EP2615343 - MARINE PIPELINE INSTALLATION SYSTEM AND METHODS [Right-click to bookmark this link] | |||
Former [2013/29] | Marine pipeline installation system and methods | ||
[2014/30] | Status | No opposition filed within time limit Status updated on 25.09.2015 Database last updated on 06.11.2024 | Most recent event Tooltip | 27.10.2017 | Lapse of the patent in a contracting state New state(s): BE | published on 29.11.2017 [2017/48] | Applicant(s) | For all designated states Itrec B.V. Admiraal Trompstraat 2 3115 HH Schiedam / NL | [N/P] |
Former [2013/29] | For all designated states Itrec B.V. Admiraal Trompstraat 2 3115 HH Schiedam / NL | Inventor(s) | 01 /
Feijen, Arnoud Laurens 43a, Juliana van Stolberglaan 3051 CC ROTTERDAM / NL | 02 /
Nouwens, Ronny Lambertus Waltherus 158, Griegplein 3122 VN SCHIEDAM / NL | 03 /
Vehmeijer, Terence Willem August 2, Noorwitzstraat 2562 MW DEN HAAG / NL | 04 /
Roodenburg, Joop 7, St. Eustatiusstraat 2612 HA DELFT / NL | [2013/29] | Representative(s) | EP&C P.O. Box 3241 2280 GE Rijswijk / NL | [2013/29] | Application number, filing date | 13162901.6 | 29.04.2008 | [2013/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2615343 | Date: | 17.07.2013 | Language: | EN | [2013/29] | Type: | A3 Search report | No.: | EP2615343 | Date: | 18.09.2013 | Language: | EN | [2013/38] | Type: | B1 Patent specification | No.: | EP2615343 | Date: | 19.11.2014 | Language: | EN | [2014/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.08.2013 | Classification | IPC: | F16L1/16, F16L1/20 | [2013/29] | CPC: |
F16L1/16 (EP,US);
F16L1/205 (US);
B63B35/03 (US);
F16L1/12 (US);
F16L1/202 (EP,US);
F16L1/207 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2013/29] | Title | German: | MEERESROHRLEITUNGSINSTALLATIONSSYSTEM UND -VERFAHREN | [2013/38] | English: | MARINE PIPELINE INSTALLATION SYSTEM AND METHODS | [2014/30] | French: | SYSTÈME ET PROCÉDÉ D'INSTALLATION D'UNE CONDUITE MARINE | [2014/30] |
Former [2013/29] | Meeresrohrleitungsinstallationssystem und -verfahren | ||
Former [2013/29] | Marine pipeline installation system and methods | ||
Former [2013/29] | Système et procédé d'installation d'une conduite marine | Examination procedure | 30.01.2014 | Amendment by applicant (claims and/or description) | 30.01.2014 | Examination requested [2014/13] | 24.06.2014 | Communication of intention to grant the patent | 06.10.2014 | Fee for grant paid | 06.10.2014 | Fee for publishing/printing paid | 06.10.2014 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08753746.0 / EP2281133 | Divisional application(s) | EP14192751.7 / EP2837867 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080753746) is 13.04.2011 | Opposition(s) | 20.08.2015 | No opposition filed within time limit [2015/44] | Fees paid | Renewal fee | 09.04.2013 | Renewal fee patent year 03 | 09.04.2013 | Renewal fee patent year 04 | 09.04.2013 | Renewal fee patent year 05 | 09.04.2013 | Renewal fee patent year 06 | 28.04.2014 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.04.2008 | AT | 19.11.2014 | BE | 19.11.2014 | BG | 19.11.2014 | CY | 19.11.2014 | CZ | 19.11.2014 | DK | 19.11.2014 | EE | 19.11.2014 | ES | 19.11.2014 | FI | 19.11.2014 | HR | 19.11.2014 | IT | 19.11.2014 | LT | 19.11.2014 | LV | 19.11.2014 | MC | 19.11.2014 | MT | 19.11.2014 | PL | 19.11.2014 | RO | 19.11.2014 | SE | 19.11.2014 | SI | 19.11.2014 | SK | 19.11.2014 | TR | 19.11.2014 | NO | 19.02.2015 | GR | 20.02.2015 | IS | 19.03.2015 | PT | 19.03.2015 | IE | 29.04.2015 | LU | 29.04.2015 | CH | 30.04.2015 | LI | 30.04.2015 | [2017/46] |
Former [2017/39] | HU | 29.04.2008 | |
AT | 19.11.2014 | ||
BG | 19.11.2014 | ||
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
MT | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
TR | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 29.04.2015 | ||
LU | 29.04.2015 | ||
CH | 30.04.2015 | ||
LI | 30.04.2015 | ||
Former [2017/03] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
MT | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 29.04.2015 | ||
LU | 29.04.2015 | ||
CH | 30.04.2015 | ||
LI | 30.04.2015 | ||
Former [2016/20] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
IE | 29.04.2015 | ||
LU | 29.04.2015 | ||
CH | 30.04.2015 | ||
LI | 30.04.2015 | ||
Former [2016/12] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SI | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 29.04.2015 | ||
CH | 30.04.2015 | ||
LI | 30.04.2015 | ||
Former [2016/06] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 29.04.2015 | ||
CH | 30.04.2015 | ||
LI | 30.04.2015 | ||
Former [2016/03] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
IT | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 29.04.2015 | ||
Former [2016/01] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
MC | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 29.04.2015 | ||
Former [2015/52] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
LU | 29.04.2015 | ||
Former [2015/37] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
SK | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/36] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
CZ | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
RO | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/35] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
DK | 19.11.2014 | ||
EE | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/26] | AT | 19.11.2014 | |
CY | 19.11.2014 | ||
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/25] | AT | 19.11.2014 | |
ES | 19.11.2014 | ||
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/24] | ES | 19.11.2014 | |
FI | 19.11.2014 | ||
HR | 19.11.2014 | ||
LT | 19.11.2014 | ||
LV | 19.11.2014 | ||
PL | 19.11.2014 | ||
SE | 19.11.2014 | ||
NO | 19.02.2015 | ||
GR | 20.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/23] | ES | 19.11.2014 | |
FI | 19.11.2014 | ||
LT | 19.11.2014 | ||
NO | 19.02.2015 | ||
IS | 19.03.2015 | ||
PT | 19.03.2015 | ||
Former [2015/22] | LT | 19.11.2014 | |
NO | 19.02.2015 | ||
PT | 19.03.2015 | ||
Former [2015/21] | LT | 19.11.2014 | |
NO | 19.02.2015 | ||
Former [2015/20] | LT | 19.11.2014 | Documents cited: | Search | [A]US2002159839 (FRIJNS TOM LAURENT HUBERT [NL], et al) [A] 1-8 * paragraphs [0026] , [0027] , [0034] - [0036] * * claims 1,4,5,9,12 * * figures 27-31 *; | [IA]WO2007108673 (ITREC BV [NL], et al) [I] 9 * page 33, line 20 - page 40, line 7 * * figures 22,23 * [A] 1-8,11; | [E]WO2009022177 (ACERGY UK LTD [GB], et al) [E] 9,10* the whole document * |