EP2733901 - COMMUNICATION METHOD AND RECEPTION APPARATUS [Right-click to bookmark this link] | |||
Former [2014/21] | Communication method and reception apparatus | ||
[2019/25] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 21.05.2019 | ||
Former | Examination is in progress Status updated on 21.12.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2019/19] |
Former [2014/21] | For all designated states Sony Mobile Communications, Inc. 1-8-15 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
Kusunoki, Shigeo c/o Sony Mobile Communications Inc 1-8-15 Konan Minato-ku Tokyo, 108-0075 / JP | [2014/21] | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2019/43] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | ||
Former [2014/21] | Jackson, Jonathan Andrew D Young & Co LLP 120 Holborn London EC1N 2DY / GB | Application number, filing date | 13192747.7 | 13.11.2013 | [2014/21] | Priority number, date | US201261727382P | 16.11.2012 Original published format: US 201261727382 P | [2014/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2733901 | Date: | 21.05.2014 | Language: | EN | [2014/21] | Type: | A3 Search report | No.: | EP2733901 | Date: | 17.01.2018 | Language: | EN | [2018/03] | Type: | B1 Patent specification | No.: | EP2733901 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.12.2017 | Classification | IPC: | H04L27/26 | [2014/21] | CPC: |
H04L27/2665 (EP,US);
H04L7/042 (US);
H04B1/7093 (US);
H04L27/2662 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/21] | Title | German: | KOMMUNIKATIONSVERFAHREN UND EMPFANGSVORRICHTUNG | [2019/25] | English: | COMMUNICATION METHOD AND RECEPTION APPARATUS | [2019/25] | French: | APPAREIL DE RÉCEPTION ET PROCÉDÉ DE COMMUNICATION | [2019/25] |
Former [2014/21] | Kommunikationsverfahren und Empfangsvorrichtung | ||
Former [2014/21] | Communication method and reception apparatus | ||
Former [2014/21] | Appareil de réception et procédé de communication | Examination procedure | 13.11.2013 | Examination requested [2014/21] | 12.07.2018 | Amendment by applicant (claims and/or description) | 19.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.03.2019 | Reply to a communication from the examining division | 22.05.2019 | Communication of intention to grant the patent | 12.09.2019 | Fee for grant paid | 12.09.2019 | Fee for publishing/printing paid | 12.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.12.2018 | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 24.11.2015 | Renewal fee patent year 03 | 23.11.2016 | Renewal fee patent year 04 | 13.11.2017 | Renewal fee patent year 05 | 14.11.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.11.2013 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | IT | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | RS | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | IE | 13.11.2019 | LU | 13.11.2019 | BE | 30.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | FR | 23.12.2019 | BG | 23.01.2020 | GB | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | [2022/31] |
Former [2022/26] | HU | 13.11.2013 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/34] | HU | 13.11.2013 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/32] | HU | 13.11.2013 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/26] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
BE | 30.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/48] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
FR | 23.12.2019 | ||
BG | 23.01.2020 | ||
GB | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/46] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
IE | 13.11.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/38] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
IT | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
LU | 13.11.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/34] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
CH | 30.11.2019 | ||
LI | 30.11.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
RS | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NO | 23.01.2020 | Documents cited: | Search | [A]EP2385733 (FUJITSU LTD [JP]) [A] 1-15 * paragraph [0011] * * paragraph [0019] - paragraph [0025] * * paragraph [0058] - paragraph [0061] * * paragraph [0072] - paragraph [0073] * * paragraph [0082] - paragraph [0084] * * paragraph [0099] - paragraph [0101] * * paragraph [0130] * * paragraph [0139] - paragraph [0140] * * figure 1 * * figure 4 ** figure 6 *; | [I] - Tzi Dar Chiuch; Pei Yun Tsai, OFDM Baseband Receiver Design for Wireless Communications, Singapore, Wiley, (20070101), pages 85 - 114, XP002776287 [I] 1-15 * page 5.3.1 * | [I] - SALT J E ET AL, "Performance analysis of a frame detection algorithm for burst mode communications", WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE, 2004. WCNC. 2004 IE EE ATLANTA, GA, USA 21-25 MARCH 2004, PISCATAWAY, NJ, USA,IEEE, (20040321), vol. 1, doi:10.1109/WCNC.2004.1311609, ISBN 978-0-7803-8344-9, pages 571 - 576, XP010708106 [I] 1-15 * page 571 * DOI: http://dx.doi.org/10.1109/WCNC.2004.1311609 | [I] - DONG KYU KIM ET AL, "A NEW JOINT ALGORITHM OF SYMBOL TIMING RECOVERY AND SAMPLING CLOCK ADJUSTMENT FOR OFDM SYSTEMS", 19980801, (19980801), vol. 44, no. 3, pages 1142 - 1149, XP011083726 [I] 1-15 * abstract * * paragraph [0III] * * page 1144, paragraph IV * * figure 5 * | by applicant | JP2006295629 | JP2012503429 |