EP2717311 - Efficient cooling duct [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 28.02.2020 | ||
Former | Grant of patent is intended Status updated on 10.10.2019 | ||
Former | Examination is in progress Status updated on 15.06.2018 | ||
Former | Request for examination was made Status updated on 16.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Hamilton Sundstrand Corporation Four Coliseum Centre 2730 West Tyvola Road Charlotte, NC 28217 / US | [2019/49] |
Former [2014/15] | For all designated states Hamilton Sundstrand Corporation One Hamilton Road Windsor Locks, CT 06096-1010 / US | Inventor(s) | 01 /
Downing, Robert Scott 6761 Rote Road Rockford, IL 61107 / US | [2014/15] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/14] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2014/15] | Bridge, Kerry Ann Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 13187185.7 | 02.10.2013 | [2014/15] | Priority number, date | US201213647018 | 08.10.2012 Original published format: US201213647018 | [2014/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2717311 | Date: | 09.04.2014 | Language: | EN | [2014/15] | Type: | A3 Search report | No.: | EP2717311 | Date: | 13.09.2017 | Language: | EN | [2017/37] | Type: | B1 Patent specification | No.: | EP2717311 | Date: | 01.04.2020 | Language: | EN | [2020/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.08.2017 | Classification | IPC: | H01L23/467 | [2014/15] | CPC: |
H01L23/467 (EP,US);
H01L2924/0002 (EP,US)
| C-Set: |
H01L2924/0002, H01L2924/00 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/16] |
Former [2014/15] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Effizienter Kühlkanal | [2014/15] | English: | Efficient cooling duct | [2014/15] | French: | Conduit de refroidissement efficace | [2014/15] | Examination procedure | 02.10.2013 | Date on which the examining division has become responsible | 13.03.2018 | Amendment by applicant (claims and/or description) | 13.03.2018 | Examination requested [2018/16] | 18.06.2018 | Despatch of a communication from the examining division (Time limit: M06) | 20.12.2018 | Reply to a communication from the examining division | 30.01.2019 | Despatch of a communication from the examining division (Time limit: M06) | 06.08.2019 | Reply to a communication from the examining division | 11.10.2019 | Communication of intention to grant the patent | 13.02.2020 | Fee for grant paid | 13.02.2020 | Fee for publishing/printing paid | 13.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.06.2018 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 26.10.2015 | Renewal fee patent year 03 | 25.10.2016 | Renewal fee patent year 04 | 23.10.2017 | Renewal fee patent year 05 | 26.10.2018 | Renewal fee patent year 06 | 21.10.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.10.2013 | AL | 01.04.2020 | AT | 01.04.2020 | CY | 01.04.2020 | CZ | 01.04.2020 | DK | 01.04.2020 | EE | 01.04.2020 | ES | 01.04.2020 | FI | 01.04.2020 | HR | 01.04.2020 | IT | 01.04.2020 | LT | 01.04.2020 | LV | 01.04.2020 | MC | 01.04.2020 | MK | 01.04.2020 | MT | 01.04.2020 | NL | 01.04.2020 | PL | 01.04.2020 | RO | 01.04.2020 | RS | 01.04.2020 | SE | 01.04.2020 | SI | 01.04.2020 | SK | 01.04.2020 | SM | 01.04.2020 | TR | 01.04.2020 | BG | 01.07.2020 | NO | 01.07.2020 | GR | 02.07.2020 | IS | 01.08.2020 | PT | 17.08.2020 | IE | 02.10.2020 | LU | 02.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | [2022/32] |
Former [2022/27] | HU | 02.10.2013 | |
AL | 01.04.2020 | ||
AT | 01.04.2020 | ||
CY | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
MT | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
TR | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
IE | 02.10.2020 | ||
LU | 02.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2022/26] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
TR | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
IE | 02.10.2020 | ||
LU | 02.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/46] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
IE | 02.10.2020 | ||
LU | 02.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/37] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
LU | 02.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/36] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
LU | 02.10.2020 | ||
BE | 31.10.2020 | ||
Former [2021/31] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
LU | 02.10.2020 | ||
Former [2021/24] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 01.04.2020 | |
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SM | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 01.04.2020 | |
CZ | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/49] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
LT | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 01.04.2020 | |
LT | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 01.04.2020 | |
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
Former [2020/46] | BG | 01.07.2020 | |
IS | 01.08.2020 | ||
Former [2020/39] | BG | 01.07.2020 | Documents cited: | Search | [X]US4953634 (NELSON RICHARD D [US], et al) [X] 1,14 * column 4, line 55 - column 5, line 2; figures 3-5,12 * * column 5, lines 45-59 *; | [XI]GB2296132 (SIEMENS PLESSEY ELECTRONIC [GB]) [X] 1,4-6,14,15 * page 1, lines 4-8; figures 1,2; claims 1-5 * * page 3, line 9 - page 4, line 13 * [I] 2,3,7-13; | [A]WO9914807 (RF POWER PRODUCTS INC [US], et al) [A] 1,9,14* page 9, lines 1-29; figure 11 *; | [X]GB2358243 (3COM CORP [US]) [X] 1,5,6,14,15 * page 14, line 10 - page 16, line 21; figures 5,7,8,12; claims 1-3 * | Examination | GB2347020 | US6330153 |