EP2628919 - An aircraft propulsion system nacelle [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.09.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 18.10.2019 | ||
Former | Grant of patent is intended Status updated on 07.08.2019 | ||
Former | Examination is in progress Status updated on 02.02.2019 | ||
Former | Request for examination was made Status updated on 27.07.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Rolls-Royce plc Kings Place 90 York Way London N1 9FX / GB | [2020/09] |
Former [2015/31] | For all designated states Rolls-Royce plc 62 Buckingham Gate London SW1E 6AT / GB | ||
Former [2013/34] | For all designated states Rolls-Royce plc 65 Buckingham Gate London SW1E 6AT / GB | Inventor(s) | 01 /
Evans, Dale 26 Tawny Way, Littleover Derby, Derbyshire DE23 3XG / GB | [2013/34] | Representative(s) | Rolls-Royce plc Moor Lane (ML-9) PO Box 31 Derby DE24 8BJ / GB | [N/P] |
Former [2019/47] | Rolls-Royce plc Intellectual Property Dept SinA-48 PO Box 31 Derby DE24 8BJ / GB | ||
Former [2013/34] | Yeomans, Victoria Jane Anora, et al Rolls-Royce plc Intellectual Property Dept WH20 PO Box 3 Bristol, South Gloucestershire BS34 7QE / GB | Application number, filing date | 13154897.6 | 12.02.2013 | [2013/34] | Priority number, date | GB20120002790 | 20.02.2012 Original published format: GB 201202790 | [2013/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2628919 | Date: | 21.08.2013 | Language: | EN | [2013/34] | Type: | A3 Search report | No.: | EP2628919 | Date: | 07.03.2018 | Language: | EN | [2018/10] | Type: | B1 Patent specification | No.: | EP2628919 | Date: | 20.11.2019 | Language: | EN | [2019/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.02.2018 | Classification | IPC: | F02C7/04 | [2013/34] | CPC: |
F02C7/04 (EP,US);
F04D29/40 (US);
B64D29/00 (EP,US);
F04D29/526 (EP,US);
B64D2033/0206 (EP,US);
B64D2033/0286 (EP,US);
F05D2220/36 (EP,US);
F05D2230/53 (EP,US);
F05D2300/121 (EP,US);
F05D2300/133 (EP,US);
F05D2300/171 (EP,US);
F05D2300/603 (EP,US);
Y02T50/60 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/35] |
Former [2013/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Gondel für Flugzeugantriebssystem | [2013/34] | English: | An aircraft propulsion system nacelle | [2013/34] | French: | Nacelle pour système de propulsion d'aéronef | [2013/34] | Examination procedure | 12.02.2013 | Date on which the examining division has become responsible | 24.07.2018 | Amendment by applicant (claims and/or description) | 24.07.2018 | Examination requested [2018/35] | 06.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 08.02.2019 | Reply to a communication from the examining division | 08.08.2019 | Communication of intention to grant the patent | 10.10.2019 | Fee for grant paid | 10.10.2019 | Fee for publishing/printing paid | 10.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.02.2019 | Opposition(s) | 21.08.2020 | No opposition filed within time limit [2020/44] | Fees paid | Renewal fee | 26.02.2015 | Renewal fee patent year 03 | 26.02.2016 | Renewal fee patent year 04 | 27.02.2017 | Renewal fee patent year 05 | 27.02.2018 | Renewal fee patent year 06 | 27.02.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.02.2013 | AL | 20.11.2019 | AT | 20.11.2019 | CY | 20.11.2019 | CZ | 20.11.2019 | DK | 20.11.2019 | EE | 20.11.2019 | ES | 20.11.2019 | FI | 20.11.2019 | HR | 20.11.2019 | IT | 20.11.2019 | LT | 20.11.2019 | LV | 20.11.2019 | MC | 20.11.2019 | MK | 20.11.2019 | MT | 20.11.2019 | NL | 20.11.2019 | PL | 20.11.2019 | RO | 20.11.2019 | RS | 20.11.2019 | SE | 20.11.2019 | SI | 20.11.2019 | SK | 20.11.2019 | SM | 20.11.2019 | TR | 20.11.2019 | IE | 12.02.2020 | LU | 12.02.2020 | BG | 20.02.2020 | NO | 20.02.2020 | GR | 21.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | IS | 20.03.2020 | PT | 12.04.2020 | [2022/32] |
Former [2022/27] | HU | 12.02.2013 | |
AL | 20.11.2019 | ||
AT | 20.11.2019 | ||
CY | 20.11.2019 | ||
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
IT | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
MT | 20.11.2019 | ||
NL | 20.11.2019 | ||
PL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SI | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
TR | 20.11.2019 | ||
IE | 12.02.2020 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2022/26] | AL | 20.11.2019 | |
AT | 20.11.2019 | ||
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
IT | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
NL | 20.11.2019 | ||
PL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SI | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
TR | 20.11.2019 | ||
IE | 12.02.2020 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2021/10] | AL | 20.11.2019 | |
AT | 20.11.2019 | ||
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
IT | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
NL | 20.11.2019 | ||
PL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SI | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
IE | 12.02.2020 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2021/08] | AL | 20.11.2019 | |
AT | 20.11.2019 | ||
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
NL | 20.11.2019 | ||
PL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SI | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
IE | 12.02.2020 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/51] | AL | 20.11.2019 | |
AT | 20.11.2019 | ||
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
NL | 20.11.2019 | ||
PL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SI | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/49] | AL | 20.11.2019 | |
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
MC | 20.11.2019 | ||
NL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/48] | AL | 20.11.2019 | |
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
LU | 12.02.2020 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/37] | AL | 20.11.2019 | |
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
SK | 20.11.2019 | ||
SM | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/36] | AL | 20.11.2019 | |
CZ | 20.11.2019 | ||
DK | 20.11.2019 | ||
EE | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
PT | 12.04.2020 | ||
Former [2020/35] | AL | 20.11.2019 | |
CZ | 20.11.2019 | ||
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RO | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
Former [2020/32] | AL | 20.11.2019 | |
ES | 20.11.2019 | ||
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
Former [2020/26] | ES | 20.11.2019 | |
FI | 20.11.2019 | ||
HR | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
RS | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
Former [2020/24] | ES | 20.11.2019 | |
FI | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
IS | 20.03.2020 | ||
Former [2020/23] | ES | 20.11.2019 | |
FI | 20.11.2019 | ||
LT | 20.11.2019 | ||
LV | 20.11.2019 | ||
NL | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
GR | 21.02.2020 | ||
Former [2020/22] | FI | 20.11.2019 | |
LT | 20.11.2019 | ||
SE | 20.11.2019 | ||
BG | 20.02.2020 | ||
NO | 20.02.2020 | ||
Former [2020/21] | NO | 20.02.2020 | Documents cited: | Search | [XYI]US4734007 (PERRY DERICK A [GB]) [X] 1-4,6,7,9,10,15 * figures 1-2 * * column 2, line 53 - column 3, line 3 * * claim 2 * [Y] 8 [I] 11,14; | [X]US4767270 (SEIDEL GERHARD E [US]) [X] 1-7,9,10,12,13,15 * figure 2 * * column 3, line 16 - line 32 * * column 5, line 63 - column 6, line 19 * * claim 1 *; | [A]US2010276007 (HENDRICKS GAVIN [US]) [A] 1-15* figure 3 *; | [Y] - ZIMBRICK R A ET AL, "INVESTIGATION OF VERY HIGH BYPASS RATIO ENGINES FOR SUBSONIC TRANSPORTS", JOURNAL OF PROPULSION AND POWER, AMERICAN INSTITUTE OF AERONAUTICS AND ASTRONAUTICS. NEW YORK, US, (19900701), vol. 6, no. 4, ISSN 0748-4658, pages 490 - 496, XP000136188 [Y] 8 * page 491; figures 2-3 * |