blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2749372

EP2749372 - Power supply device for arc welding, arc welding system, and control method of power supply device for arc welding [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  22.07.2016
Database last updated on 24.08.2024
Most recent event   Tooltip22.07.2016Withdrawal of applicationpublished on 24.08.2016  [2016/34]
Applicant(s)For all designated states
Kabushiki Kaisha Yaskawa Denki
2-1, Kurosaki-Shiroishi, Yahatanishi-ku Kitakyushu-shi
Fukuoka 806-0004 / JP
[2014/27]
Inventor(s)01 / Murakami, Masafumi
c/o Kabushiki Kaisha Yaskawa Denki
2-1, Kurosaki-Shiroishi
Yahatanishi-ku
Kitakyushu-shi, Fukuoka 806-0004 / JP
02 / Hirayama, Takahide
c/o Kabushiki Kaisha Yaskawa Denki
2-1, Kurosaki-Shiroishi
Yahatanishi-ku
Kitakyushu-shi, Fukuoka 806-0004 / JP
 [2014/27]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstrasse 4
80802 München / DE
[N/P]
Former [2014/27]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Application number, filing date13162048.603.04.2013
[2014/27]
Priority number, dateJP2012027869820.12.2012         Original published format: JP 2012278698
[2014/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2749372
Date:02.07.2014
Language:EN
[2014/27]
Search report(s)(Supplementary) European search report - dispatched on:EP04.06.2014
ClassificationIPC:B23K9/09, B23K9/095, B23K9/10, B23K9/173
[2014/27]
CPC:
B23K9/091 (EP,CN,US); B23K9/092 (CN,US); B23K9/095 (EP,CN,US);
B23K9/1012 (CN,US); B23K9/1043 (EP,CN,US); B23K9/173 (EP,CN,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/27]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Stromversorgungsvorrichtung zum Bogenschweissen, Bogenschweisssystem und Steuerverfahren einer Stromversorgungsvorrichtung zum Bogenschweissen[2014/27]
English:Power supply device for arc welding, arc welding system, and control method of power supply device for arc welding[2014/27]
French:Dispositif d'alimentation électrique pour soudage à l'arc, système de soudage à l'arc et procédé de commande de dispositif d'alimentation électrique pour soudage à l'arc[2014/27]
Examination procedure29.09.2014Amendment by applicant (claims and/or description)
29.09.2014Examination requested  [2014/46]
18.07.2016Application withdrawn by applicant  [2016/34]
Fees paidRenewal fee
27.04.2015Renewal fee patent year 03
30.03.2016Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]JPH07328768  (DAIHEN CORP) [A] 1,5,6* abstract *;
 [A]JP2007083268  (MATSUSHITA ELECTRIC IND CO LTD) [A] 1-6 * abstract *;
 [AD]JP2007245239  (MATSUSHITA ELECTRIC IND CO LTD) [AD] 1-6 * abstract *
by applicantJP2007245239
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.