paragraphs [0004] , [ 0021] - paragraph [0025]; figure 4 *; | [Y]DE102011100548 (FAMILIE BURGER GBR VERTRETEN DURCH IHRE GESELLSCHAFTER MERCEDES BURGER [DE]) [Y] 1,2 * Absätze [0001]-[0003]; Absätze [0018]-[0024];; figures 1, 3 * | by applicant | EP2620570 |