blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2727476

EP2727476 - Method of processing a crushed vegetable material having a liquid and solid part [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.08.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  18.09.2020
FormerGrant of patent is intended
Status updated on  14.05.2020
FormerExamination is in progress
Status updated on  10.08.2018
FormerRequest for examination was made
Status updated on  03.08.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): GR
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Noform S.r.l.
Via delle Industrie II°, 43
30020 Meolo (VE) / IT
[2014/19]
Inventor(s)01 / Crosato, Remo
c/o NOFORM s.r.l.
Via delle Industrie II 43
30020 Meolo (VE) / IT
 [2014/19]
Representative(s)Citron, Massimiliano
Via Primo Maggio, 6
31020 San Fior (TV) / IT
[2014/19]
Application number, filing date13191000.231.10.2013
[2014/19]
Priority number, dateIT2012TV0020602.11.2012         Original published format: IT TV20120206
[2014/19]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2727476
Date:07.05.2014
Language:EN
[2014/19]
Type: B1 Patent specification 
No.:EP2727476
Date:21.10.2020
Language:EN
[2020/43]
Search report(s)(Supplementary) European search report - dispatched on:EP02.04.2014
ClassificationIPC:A23N1/02, C12G1/00, C12G1/02
[2014/19]
CPC:
C12G1/02 (EP,US); A23N1/02 (EP,US); B30B9/22 (EP);
C12G1/005 (EP,US); C12G1/0206 (EP,US); C12G1/06 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/43]
Former [2014/19]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Verarbeitung von zerkleinertem pflanzlichem Material mit flüssigen und festen Bestandteilen[2014/19]
English:Method of processing a crushed vegetable material having a liquid and solid part[2014/19]
French:Procédé pour le traitement des matériaux végétals broyés ayant des parties liquides et solides[2014/19]
Examination procedure07.11.2014Examination requested  [2014/51]
08.01.2015Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
18.03.2015Amendment by applicant (claims and/or description)
10.08.2018Despatch of a communication from the examining division (Time limit: M04)
20.12.2018Reply to a communication from the examining division
12.08.2019Despatch of a communication from the examining division (Time limit: M04)
20.12.2019Reply to a communication from the examining division
15.05.2020Communication of intention to grant the patent
28.08.2020Fee for grant paid
28.08.2020Fee for publishing/printing paid
11.09.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.08.2018
Opposition(s)22.07.2021No opposition filed within time limit [2021/39]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
19.03.2015Request for further processing filed
18.03.2015Full payment received (date of receipt of payment)
Request granted
31.03.2015Decision despatched
Fees paidRenewal fee
17.03.2016Renewal fee patent year 03
31.10.2016Renewal fee patent year 04
13.04.2018Renewal fee patent year 05
16.04.2019Renewal fee patent year 06
18.02.2020Renewal fee patent year 07
Penalty fee
Additional fee for renewal fee
31.10.201503   M06   Fee paid on   17.03.2016
31.10.201705   M06   Fee paid on   13.04.2018
31.10.201806   M06   Fee paid on   16.04.2019
31.10.201907   M06   Fee paid on   18.02.2020
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.10.2013
AL21.10.2020
AT21.10.2020
CY21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
GR21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
MK21.10.2020
MT21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
TR21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
[2022/33]
Former [2022/32]HU31.10.2013
AL21.10.2020
AT21.10.2020
CY21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
MK21.10.2020
MT21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
TR21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2022/27]HU31.10.2013
AL21.10.2020
AT21.10.2020
CY21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
MT21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
TR21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2022/26]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
TR21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2022/23]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2022/10]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
PT22.02.2021
DE01.05.2021
Former [2021/49]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SI21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
GB21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/46]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
IE31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/45]AL21.10.2020
AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/37]AT21.10.2020
CZ21.10.2020
DK21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/36]AT21.10.2020
CZ21.10.2020
EE21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
BE31.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/35]AT21.10.2020
CZ21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RO21.10.2020
RS21.10.2020
SE21.10.2020
SK21.10.2020
SM21.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
DE01.05.2021
Former [2021/34]AT21.10.2020
CZ21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
MC21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/33]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LT21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/32]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
SM21.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/31]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
LU31.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/28]AT21.10.2020
ES21.10.2020
FI21.10.2020
HR21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/25]AT21.10.2020
ES21.10.2020
FI21.10.2020
LV21.10.2020
NL21.10.2020
PL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
IS21.02.2021
PT22.02.2021
Former [2021/24]AT21.10.2020
FI21.10.2020
LV21.10.2020
NL21.10.2020
RS21.10.2020
SE21.10.2020
BG21.01.2021
NO21.01.2021
PT22.02.2021
Former [2021/23]FI21.10.2020
LV21.10.2020
NL21.10.2020
RS21.10.2020
SE21.10.2020
NO21.01.2021
PT22.02.2021
Former [2021/22]FI21.10.2020
NL21.10.2020
RS21.10.2020
NO21.01.2021
PT22.02.2021
Former [2021/21]FI21.10.2020
NL21.10.2020
PT22.02.2021
Former [2021/20]FI21.10.2020
Documents cited:Search[X]US3741770  (VAN OLPHEN G) [X] 1,6-8 * column 3, line 74 - column 4, line 37; figure 1 * * column 2, line 53 - line 68 *;
 [X]DE3021083  (GEFI GMBH [DE]) [X] 1,9 * figure 1; claims 1,6 *;
 [A]EP0438111  (OMC OFF MECC COLLAREDA SRL [IT], et al) [A] 1,10 * column 3, line 32 - line 57 *;
 [X]EP0530820  (RIEGER BEHAELTERBAU GMBH [DE]) [X] 1,8,9 * column 3, line 43 - column 4, line 2; figures 1,2; claims 1,2 *;
 [X]FR2826665  (BRUNET [FR]) [X] 1,5,8-10 * page 3, line 3 - line 20; figure 1; claims 1,8 * * page 4, line 3 - line 16 * * page 4, line 30 - page 6, line 23 *;
 [A]DE102005037005  (MOHR KURT [DE]) [A] 1,10 * paragraph [0012] - paragraph [0018] ** paragraph [0041] - paragraph [0043]; figure - *;
 [XA]EP1964914  (CMB DI CASSI ANGELO & C S N C [IT]) [X] 1,8,9 * paragraph [0034] - paragraph [0046]; figure - * [A] 10
by applicantEP2342071
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.