EP2623150 - ANTI-MICROBIAL CATHETER [Right-click to bookmark this link] | |||
Former [2013/32] | Anti-microbial catheter | ||
[2022/04] | Status | No opposition filed within time limit Status updated on 05.05.2023 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 27.05.2022 | ||
Former | Grant of patent is intended Status updated on 10.01.2022 | ||
Former | Examination is in progress Status updated on 15.09.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Avent, Inc. 5405 Windward Parkway Alpharetta, GA 30004 / US | [2015/08] |
Former [2013/32] | For all designated states KIMBERLY-CLARK WORLDWIDE, INC. 2300 Winchester Road Neenah, WI 54956 / US | Inventor(s) | 01 /
Porto, James, Dal 20 Edgewood Coto De Caza, CA California 92679 / US | 02 /
Deniega, Jose, Castillo 20961 Eagles Glenn Lake Forest, CA California 92630 / US | 03 /
Massengale, Roger 28 Harveston Mission Viejo, CA California 92692 / US | 04 /
Forrest, Kevin 306 Pasto Rico Rancho Santa Margarita, CA California 92688 / US | 05 /
Siminuk, Mark 23911 Larkwood Lane Lake Forest, CA California 92630 / US | [2013/32] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2022/26] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2013/32] | Davies, Christopher Robert Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 13165846.0 | 28.08.2006 | [2013/32] | Priority number, date | US20050216534 | 31.08.2005 Original published format: US 216534 | [2013/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2623150 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Type: | B1 Patent specification | No.: | EP2623150 | Date: | 29.06.2022 | Language: | EN | [2022/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.06.2013 | Classification | IPC: | A61M25/00, A61L29/02, A61L29/10, A61L27/54, A61L29/16 | [2013/32] | CPC: |
A61L27/54 (EP,US);
A61M31/00 (KR);
A61L29/02 (KR);
A61L29/10 (KR);
A61L29/16 (EP,US);
A61M25/0045 (EP,US);
A61M25/0069 (EP,US);
A61M25/007 (EP,US);
A61M25/01 (KR);
A61L2300/104 (EP,US);
A61L2300/404 (EP,US);
A61M2025/0056 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2022/26] |
Former [2013/32] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | ANTIMIKROBIELLER KATHETER | [2022/01] | English: | ANTI-MICROBIAL CATHETER | [2022/04] | French: | CATHETER ANTIMICROBIEN | [2022/01] |
Former [2013/32] | Antimikrobieller Katheter | ||
Former [2013/32] | Anti-microbial catheter | ||
Former [2013/32] | Cathéter antimicrobien | Examination procedure | 07.02.2014 | Amendment by applicant (claims and/or description) | 07.02.2014 | Examination requested [2014/12] | 14.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 24.01.2018 | Reply to a communication from the examining division | 05.12.2019 | Despatch of a communication from the examining division (Time limit: M06) | 29.05.2020 | Reply to a communication from the examining division | 11.01.2022 | Communication of intention to grant the patent | 20.05.2022 | Fee for grant paid | 20.05.2022 | Fee for publishing/printing paid | 20.05.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP06813797.5 / EP1928531 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20060813797) is 19.04.2011 | Opposition(s) | 30.03.2023 | No opposition filed within time limit [2023/23] | Fees paid | Renewal fee | 29.04.2013 | Renewal fee patent year 03 | 29.04.2013 | Renewal fee patent year 04 | 29.04.2013 | Renewal fee patent year 05 | 29.04.2013 | Renewal fee patent year 06 | 29.04.2013 | Renewal fee patent year 07 | 27.08.2013 | Renewal fee patent year 08 | 27.08.2014 | Renewal fee patent year 09 | 25.08.2015 | Renewal fee patent year 10 | 24.08.2016 | Renewal fee patent year 11 | 23.08.2017 | Renewal fee patent year 12 | 23.08.2018 | Renewal fee patent year 13 | 15.08.2019 | Renewal fee patent year 14 | 13.08.2020 | Renewal fee patent year 15 | 13.08.2021 | Renewal fee patent year 16 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.08.2006 | AT | 29.06.2022 | CY | 29.06.2022 | CZ | 29.06.2022 | DK | 29.06.2022 | EE | 29.06.2022 | ES | 29.06.2022 | FI | 29.06.2022 | IT | 29.06.2022 | LT | 29.06.2022 | LV | 29.06.2022 | MC | 29.06.2022 | NL | 29.06.2022 | PL | 29.06.2022 | RO | 29.06.2022 | SE | 29.06.2022 | SI | 29.06.2022 | SK | 29.06.2022 | TR | 29.06.2022 | IE | 28.08.2022 | LU | 28.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | BG | 29.09.2022 | GR | 30.09.2022 | IS | 29.10.2022 | PT | 31.10.2022 | DE | 01.03.2023 | [2024/29] |
Former [2024/21] | HU | 28.08.2006 | |
AT | 29.06.2022 | ||
CY | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2024/18] | HU | 28.08.2006 | |
AT | 29.06.2022 | ||
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2024/11] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
IT | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2023/42] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2023/37] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SI | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2023/35] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
DE | 01.03.2023 | ||
Former [2023/33] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
IE | 28.08.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/22] | AT | 29.06.2022 | |
CZ | 29.06.2022 | ||
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/21] | AT | 29.06.2022 | |
DK | 29.06.2022 | ||
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
LU | 28.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/16] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
MC | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/12] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
IS | 29.10.2022 | ||
PT | 31.10.2022 | ||
Former [2023/11] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
PL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/09] | AT | 29.06.2022 | |
EE | 29.06.2022 | ||
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
RO | 29.06.2022 | ||
SE | 29.06.2022 | ||
SK | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
PT | 31.10.2022 | ||
Former [2023/08] | AT | 29.06.2022 | |
ES | 29.06.2022 | ||
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/07] | AT | 29.06.2022 | |
FI | 29.06.2022 | ||
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2023/02] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
NL | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/49] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
LV | 29.06.2022 | ||
SE | 29.06.2022 | ||
BG | 29.09.2022 | ||
GR | 30.09.2022 | ||
Former [2022/47] | FI | 29.06.2022 | |
LT | 29.06.2022 | ||
SE | 29.06.2022 | Documents cited: | Search | [A]US4054139 (CROSSLEY KENT B) [A] 1-15 * column 1, line 5 - line 19 ** column 2, line 9 - column 3, line 36 *; | [YA]US5201724 (HUKINS DAVID W [US], et al) [Y] 10-15 * figures 1-4; claim 4 * * column 1, line 8 - line 10 * * column 2, line 4 - column 3, line 56 * * column 5, line 36 - line 61 * [A] 1-9; | [YA]WO0143788 (BARD INC C R [US]) [Y] 1-6,8 * claim 3 * * page 10, line 1 - page 11, line 15 * * page 35, line 4 - page 37, line 21 * [A] 7,9-15; | [XA]WO03009883 (DURECT CORP [US], et al) [X] 1,4,5,7,9 * figures 1,2 * * page 2, line 16 - line 21 * * page 4, line 10 * * page 8, line 16 - page 9, line 32 * * page 11, line 7 - line 17 * * page 12, line 1 - line 34 * * page 13, line 3 - line 31 * * page 16, line 1 - page 18, line 19 * [A] 2,3,6,8,10-15; | [YA]WO2004101052 (I FLOW CORP [US], et al) [Y] 1-6,8,10-15 * figures 6,9-11,13-18; claims 1,30,31,33-35 * * paragraphs [0023] , [0064] - [0088] - [0104] , [0111] * [A] 7,9 | by applicant | US5425723 | US5800407 | US6402735 |