EP2830200 - A power converter [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 20.12.2021 | ||
Former | Examination is in progress Status updated on 14.12.2016 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | [2022/19] |
Former [2016/47] | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | ||
Former [2015/05] | For all designated states ALSTOM Technology Ltd Brown Boveri Strasse 7 5400 Baden / CH | Inventor(s) | 01 /
BARKER, Carl David 6 Foxwood Close Walton, Stone Staffordshire ST15 0LN / GB | [2015/05] | Representative(s) | Openshaw & Co. 8 Castle Street Farnham, Surrey GU9 7HR / GB | [2022/19] |
Former [2015/05] | Potter Clarkson LLP The Belgrave Centre Talbot Street Nottingham, NG1 5GG / GB | Application number, filing date | 13177961.3 | 25.07.2013 | [2015/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2830200 | Date: | 28.01.2015 | Language: | EN | [2015/05] | Type: | B1 Patent specification | No.: | EP2830200 | Date: | 11.05.2022 | Language: | EN | [2022/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.12.2013 | Classification | IPC: | H02M1/32, H02M7/483 | [2015/05] | CPC: |
H02M7/483 (EP,US);
H02M1/32 (EP,US);
H02M5/42 (US);
H02M7/4835 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/30] |
Former [2015/05] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Leistungswandler | [2015/05] | English: | A power converter | [2015/05] | French: | Convertisseur de puissance | [2015/05] | Examination procedure | 10.06.2015 | Amendment by applicant (claims and/or description) | 12.06.2015 | Examination requested [2015/30] | 05.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 02.02.2016 | Reply to a communication from the examining division | 09.06.2016 | Despatch of a communication from the examining division (Time limit: M06) | 13.12.2016 | Reply to a communication from the examining division | 05.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 10.07.2018 | Reply to a communication from the examining division | 22.10.2019 | Despatch of a communication from the examining division (Time limit: M06) | 20.04.2020 | Reply to a communication from the examining division | 07.07.2020 | Despatch of a communication from the examining division (Time limit: M06) | 06.01.2021 | Reply to a communication from the examining division | 16.03.2021 | Despatch of a communication from the examining division (Time limit: M06) | 16.09.2021 | Reply to a communication from the examining division | 21.12.2021 | Communication of intention to grant the patent | 01.04.2022 | Fee for grant paid | 01.04.2022 | Fee for publishing/printing paid | 01.04.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.10.2015 | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] | Fees paid | Renewal fee | 10.07.2015 | Renewal fee patent year 03 | 27.07.2016 | Renewal fee patent year 04 | 31.07.2017 | Renewal fee patent year 05 | 03.08.2018 | Renewal fee patent year 06 | 22.07.2019 | Renewal fee patent year 07 | 22.07.2020 | Renewal fee patent year 08 | 20.07.2021 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 31.07.2018 | 06   M06   Fee paid on   31.01.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.07.2013 | AL | 11.05.2022 | AT | 11.05.2022 | CY | 11.05.2022 | CZ | 11.05.2022 | DK | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | IT | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | MK | 11.05.2022 | NL | 11.05.2022 | PL | 11.05.2022 | RO | 11.05.2022 | RS | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | SM | 11.05.2022 | TR | 11.05.2022 | IE | 25.07.2022 | LU | 25.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | BG | 11.08.2022 | NO | 11.08.2022 | GR | 12.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | [2024/29] |
Former [2024/22] | HU | 25.07.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
MK | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 25.07.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2024/20] | HU | 25.07.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 25.07.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2024/18] | HU | 25.07.2013 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 25.07.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2024/11] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 25.07.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/33] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 25.07.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/25] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
LU | 25.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/21] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
LU | 25.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/17] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/11] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/07] | AT | 11.05.2022 | |
DK | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/48] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
NL | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Documents cited: | Search | [A]WO2011050847 (AREVA T & D UK LTD [GB], et al) [A] 1-10 * figure 8 ** page 22, line 10 - page 23, line 14 *; | [I]WO2011124260 (AREVA T & D UK LTD [GB], et al) [I] 1-10 * figures 13-14 * * page 42, line 29 - page 43, line 30 *; | [I]WO2012103936 (SIEMENS AG [DE], et al) [I] 1-10 * figure 2 * * abstract * * page 4, line 6 - line 10 * * page 6, line 27 - page 8, line 5 *; | [I]EP2602927 (HITACHI LTD [JP]) [I] 1-10 * figures 1-3 * * figure 8 * * paragraph [0025] * * paragraph [0033] * * paragraph [0039] - paragraph [0040] * * paragraph [0049] - paragraph [0050] * * paragraph [0062] * * paragraph [0177] * | Examination | CN102969732 | US2013128636 | - AREDES M ET AL, "A 25-MW Soft-Switching HVDC Tap for DOI: http://dx.doi.org/10.1109/TPWRD.2004.835053 | - XIAOFANG CHEN ET AL, "Research on the fault characteristics of HVDC based on modular multilevel converter", ELECTRICAL POWER AND ENERGY CONFERENCE (EPEC), 2011 IEEE, IEEE, (20111003), doi:10.1109/EPEC.2011.6070260, ISBN 978-1-4577-0405-5, pages 91 - 96, XP031974626 DOI: http://dx.doi.org/10.1109/EPEC.2011.6070260 |