EP2818347 - Connection arrangement for releasable connection of a first and a second portion of a side collision safety structure of a vehicle [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 16.05.2019 | ||
Former | Examination is in progress Status updated on 08.05.2019 | ||
Former | Grant of patent is intended Status updated on 10.03.2019 | ||
Former | Examination is in progress Status updated on 20.07.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Volvo Car Corporation Intellectual Property VAK - HBBVN 40 531 Göteborg / SE | [2019/32] |
Former [2015/01] | For all designated states Volvo Car Corporation Intellectual Property VAK - HBBVN 40 531 Göteborg / SE | Inventor(s) | 01 /
Lund, Kjell-Åke Hasselvägen 71 43538 Mölnlycke / SE | 02 /
Svensson, Fredrik Hunnebergsgatan 14 46139 Trollhättan / SE | [2015/01] | Representative(s) | Valea AB Box 1098 405 23 Göteborg / SE | [2019/32] |
Former [2015/01] | Kraenzmer, Martin, et al Volvo Car Corporation Intellectual Property Dept 50094 HBBVN 405 31 Göteborg / SE | Application number, filing date | 13173997.1 | 27.06.2013 | [2015/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2818347 | Date: | 31.12.2014 | Language: | EN | [2015/01] | Type: | B1 Patent specification | No.: | EP2818347 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.11.2013 | Classification | IPC: | B60J5/04 | [2015/01] | CPC: |
B60J5/045 (EP);
B60J5/0458 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/33] |
Former [2015/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verbindungsanordnung zum lösbaren Verbinden eines ersten und eines zweiten Teils einer Seitenaufprallsicherheitsstruktur eines Fahrzeugs | [2015/01] | English: | Connection arrangement for releasable connection of a first and a second portion of a side collision safety structure of a vehicle | [2015/01] | French: | Système de connexion pour raccordement libérable d'une première et d'une seconde partie d'une structure de sécurité de collision latérale d'un véhicule | [2015/01] | Examination procedure | 12.01.2015 | Amendment by applicant (claims and/or description) | 30.06.2015 | Examination requested [2015/33] | 19.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 13.11.2018 | Reply to a communication from the examining division | 11.03.2019 | Communication of intention to grant the patent | 06.05.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.05.2019 | Communication of intention to grant the patent | 21.05.2019 | Fee for grant paid | 21.05.2019 | Fee for publishing/printing paid | 21.05.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.07.2018 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 30.06.2015 | Renewal fee patent year 03 | 30.06.2016 | Renewal fee patent year 04 | 30.06.2017 | Renewal fee patent year 05 | 02.07.2018 | Renewal fee patent year 06 | 01.07.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.06.2013 | AL | 07.08.2019 | AT | 07.08.2019 | CY | 07.08.2019 | CZ | 07.08.2019 | DK | 07.08.2019 | EE | 07.08.2019 | ES | 07.08.2019 | FI | 07.08.2019 | HR | 07.08.2019 | LT | 07.08.2019 | LV | 07.08.2019 | MC | 07.08.2019 | MK | 07.08.2019 | MT | 07.08.2019 | NL | 07.08.2019 | PL | 07.08.2019 | RO | 07.08.2019 | RS | 07.08.2019 | SE | 07.08.2019 | SI | 07.08.2019 | SK | 07.08.2019 | SM | 07.08.2019 | TR | 07.08.2019 | BG | 07.11.2019 | NO | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | PT | 09.12.2019 | [2022/32] |
Former [2022/27] | HU | 27.06.2013 | |
AL | 07.08.2019 | ||
AT | 07.08.2019 | ||
CY | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
MT | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2021/12] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
MC | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/37] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SI | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/36] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/27] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
SM | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
CZ | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
SK | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 07.08.2019 | |
AT | 07.08.2019 | ||
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
PL | 07.08.2019 | ||
RO | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/22] | AL | 07.08.2019 | |
DK | 07.08.2019 | ||
EE | 07.08.2019 | ||
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/17] | AL | 07.08.2019 | |
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
TR | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/15] | AL | 07.08.2019 | |
ES | 07.08.2019 | ||
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/12] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
PT | 09.12.2019 | ||
Former [2020/11] | ES | 07.08.2019 | |
FI | 07.08.2019 | ||
HR | 07.08.2019 | ||
LT | 07.08.2019 | ||
LV | 07.08.2019 | ||
NL | 07.08.2019 | ||
RS | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
GR | 08.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/10] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
SE | 07.08.2019 | ||
BG | 07.11.2019 | ||
NO | 07.11.2019 | ||
PT | 09.12.2019 | ||
Former [2020/09] | FI | 07.08.2019 | |
LT | 07.08.2019 | ||
NL | 07.08.2019 | ||
NO | 07.11.2019 | ||
Former [2020/08] | LT | 07.08.2019 | |
NO | 07.11.2019 | Documents cited: | Search | [XYI]US3887227 (DECKERT FRANZ) [X] 1-3,5,7,9,10,12-15 * abstract * * figures 1-4 * * column 2, lines 6-13, 31-32 * * claim 36 * * column 3, lines 47-52 * [Y] 8 [I] 11; | [X]US5431476 (TORIGAKI TOSHIKAZU [JP]) [X] 1-7,9,10,12,13 * abstract * * figures 1-7, 9, 22 * * column 4, lines 15-21 *; | [Y]WO0015454 (JOALTO DESIGN INC [US], et al) [Y] 8* figure 1 * | by applicant | US5137325 | JPH11321499 |