| EP2801468 - Apparatus and method for fabricating containers [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.01.2019 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 26.01.2018 | ||
| Former | Grant of patent is intended Status updated on 18.09.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Discma AG Bösch 67 6331 Hünenberg / CH | [2015/10] |
| Former [2014/46] | For all designated states Nestec S.A. Avenue Nestlé 55 1800 Vevey / CH | Inventor(s) | 01 /
Chauvin, Guillaume 390, rue Croix de Mission 88410 MONTHUREUX SUR SAONE / FR | 02 /
Collin, Christophe Chemin du canal 5, Lotissement l'Alexandrin 13710 FUVEAU / FR | 03 /
Kannengiesser, Damien 2 rue Ligier Richier 88190 GOLBEY / FR | 04 /
Outreman, Jean-Tristan 29 Résidence les Romarins 13240 SEPTEMES LES VALLONS / FR | 05 /
Pellegatta, Jean-Louis Pessasse et Fontette 83470 SEILLONS SOURCE D'ARGENS / FR | [2014/46] | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2018/09] |
| Former [2014/46] | Rosolen-Delarue, Katell Nestec S.A. CT-IAM Avenue Nestlé 55 1800 Vevey / CH | Application number, filing date | 13166853.5 | 07.05.2013 | [2014/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2801468 | Date: | 12.11.2014 | Language: | EN | [2014/46] | Type: | B1 Patent specification | No.: | EP2801468 | Date: | 28.02.2018 | Language: | EN | [2018/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.08.2013 | Classification | IPC: | B29C49/58, B29C49/46, B29C49/12, // B29C49/06, B29K67/00, B29L31/00, B29K105/00, B29C49/60 | [2017/34] | CPC: |
B29C49/06 (EP,US);
B29C49/60 (EP,US);
B29C49/12 (EP,US);
B29C49/46 (EP,US);
B29C49/58 (EP,US);
B29C2049/023 (EP);
B29C2049/065 (US);
B29C2049/4664 (EP,US);
B29C2049/6054 (US);
|
| Former IPC [2014/46] | B29C49/06, B29C49/58, B29C49/46, B29C49/12, B29K67/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/26] |
| Former [2014/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung und Verfahren zur Herstellung von Behältern | [2014/46] | English: | Apparatus and method for fabricating containers | [2014/46] | French: | Appareil et procédé de fabrication des récipients | [2014/46] | Examination procedure | 12.05.2015 | Examination requested [2015/26] | 16.06.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 25.06.2015 | Amendment by applicant (claims and/or description) | 19.09.2017 | Communication of intention to grant the patent | 12.01.2018 | Fee for grant paid | 12.01.2018 | Fee for publishing/printing paid | 12.01.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.09.2017 | Opposition(s) | 29.11.2018 | No opposition filed within time limit [2019/06] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 25.06.2015 | Request for further processing filed | 25.06.2015 | Full payment received (date of receipt of payment) Request granted | 07.07.2015 | Decision despatched | Fees paid | Renewal fee | 28.05.2015 | Renewal fee patent year 03 | 26.05.2016 | Renewal fee patent year 04 | 24.05.2017 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.05.2013 | AL | 28.02.2018 | AT | 28.02.2018 | CY | 28.02.2018 | CZ | 28.02.2018 | DK | 28.02.2018 | EE | 28.02.2018 | ES | 28.02.2018 | FI | 28.02.2018 | HR | 28.02.2018 | LT | 28.02.2018 | LV | 28.02.2018 | MC | 28.02.2018 | MK | 28.02.2018 | NL | 28.02.2018 | PL | 28.02.2018 | PT | 28.02.2018 | RO | 28.02.2018 | RS | 28.02.2018 | SE | 28.02.2018 | SI | 28.02.2018 | SK | 28.02.2018 | SM | 28.02.2018 | TR | 28.02.2018 | IE | 07.05.2018 | LU | 07.05.2018 | MT | 07.05.2018 | BG | 28.05.2018 | GB | 28.05.2018 | NO | 28.05.2018 | GR | 29.05.2018 | BE | 31.05.2018 | IS | 28.06.2018 | [2020/33] |
| Former [2020/31] | HU | 07.05.2013 | |
| AL | 28.02.2018 | ||
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| MK | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| PT | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| TR | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| MT | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| BE | 31.05.2018 | ||
| Former [2020/28] | HU | 07.05.2013 | |
| AL | 28.02.2018 | ||
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| PT | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| TR | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| MT | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| BE | 31.05.2018 | ||
| Former [2020/16] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| TR | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| MT | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| BE | 31.05.2018 | ||
| Former [2020/08] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| MT | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| BE | 31.05.2018 | ||
| Former [2019/24] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| BE | 31.05.2018 | ||
| Former [2019/21] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| GB | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2019/19] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| IE | 07.05.2018 | ||
| LU | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2019/17] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| LU | 07.05.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2019/13] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SI | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2019/06] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| MC | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/52] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| SM | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/51] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| DK | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/50] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| CZ | 28.02.2018 | ||
| EE | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| PL | 28.02.2018 | ||
| RO | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| SK | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/46] | AL | 28.02.2018 | |
| AT | 28.02.2018 | ||
| CY | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/40] | AT | 28.02.2018 | |
| CY | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| BG | 28.05.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/39] | AT | 28.02.2018 | |
| CY | 28.02.2018 | ||
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| LV | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| RS | 28.02.2018 | ||
| SE | 28.02.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/37] | CY | 28.02.2018 | |
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| NO | 28.05.2018 | ||
| GR | 29.05.2018 | ||
| Former [2018/36] | CY | 28.02.2018 | |
| ES | 28.02.2018 | ||
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| NO | 28.05.2018 | ||
| Former [2018/35] | CY | 28.02.2018 | |
| FI | 28.02.2018 | ||
| HR | 28.02.2018 | ||
| LT | 28.02.2018 | ||
| NL | 28.02.2018 | ||
| NO | 28.05.2018 | Documents cited: | Search | [XI] WO2009007315 (KRONES AG et al.) | [XI] US6273705 (SCHOCH WALTER K et al.) [X] 1,3,8 * abstract *[I] 2,4-7,9-15 | [XI] JPH07227902 (TAHARA KK et al.) [X] 1,3,8 * abstract *[I] 2,4-7,9-15 | [A] US2012315348 (WILSON BRAD et al.) [A] 1-15 * abstract * | by applicant | FR2848905 |