blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2664479

EP2664479 - Secondary service port for high voltage battery packs [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  21.05.2019
FormerRequest for examination was made
Status updated on  25.05.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Tesla, Inc.
3500 Deer Creek Road
Palo Alto, CA 94304 / US
[2019/41]
Former [2013/47]For all designated states
Tesla Motors, Inc.
3500 Deer Creek Road
Palo Alto, CA 94304 / US
Inventor(s)01 / Goldman, Mark D.
505 Cypress Point Drive
Unit 165
Mountain View, California 94040 / US
02 / Boggs, Brian Stuart
50 Calle Lane
Menlo Park, California 94025 / US
03 / Darragh, Joseph Michael
4044 24th Street
San Francisco, California 94114 / US
 [2013/47]
Representative(s)Liesegang, Eva, et al
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2019/42]
Former [2013/47]Eisenführ, Speiser & Partner
Postfach 31 02 60
80102 München / DE
Application number, filing date13168339.317.05.2013
[2013/47]
Priority number, dateUS201261649293P19.05.2012         Original published format: US 201261649293 P
US201261662913P21.06.2012         Original published format: US 201261662913 P
[2013/47]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2664479
Date:20.11.2013
Language:EN
[2013/47]
Type: A3 Search report 
No.:EP2664479
Date:29.11.2017
Language:EN
[2017/48]
Type: B1 Patent specification 
No.:EP2664479
Date:16.10.2019
Language:EN
[2019/42]
Search report(s)(Supplementary) European search report - dispatched on:EP03.11.2017
ClassificationIPC:B60L3/00, B60L58/10, G01R31/36, H02J7/00
[2019/19]
CPC:
B60L58/26 (EP,US); B60L3/00 (US); B60L3/0046 (US);
B60L58/10 (EP,US); B60L58/14 (EP,US); B60L58/15 (EP,US);
B60L58/18 (EP); H02J7/0042 (US); B60L53/14 (EP,US);
B60L53/16 (EP,US); B60L53/60 (EP,US); G01R31/36 (US);
Y02T10/70 (EP) (-)
Former IPC [2017/48]B60L3/00, B60L11/18, G01R31/36, H02J7/00
Former IPC [2013/47]B60L3/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/26]
Former [2013/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Sekundäre Dienstleistungsanschlüsse für Hochspannungsbatteriepacks[2013/47]
English:Secondary service port for high voltage battery packs[2013/47]
French:Port de service secondaire pour blocs-batteries haute tension[2013/47]
Examination procedure17.05.2013Date on which the examining division has become responsible
18.05.2018Amendment by applicant (claims and/or description)
18.05.2018Examination requested  [2018/26]
22.05.2019Communication of intention to grant the patent
04.09.2019Fee for grant paid
04.09.2019Fee for publishing/printing paid
04.09.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.05.2019
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
26.05.2015Renewal fee patent year 03
04.03.2016Renewal fee patent year 04
09.05.2017Renewal fee patent year 05
09.05.2018Renewal fee patent year 06
27.05.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.05.2013
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE17.05.2020
LU17.05.2020
CH31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]HU17.05.2013
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE17.05.2020
LU17.05.2020
CH31.05.2020
LI31.05.2020
Former [2022/26]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE17.05.2020
LU17.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/20]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE17.05.2020
LU17.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
LU17.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/12]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
CH31.05.2020
LI31.05.2020
Former [2021/08]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
CH31.05.2020
LI31.05.2020
Former [2020/51]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
AT16.10.2019
CZ16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
AT16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]AT16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]AT16.10.2019
ES16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]AT16.10.2019
ES16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NO16.01.2020
Documents cited:Search[A]US2009096410  (SAKURAI MASATO [JP]) [A] 1-15 * abstract *;
 [XI]US2010315040  (SAKURAI MASATO [JP]) [X] 1-4,6-10,12-14 * abstract * [I] 11,15;
 [A]WO2012014968  (SANYO ELECTRIC CO [JP], et al) [A] 1-15* abstract *;
 [A]DE102010041024  (SB LIMOTIVE CO LTD [KR], et al) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.