EP2881644 - Device for mounting and fixing installations [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 31.05.2019 | ||
Former | Grant of patent is intended Status updated on 10.02.2019 | ||
Former | Examination is in progress Status updated on 13.04.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Kaimann GmbH Hansastraße 2-5 33161 Hövelhof / DE | [2018/33] |
Former [2015/24] | For all designated states Kaimann, Georg Josef Mergelweg 8 33161 Hövelhof / DE | Inventor(s) | 01 /
Kaimann, Georg Josef Hansastr. 2-5 33161 Hövelhof / DE | [2019/26] |
Former [2015/24] | 01 /
see applicant ... | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2015/24] | Application number, filing date | 13196211.0 | 09.12.2013 | [2015/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2881644 | Date: | 10.06.2015 | Language: | EN | [2015/24] | Type: | B1 Patent specification | No.: | EP2881644 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.03.2014 | Classification | IPC: | F16L59/135 | [2015/24] | CPC: |
F16L59/135 (EP);
F16L59/023 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/01] |
Former [2015/24] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung zur Montage und Befestigung von Installationen | [2015/24] | English: | Device for mounting and fixing installations | [2015/24] | French: | Dispositif de montage et de fixation d'installations | [2015/24] | Examination procedure | 01.12.2015 | Examination requested [2016/01] | 07.12.2015 | Amendment by applicant (claims and/or description) | 16.04.2018 | Despatch of a communication from the examining division (Time limit: M06) | 26.10.2018 | Reply to a communication from the examining division | 11.02.2019 | Communication of intention to grant the patent | 13.05.2019 | Fee for grant paid | 13.05.2019 | Fee for publishing/printing paid | 13.05.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.04.2018 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 21.12.2015 | Renewal fee patent year 03 | 20.12.2016 | Renewal fee patent year 04 | 14.12.2017 | Renewal fee patent year 05 | 13.12.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.12.2013 | AL | 03.07.2019 | CY | 03.07.2019 | EE | 03.07.2019 | FI | 03.07.2019 | HR | 03.07.2019 | LT | 03.07.2019 | LV | 03.07.2019 | MC | 03.07.2019 | MK | 03.07.2019 | MT | 03.07.2019 | RO | 03.07.2019 | RS | 03.07.2019 | SM | 03.07.2019 | BG | 03.10.2019 | GR | 04.10.2019 | IS | 03.11.2019 | [2022/31] |
Former [2021/34] | HU | 09.12.2013 | |
AL | 03.07.2019 | ||
CY | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
MT | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2021/33] | HU | 09.12.2013 | |
AL | 03.07.2019 | ||
CY | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2021/26] | AL | 03.07.2019 | |
CY | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/39] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/36] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/28] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SM | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/22] | AL | 03.07.2019 | |
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/15] | AL | 03.07.2019 | |
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/12] | FI | 03.07.2019 | |
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
Former [2020/11] | FI | 03.07.2019 | |
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
RS | 03.07.2019 | ||
BG | 03.10.2019 | ||
GR | 04.10.2019 | ||
Former [2020/10] | FI | 03.07.2019 | |
LT | 03.07.2019 | ||
BG | 03.10.2019 | ||
Former [2020/09] | FI | 03.07.2019 | |
LT | 03.07.2019 | ||
Former [2020/08] | LT | 03.07.2019 | Documents cited: | Search | [XYI]US2009095847 (LANGE HEINZ-WILHELM [DE], et al) [X] 1-4,7,8,13,15 * column 32 - column 37; figures 1,3,4 * * columns 12,13,19 * [Y] 5,9-11 [I] 6; | [X]DE9421307U (WALRAVEN HOLDING BV J VAN [NL]) [X] 1-3,7,8,12-15 * page 4, line 11 - line 33; figures 1-4,6 * * page 7, line 19 - line 24 *; | [Y]DE9318566U (KRATZER F MEFA DUEBEL GMBH [DE]) [Y] 5 * figure 1; claim 1 *; | [Y]FR2643119 (RENAULT [FR]) [Y] 9 * figure 3 *; | [Y]US4767087 (COMBU HUBERT [DE]) [Y] 10 * figure 1 *; | [Y]DE2852515 (PLOMBELEC) [Y] 11 * figure 1 * | Examination | WO2004070255 | by applicant | EP2476942 | DE20312763U | US3122346 | DE19746651 | DE9421308U | DE9421307U | US4852831 | US5078346 | US4323088 | US3000433 | GB2315107 | US6126119 | DE9102934U | CN2493809Y | CN2498440Y | EP0503566 | US4772507 |