EP2604340 - Gasoline sulfur reductions catalyst for fluid catalytic cracking process [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 24.01.2025 | |
Former | The patent has been granted Status updated on 17.05.2019 | ||
Former | Grant of patent is intended Status updated on 02.01.2019 | Most recent event Tooltip | 17.06.2022 | Lapse of the patent in a contracting state New state(s): CY, HU | published on 20.07.2022 [2022/29] | Applicant(s) | For all designated states W. R. Grace & Co.-Conn 7500 Grace Drive Columbia, MD 21044-4098 / US | [2019/25] |
Former [2013/25] | For all designated states W. R. Grace & Co.-Conn 7500 Grace Drive Columbia, MD 21044-4098 / US | Inventor(s) | 01 /
Hu, Ruizhong 10410 Popkins Court Woodstock, MD Maryland 21163 / US | 02 /
Wormsbecher, Richard Franklin 13521 Orion Drive Dayton, MD Maryland 21036 / US | [2013/25] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [N/P] |
Former [2019/25] | J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | ||
Former [2013/49] | Duckworth, Timothy John J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | ||
Former [2013/25] | Benson, John Everett J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 13158629.9 | 24.02.2006 | [2013/25] | Priority number, date | US20050656461P | 25.02.2005 Original published format: US 656461 P | [2013/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2604340 | Date: | 19.06.2013 | Language: | EN | [2013/25] | Type: | B1 Patent specification | No.: | EP2604340 | Date: | 19.06.2019 | Language: | EN | [2019/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.04.2013 | Classification | IPC: | B01J29/06, B01J29/08, C10G11/05, B01J29/16, // B01J35/02 | [2013/25] | CPC: |
C10G11/05 (EP,KR,US);
B01J29/06 (KR);
B01J29/061 (EP,US);
B01J29/08 (KR);
B01J29/088 (EP,US);
B01J29/166 (EP,US);
B01J35/40 (EP,US);
B01J2229/18 (EP,US);
B01J2229/42 (EP,US);
C10G2300/202 (EP,US);
C10G2300/4093 (EP,US);
C10G2300/70 (EP,US);
C10G2400/02 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/25] |
Former [2013/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Katalysator zur Verringerung von Schwefel in Benzin für das FCC-Verfahren | [2013/25] | English: | Gasoline sulfur reductions catalyst for fluid catalytic cracking process | [2013/25] | French: | Catalyseur de reduction du soufre present dans l'essence pour craquage catalytique fluide | [2013/25] | Examination procedure | 19.12.2013 | Amendment by applicant (claims and/or description) | 19.12.2013 | Examination requested [2014/06] | 21.02.2014 | Despatch of a communication from the examining division (Time limit: M06) | 26.08.2014 | Reply to a communication from the examining division | 22.11.2018 | Cancellation of oral proceeding that was planned for 06.12.2018 | 06.12.2018 | Date of oral proceedings (cancelled) | 03.01.2019 | Communication of intention to grant the patent | 10.05.2019 | Fee for grant paid | 10.05.2019 | Fee for publishing/printing paid | 10.05.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP06721072.4 / EP1855799 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20060721072) is 11.03.2011 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 11.03.2013 | Renewal fee patent year 03 | 11.03.2013 | Renewal fee patent year 04 | 11.03.2013 | Renewal fee patent year 05 | 11.03.2013 | Renewal fee patent year 06 | 11.03.2013 | Renewal fee patent year 07 | 11.03.2013 | Renewal fee patent year 08 | 27.02.2014 | Renewal fee patent year 09 | 26.02.2015 | Renewal fee patent year 10 | 26.02.2016 | Renewal fee patent year 11 | 27.02.2017 | Renewal fee patent year 12 | 27.02.2018 | Renewal fee patent year 13 | 27.02.2019 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2006 | AT | 19.06.2019 | CY | 19.06.2019 | CZ | 19.06.2019 | DK | 19.06.2019 | EE | 19.06.2019 | ES | 19.06.2019 | FI | 19.06.2019 | LT | 19.06.2019 | LV | 19.06.2019 | MC | 19.06.2019 | PL | 19.06.2019 | RO | 19.06.2019 | SE | 19.06.2019 | SI | 19.06.2019 | SK | 19.06.2019 | TR | 19.06.2019 | BG | 19.09.2019 | GR | 20.09.2019 | IS | 19.10.2019 | PT | 21.10.2019 | IE | 24.02.2020 | LU | 24.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/27] |
Former [2021/12] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
IE | 24.02.2020 | ||
LU | 24.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
IE | 24.02.2020 | ||
LU | 24.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 24.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/49] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 24.02.2020 | ||
Former [2020/48] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 24.02.2020 | ||
Former [2020/37] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/36] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/24] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/22] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/17] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/12] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/11] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
SK | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
Former [2020/10] | AT | 19.06.2019 | |
CZ | 19.06.2019 | ||
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
SE | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
Former [2020/09] | CZ | 19.06.2019 | |
FI | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
SE | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
Former [2019/51] | FI | 19.06.2019 | |
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
SE | 19.06.2019 | ||
BG | 19.09.2019 | ||
GR | 20.09.2019 | ||
Former [2019/48] | FI | 19.06.2019 | |
LT | 19.06.2019 | ||
SE | 19.06.2019 | ||
Former [2019/47] | FI | 19.06.2019 | |
LT | 19.06.2019 | Documents cited: | Search | [A]SU1786718 ; | [X]DE1470650 (MOBIL OIL CORP); | [XA]DE3210195 (ICI PLC [GB]); | [X]US4437978 (CHESTER ARTHUR W [US], et al); | [A]US4542116 (BERTOLACINI RALPH J [US], et al); | [I]US4793827 (LOCHOW CHARLES F [US], et al); | [A]US2002179498 (CHESTER ARTHUR W [US], et al); | by applicant | US3293192 | US3402996 | US3607043 | US3676368 | US4764269 | US4790982 | US4957892 | US4957718 | US4963520 | US5376608 | US5525210 | WO0208300 | US6482315 | US6635168 | US6635169 | US20040801424 |