blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2824287

EP2824287 - Pressure casing of a turbomachine [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  12.12.2019
FormerExamination is in progress
Status updated on  18.05.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Ansaldo Energia IP UK Limited
5th Floor, North Side
7/10 Chandos Street
Cavendish Square
London W1G 9DQ / GB
[2017/22]
Former [2016/33]For all designated states
General Electric Technology GmbH
Brown Boveri Strasse 7
5400 Baden / CH
Former [2015/03]For all designated states
ALSTOM Technology Ltd
Brown Boveri Strasse 7
5400 Baden / CH
Inventor(s)01 / Busekros, Armin
Im oberen Boden 23
8049 Zurich / CH
02 / Przybyl, Robert
Stumpenweg 66
5303 Wuerenlingen / CH
03 / Jeunet-Mancy, Gregory
Am Gottesgraben 13
5430 Wettingen / CH
 [2015/03]
Representative(s)Bernotti, Andrea, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2020/20]
Application number, filing date13175613.208.07.2013
[2015/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2824287
Date:14.01.2015
Language:EN
[2015/03]
Type: B1 Patent specification 
No.:EP2824287
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP30.01.2014
ClassificationIPC:F01D25/12, F01D25/14, F01D25/24
[2015/03]
CPC:
F01D25/12 (EP,US); F01D25/24 (CN); F01D25/26 (US);
F01D25/125 (CN); F01D25/14 (EP,US); F01D25/243 (EP,CN,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/34]
Former [2015/03]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Druckgehäuse einer Turbomaschine[2015/03]
English:Pressure casing of a turbomachine[2015/03]
French:Carter sous pression d'une turbomachine[2015/03]
Examination procedure13.07.2015Amendment by applicant (claims and/or description)
13.07.2015Examination requested  [2015/34]
23.05.2018Despatch of a communication from the examining division (Time limit: M04)
02.10.2018Reply to a communication from the examining division
19.10.2018Despatch of a communication from the examining division (Time limit: M06)
29.04.2019Reply to a communication from the examining division
13.12.2019Communication of intention to grant the patent
06.04.2020Fee for grant paid
06.04.2020Fee for publishing/printing paid
06.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.05.2018
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
23.07.2015Renewal fee patent year 03
22.07.2016Renewal fee patent year 04
24.07.2017Renewal fee patent year 05
27.07.2018Renewal fee patent year 06
25.07.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.07.2013
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE08.07.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
GB13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/32]
Former [2022/27]HU08.07.2013
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE08.07.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
GB13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2022/26]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE08.07.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
GB13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/38]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE08.07.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
GB13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/37]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE08.07.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/23]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
LU08.07.2020
FR13.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU08.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/13]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[A]CH385248  (LICENTIA GMBH [DE]) [A] 1* the whole document *;
 [X]JPS61200310  (FUJI ELECTRIC CO LTD) [X] 1-13 * abstract *;
 [X]DE3733243  (TOSHIBA KAWASAKI KK [JP]) [X] 1-13 * column 7, line 38 - line 53; figures 15,16 *;
 [AD]WO03078799  (ALSTOM SWITZERLAND LTD [CH], et al) [AD] 1-13 * abstract *;
 [XD]EP1096111  (MITSUBISHI HEAVY IND LTD [JP]) [XD] 1-13 * paragraph [0004]; figure 5 *
ExaminationUS6352404
by applicantDE10225260
 WO03078799
 EP1096111
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.