Extract from the Register of European Patents

EP About this file: EP2752657

EP2752657 - System and methods for stand-off inspection of aircraft structures [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 21.03.2026
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  07.01.2020
FormerRequest for examination was made
Status updated on  10.12.2019
FormerGrant of patent is intended
Status updated on  08.09.2019
FormerRequest for examination was made
Status updated on  06.07.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-1596 / US
[2020/25]
Former [2014/28]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / Georgeson, Gary E.
P.O. Box 3707
Seattle, WA 98124 / US
02 / Troy, James J.
P.O. Box 3707
MC: 7L-43
Seattle, WA 98124 / US
03 / Lea, Scott W.
9725 East Marginal Way
MC: 4E-96
Tukwila, WA 98108 / US
 [2014/28]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2020/25]
Former [2014/28]Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
Application number, filing date13199830.430.12.2013
[2014/28]
Priority number, dateUS20131373278902.01.2013         Original published format: US201313732789
[2014/28]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2752657
Date:09.07.2014
Language:EN
[2014/28]
Type: A3 Search report 
No.:EP2752657
Date:03.01.2018
Language:EN
[2018/01]
Type: B1 Patent specification 
No.:EP2752657
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)(Supplementary) European search report - dispatched on:EP05.12.2017
ClassificationIPC:G01N21/88, G01N21/84
[2018/01]
CPC:
G01N21/8851 (EP,US); G01M99/00 (US); G01N21/8422 (EP,US);
G01N2021/8867 (EP,US)
Former IPC [2014/28]G01N21/88
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/32]
Former [2014/28]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:System und Verfahren zur Stillstandsprüfung von Flugzeugstrukturen[2014/28]
English:System and methods for stand-off inspection of aircraft structures[2014/28]
French:Système et procédés pour inspection à distance de structures d'avion[2014/28]
Examination procedure27.06.2018Amendment by applicant (claims and/or description)
27.06.2018Examination requested  [2018/32]
09.09.2019Communication of intention to grant the patent
06.12.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
08.01.2020Communication of intention to grant the patent
06.05.2020Fee for grant paid
06.05.2020Fee for publishing/printing paid
06.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.09.2019
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
28.12.2015Renewal fee patent year 03
27.12.2016Renewal fee patent year 04
27.12.2017Renewal fee patent year 05
31.12.2018Renewal fee patent year 06
27.12.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.12.2013
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU30.12.2013
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU30.12.2013
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/26]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/47]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
LU30.12.2020
Former [2021/46]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE30.12.2020
Former [2021/40]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[X] US2009086014  (LEA SCOTT et al.) [X] 1-15 * abstract * * paragraphs [0001] , [0 22] - [0033] *
 [X] US2003048459  (GOOCH RICHARD MICHAEL et al.) [X] 1-15 * abstract * * paragraphs [0008] , [0 29] - [0035] *
 [A] US2011137615  (MOTZER WILLIAM P et al.) [A] 1-15 * abstract * * page 2 - page 3 *
 [A] US2012327187  (TROY JAMES J et al.) [A] 1-15 * abstract * * page 2 - page 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.