EP2684855 - SHIELDING COMPOSITE BUILDING MATERIALS WITH A LOW INTERNAL LEVEL OF IONISING RADIATION [Right-click to bookmark this link] | |||
Former [2014/03] | Shielding composite building materials with a low internal level of ionising radiation. | ||
[2020/19] | Status | No opposition filed within time limit Status updated on 16.07.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 07.08.2020 | ||
Former | Grant of patent is intended Status updated on 14.04.2020 | ||
Former | Examination is in progress Status updated on 16.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states SOLETANCHE FREYSSINET 280 avenue Napoléon Bonaparte 92500 Rueil Malmaison / FR | [2015/01] |
Former [2014/03] | For all designated states Soletanche Freyssinet 133 Boulevard National 92500 Rueil Malmaison / FR | Inventor(s) | 01 /
Kovár, Petr Netlucká 104/20 10 Prague / CZ | 02 /
Surán, Jirí Hermánková 126 10 Praha / CZ | 03 /
Vágner, Frantisek Javorová 1018 Trebíc / CZ | [2015/15] |
Former [2014/03] | 01 /
Kovar, Petr Netlucká 104/20 10 PRAGUE / CZ | ||
02 /
Suran, Jirí Hermánková 126 10 PRAHA / CZ | |||
03 /
Vagner, Frantisek Javorová 1018 Trebíc / CZ | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2020/37] | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | ||
Former [2014/03] | Cabinet Plasseraud 52, rue de la Victoire 75440 Paris Cedex 09 / FR | Application number, filing date | 13176226.2 | 11.07.2013 | [2014/03] | Priority number, date | CZ20120000478 | 12.07.2012 Original published format: CZ 20120478 | [2014/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2684855 | Date: | 15.01.2014 | Language: | EN | [2014/03] | Type: | A3 Search report | No.: | EP2684855 | Date: | 03.09.2014 | Language: | EN | [2014/36] | Type: | B1 Patent specification | No.: | EP2684855 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.08.2014 | Classification | IPC: | C04B26/14, C04B28/02, G21F1/04, G21F1/00, G21F1/10, G21F3/00, G21F3/04, // C04B111/00 | [2014/36] | CPC: |
C04B26/14 (EP,US);
G21F3/00 (US);
C04B28/02 (EP,US);
G21F1/00 (US);
G21F1/042 (EP,US);
G21F1/10 (EP,US);
| C-Set: |
C04B26/14, C04B14/02, C04B20/0076, C04B2103/0098 (US,EP);
C04B28/02, C04B14/02, C04B20/0076, C04B2103/0098, C04B2103/30 (EP,US) |
Former IPC [2014/03] | C04B26/14, C04B28/02, G21F1/04, // C04B111/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/37] |
Former [2014/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ABSCHIRMUNGSVERBUNDBAUSTOFFE MIT NIEDRIGEM INTERNEN GEHALT AN IONISIERENDER STRAHLUNG | [2020/20] | English: | SHIELDING COMPOSITE BUILDING MATERIALS WITH A LOW INTERNAL LEVEL OF IONISING RADIATION | [2020/20] | French: | MATÉRIAUX DE CONSTRUCTION COMPOSITE DE BLINDAGE AVEC UN FAIBLE NIVEAU INTERNE DE RAYONNEMENT IONISANT | [2020/20] |
Former [2014/03] | Abschirmungsverbundbaustoffe mit niedrigem internen Level an ionisierender Strahlung | ||
Former [2014/03] | Shielding composite building materials with a low internal level of ionising radiation. | ||
Former [2014/03] | Matériaux de construction composite de blindage avec un faible niveau interne de rayonnement ionisant | Examination procedure | 03.03.2015 | Amendment by applicant (claims and/or description) | 03.03.2015 | Examination requested [2015/15] | 09.09.2016 | Despatch of a communication from the examining division (Time limit: M06) | 13.03.2017 | Reply to a communication from the examining division | 15.04.2020 | Communication of intention to grant the patent | 31.07.2020 | Fee for grant paid | 31.07.2020 | Fee for publishing/printing paid | 31.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.09.2016 | Opposition(s) | 10.06.2021 | No opposition filed within time limit [2021/33] | Fees paid | Renewal fee | 06.07.2015 | Renewal fee patent year 03 | 27.06.2016 | Renewal fee patent year 04 | 27.06.2017 | Renewal fee patent year 05 | 27.06.2018 | Renewal fee patent year 06 | 27.06.2019 | Renewal fee patent year 07 | 22.06.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2013 | AL | 09.09.2020 | AT | 09.09.2020 | CY | 09.09.2020 | DK | 09.09.2020 | EE | 09.09.2020 | ES | 09.09.2020 | FI | 09.09.2020 | HR | 09.09.2020 | IT | 09.09.2020 | MC | 09.09.2020 | MK | 09.09.2020 | MT | 09.09.2020 | NL | 09.09.2020 | RO | 09.09.2020 | RS | 09.09.2020 | SE | 09.09.2020 | SI | 09.09.2020 | SM | 09.09.2020 | TR | 09.09.2020 | NO | 09.12.2020 | GR | 10.12.2020 | IS | 09.01.2021 | PT | 11.01.2021 | [2024/41] |
Former [2024/29] | HU | 11.07.2013 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
MC | 09.09.2020 | ||
MK | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
TR | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2024/22] | HU | 11.07.2013 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
MC | 09.09.2020 | ||
MK | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2023/30] | HU | 11.07.2013 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
CY | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2023/29] | HU | 11.07.2013 | |
AL | 09.09.2020 | ||
AT | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2022/18] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
MC | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/48] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
IT | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/37] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
DK | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/36] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SI | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/25] | AL | 09.09.2020 | |
AT | 09.09.2020 | ||
EE | 09.09.2020 | ||
ES | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
IS | 09.01.2021 | ||
PT | 11.01.2021 | ||
Former [2021/24] | AT | 09.09.2020 | |
EE | 09.09.2020 | ||
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/23] | EE | 09.09.2020 | |
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
SM | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/22] | EE | 09.09.2020 | |
FI | 09.09.2020 | ||
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RO | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/21] | FI | 09.09.2020 | |
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
PT | 11.01.2021 | ||
Former [2021/18] | FI | 09.09.2020 | |
HR | 09.09.2020 | ||
NL | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/11] | FI | 09.09.2020 | |
HR | 09.09.2020 | ||
RS | 09.09.2020 | ||
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/09] | FI | 09.09.2020 | |
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
GR | 10.12.2020 | ||
Former [2021/08] | FI | 09.09.2020 | |
SE | 09.09.2020 | ||
NO | 09.12.2020 | ||
Former [2021/07] | FI | 09.09.2020 | |
NO | 09.12.2020 | Documents cited: | Search | [A]DE913000 (BORIS RAJEWSKY DR) [A] 1-10 * the whole document *; | [A]DE1094432 (HEINRICH DRATH, et al) [A] 1 * the whole document *; | [I]GB1073716 (ZENTRALINSTITUT FUER KERNFORSC) [I] 1-10 * the whole document *; | [A]FR1603362 (GAILLARD, A.) [A] 1 * the whole document *; | [A]DE3821684 (WESTARP MARTIN DR [DE]) [A] 1 * abstract * * claims 1-6 *; | [A]US5416333 (GREENSPAN EHUD [US]) [A] 1 * abstract * * claims 1-23 *; | [A]AT405773B (HASCIC WLADIMIR DR [AT]) [A] 1 * abstract * * the whole document *; | [A]WO2008016053 (HAZAMA GUMI [JP], et al) [A] 1 * abstract *; | [X]DE112006002706T (LTD LIABILITY COMPANY ORGANIKS [RU]) [X] 1 * abstract * * paragraph [0008] - paragraph [0011] * * claims 1-6 *; | [A]DE102008056469 (BAUHAUS UNI WEIMAR F A FINGER [DE], et al) [A] 1 * abstract * * paragraph [0001] ** claims 1-7 *; | [A] - EDWIN J CALLAN, "Concrete for Radiation Shielding", AMERICAN CONCRETE INSTITUTE, PROCEEDINGS,, (19530901), vol. 50, no. 9, pages 17 - 44, XP009136047 [A] 1 * abstract * | [A] - BASHTER I I ET AL, "MAGNETIC ORES WITH STEEL OR BASALT FOR CONCRETE RADIATION SHIELDING", JAPANESE JOURNAL OF APPLIED PHYSICS, JAPAN SOCIETY OF APPLIED PHYSICS, JP, (19970601), vol. 36, no. 6A, PART 01, doi:10.1143/JJAP.36.3692, ISSN 0021-4922, pages 3692 - 3696, XP000732441 [A] 1 * abstract * DOI: http://dx.doi.org/10.1143/JJAP.36.3692 | Examination | - LIZUREK G ET AL, "Natural radioactivity of paleozoic and mesozoic sedimentary rocks from the Upper Silesian Coal Basin borders (Poland) - in situ gamma ray measurements", CZECHOSLOVAK JOURNAL OF PHYSICS, KLUWER ACADEMIC PUBLISHERS-CONSULTANTS BUREAU, NE, (20061201), vol. 56, no. 4, doi:10.1007/S10582-006-0493-8, ISSN 1572-9486, pages D95 - D102, XP019464385 DOI: http://dx.doi.org/10.1007/s10582-006-0493-8 |