EP2692950 - Component for the erection of mobile guard barriers on roadways [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.04.2019 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 27.04.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | ||
Former | Examination is in progress Status updated on 13.10.2017 | ||
Former | Request for examination was made Status updated on 19.05.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states SPIG Schutzplanken-Produktions-GmbH & Co. KG Edmund Meiser Straße 3 66839 Schmelz-Limbach / DE | [2018/22] |
Former [2014/06] | For all designated states SPIG Schutzplanken-Produktions-GmbH & Co. KG Edmund Meiser Straße 3 66839 Schmelz-Limbach / DE | Inventor(s) | 01 /
Thewes, Werner Geiselwieslach 9 66839 Schmelz / DE | 02 /
Lenhardt, Erwin Birkenweg 4 66687 Wadern-Nunkirchen / DE | [2014/12] |
Former [2014/06] | 01 /
Thewes, Werner Geiselwieslach 9 66839 Schmelz / DE | ||
02 /
Lenhart, Erwin Birkenweg 4 66687 Wadern-Nunkirchen / DE | Representative(s) | Ksoll, Peter, et al Bockermann Ksoll Griepenstroh Osterhoff Patentanwälte Bergstrasse 159 44791 Bochum / DE | [2018/22] |
Former [2014/06] | Bernhardt, Reinhold Patentanwälte Bernhardt Partnerschaft Europaallee 17 66113 Saarbrücken / DE | Application number, filing date | 13178317.7 | 29.07.2013 | [2014/06] | Priority number, date | DE201210106933 | 30.07.2012 Original published format: DE102012106933 | [2014/06] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2692950 | Date: | 05.02.2014 | Language: | DE | [2014/06] | Type: | A8 Corrected patent application | No.: | EP2692950 | Date: | 26.03.2014 | [2014/13] | Type: | A3 Search report | No.: | EP2692950 | Date: | 16.11.2016 | Language: | DE | [2016/46] | Type: | B1 Patent specification | No.: | EP2692950 | Date: | 30.05.2018 | Language: | DE | [2018/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.10.2016 | Classification | IPC: | E01F15/08 | [2014/06] | CPC: |
E01F15/085 (EP);
E01F15/088 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/25] |
Former [2014/06] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Bauelement für die Errichtung mobiler Schutzbarrieren an Fahrbahnen | [2014/12] | English: | Component for the erection of mobile guard barriers on roadways | [2014/06] | French: | Elément de construction pour l'édification de barrières de protection mobiles au niveau de voies de circulation | [2014/06] |
Former [2014/06] | Bauelement für die Errichtung mobiler Schutzrbarrieren an Fahrbahnen | Examination procedure | 29.07.2013 | Date on which the examining division has become responsible | 11.05.2017 | Amendment by applicant (claims and/or description) | 11.05.2017 | Examination requested [2017/25] | 12.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 26.10.2017 | Reply to a communication from the examining division | 01.02.2018 | Communication of intention to grant the patent | 16.04.2018 | Fee for grant paid | 16.04.2018 | Fee for publishing/printing paid | 16.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.10.2017 | Opposition(s) | 01.03.2019 | No opposition filed within time limit [2019/19] | Fees paid | Renewal fee | 29.06.2015 | Renewal fee patent year 03 | 05.07.2016 | Renewal fee patent year 04 | 28.07.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.07.2013 | AL | 30.05.2018 | CY | 30.05.2018 | CZ | 30.05.2018 | DK | 30.05.2018 | EE | 30.05.2018 | FI | 30.05.2018 | HR | 30.05.2018 | IT | 30.05.2018 | LT | 30.05.2018 | LV | 30.05.2018 | MC | 30.05.2018 | MK | 30.05.2018 | MT | 30.05.2018 | PL | 30.05.2018 | PT | 30.05.2018 | RO | 30.05.2018 | RS | 30.05.2018 | SE | 30.05.2018 | SI | 30.05.2018 | SK | 30.05.2018 | SM | 30.05.2018 | TR | 30.05.2018 | AT | 29.07.2018 | IE | 29.07.2018 | LU | 29.07.2018 | BE | 31.07.2018 | CH | 31.07.2018 | LI | 31.07.2018 | BG | 30.08.2018 | NO | 30.08.2018 | GR | 31.08.2018 | IS | 30.09.2018 | [2020/33] |
Former [2020/31] | HU | 29.07.2013 | |
AL | 30.05.2018 | ||
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
MK | 30.05.2018 | ||
MT | 30.05.2018 | ||
PL | 30.05.2018 | ||
PT | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
AT | 29.07.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2020/27] | HU | 29.07.2013 | |
AL | 30.05.2018 | ||
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
MT | 30.05.2018 | ||
PL | 30.05.2018 | ||
PT | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
AT | 29.07.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2020/16] | AL | 30.05.2018 | |
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
MT | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
AT | 29.07.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2020/08] | AL | 30.05.2018 | |
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
MT | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
AT | 29.07.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2020/03] | AL | 30.05.2018 | |
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
AT | 29.07.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/51] | AL | 30.05.2018 | |
CY | 30.05.2018 | ||
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/33] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
IE | 29.07.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/26] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/24] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
LU | 29.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/21] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
LU | 29.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/17] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
LU | 29.07.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/15] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/11] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/10] | CY | 30.05.2018 | |
CZ | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/09] | CY | 30.05.2018 | |
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/08] | CY | 30.05.2018 | |
DK | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2018/52] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2018/51] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/50] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/49] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
LT | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/47] | FI | 30.05.2018 | |
LT | 30.05.2018 | ||
NO | 30.08.2018 | Documents cited: | Search | [XD]DE3827030 (SPIG SCHUTZPLANKEN PROD GMBH [DE]) [XD] 1,3-6,10,12,15 * the whole document *; | [X]DE19718227 (SPIG SCHUTZPLANKEN PROD GMBH [DE]) [X] 1-10,12,15 * column 5, lines 16-61; figures 1,2,3,4,5,7 *; | [X]DE19833560 (WINKLER GERHARD [DE]) [X] 1-4,6,10,12,15* figures 1,6; claim 1 * | by applicant | DE3827030 | EP1418274 | DE102006047808 |