blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2746599

EP2746599 - Locking connectors and related methods [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  18.11.2019
FormerExamination is in progress
Status updated on  30.10.2019
FormerGrant of patent is intended
Status updated on  11.07.2019
FormerExamination is in progress
Status updated on  24.08.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Bal Seal Engineering, LLC
19650 Pauling
Foothill Ranch, CA 92610-2610 / US
[2020/24]
Former [2020/18]For all designated states
Bal Seal Engineering, Inc.
19650 Pauling
Foothill Ranch, CA 92610-2610 / US
Former [2014/26]For all designated states
Bal Seal Engineering, Inc.
19650 Pauling
Foothill Ranch CA 92610-2610 / US
Inventor(s)01 / Huang, Michelle
19650 Pauling
Foothill Ranch, CA 92610-2610 / US
 [2020/18]
Former [2014/26]01 / Huang, Michelle
19650 Pauling
Foothill Ranch, CA California 92610-2610 / US
Representative(s)Kinkeldey, Daniela
Bird & Bird LLP
Maximiliansplatz 22
80333 München / DE
[2014/26]
Application number, filing date13198442.919.12.2013
[2014/26]
Priority number, dateUS201261740647P21.12.2012         Original published format: US 201261740647 P
US20131410973017.12.2013         Original published format: US201314109730
[2014/26]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2746599
Date:25.06.2014
Language:EN
[2014/26]
Type: A3 Search report 
No.:EP2746599
Date:25.11.2015
Language:EN
[2015/48]
Type: B1 Patent specification 
No.:EP2746599
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)(Supplementary) European search report - dispatched on:EP22.10.2015
ClassificationIPC:F16B21/18, // F16B21/06
[2019/27]
CPC:
F16B21/186 (EP,US); H01R13/62 (US); F16B21/065 (EP,US);
H01R13/187 (EP)
Former IPC [2014/26]F16B21/06, F16B21/07, F16B21/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/27]
Former [2014/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verriegelungsverbinder und zugehörige Verfahren[2014/26]
English:Locking connectors and related methods[2014/26]
French:Connecteurs de verrouillage et procédés associés[2014/26]
Examination procedure25.05.2016Amendment by applicant (claims and/or description)
25.05.2016Examination requested  [2016/27]
23.08.2018Despatch of a communication from the examining division (Time limit: M06)
30.01.2019Reply to a communication from the examining division
11.07.2019Communication of intention to grant the patent
25.10.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
19.11.2019Communication of intention to grant the patent
17.03.2020Fee for grant paid
17.03.2020Fee for publishing/printing paid
17.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.08.2018
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
10.12.2015Renewal fee patent year 03
13.12.2016Renewal fee patent year 04
12.12.2017Renewal fee patent year 05
12.12.2018Renewal fee patent year 06
13.12.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.12.2013
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU19.12.2013
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU19.12.2013
AL29.04.2020
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/26]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/49]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
GB19.12.2020
IE19.12.2020
LU19.12.2020
Former [2021/47]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
IE19.12.2020
LU19.12.2020
Former [2021/46]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
IE19.12.2020
Former [2021/40]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AL29.04.2020
AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]AL29.04.2020
DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
RS29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]AL29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/51]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
RS29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Documents cited:Search[Y]US2005212218  (BALSELLS PETER J [US]) [Y] 5 * figures 11-11D * * paragraphs [0067] - [0068] *;
 [XAI]WO2009126968  (NUVASIVE INC [US], et al) [X] 8,11-14 * figures 24-30 * * paragraphs [0059] - [0061] - [0064] - [0067] * [A] 9,10[I] 15,16;
 [Y]EP2259383  (BAL SEAL ENG [US]) [Y] 6 * figures 1-4 * * paragraph [0021] *;
 [XY]EP2458231  (BAL SEAL ENGINEERING CO [US]) [X] 1-4,7 * figures 7-8 * * paragraphs [0063] - [0068] * [Y] 5,6
by applicantUS4655462
 US4826144
 US4876781
 US4964204
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.