EP2804995 - WASTE PUMP AND METHOD FOR PUMPING WASTE [Right-click to bookmark this link] | |||
Former [2014/48] | WASTE PUMP | ||
[2021/46] | Status | No opposition filed within time limit Status updated on 14.07.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 05.08.2022 | ||
Former | Grant of patent is intended Status updated on 08.11.2021 | ||
Former | Examination is in progress Status updated on 09.06.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Abu Al-Rubb, Khalil Salwa Road P. O. Box 22599 Doha / QA | [2022/36] |
Former [2014/48] | For all designated states Abu Al-Rubb, Khalil Salwa Road P. O. Box 22599 Doha / QA | Inventor(s) | 01 /
see applicant ... | [2014/48] | Representative(s) | Halliwell, Bethan Frances, et al Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [2022/36] |
Former [2014/48] | Wallin, Nicholas James, et al Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | Application number, filing date | 13702257.0 | 17.01.2013 | [2022/36] | WO2013GB50097 | Priority number, date | GB20120000970 | 19.01.2012 Original published format: GB 201200970 | [2014/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013108028 | Date: | 25.07.2013 | Language: | EN | [2013/30] | Type: | A1 Application with search report | No.: | EP2804995 | Date: | 26.11.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.07.2013 takes the place of the publication of the European patent application. | [2014/48] | Type: | B1 Patent specification | No.: | EP2804995 | Date: | 07.09.2022 | Language: | EN | [2022/36] | Search report(s) | International search report - published on: | EP | 25.07.2013 | Classification | IPC: | E03F5/22, E03C1/122 | [2014/48] | CPC: |
E03F5/22 (EP,US);
E03C1/12 (GB);
F04D7/045 (US);
E03C1/122 (GB);
E03C1/1227 (EP,US);
E03C1/266 (GB);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ABFALLPUMPE UND VERFAHREN ZUR BEFÖRDERUNG VON ABFALL | [2021/46] | English: | WASTE PUMP AND METHOD FOR PUMPING WASTE | [2021/46] | French: | POMPE À DÉCHETS ET PROCÉDÉ DE POMPAGE DES DÉCHETS | [2021/46] |
Former [2014/48] | ABFALLPUMPE | ||
Former [2014/48] | WASTE PUMP | ||
Former [2014/48] | POMPE À DÉCHETS | Entry into regional phase | 13.08.2014 | National basic fee paid | 13.08.2014 | Designation fee(s) paid | 13.08.2014 | Examination fee paid | Examination procedure | 13.08.2014 | Examination requested [2014/48] | 10.04.2015 | Amendment by applicant (claims and/or description) | 13.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 12.09.2017 | Reply to a communication from the examining division | 01.06.2018 | Invitation to indicate the basis for amendments (Time limit: M01) | 25.06.2018 | Reply to an invitation to indicate the basis for amendments | 27.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 22.03.2019 | Reply to a communication from the examining division | 09.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 05.02.2020 | Reply to a communication from the examining division | 17.11.2020 | Despatch of a communication from the examining division (Time limit: M02) | 13.01.2021 | Reply to a communication from the examining division | 09.11.2021 | Communication of intention to grant the patent | 11.03.2022 | Fee for grant paid | 11.03.2022 | Fee for publishing/printing paid | 11.03.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.06.2017 | Opposition(s) | 08.06.2023 | No opposition filed within time limit [2023/33] | Fees paid | Renewal fee | 09.01.2015 | Renewal fee patent year 03 | 14.01.2016 | Renewal fee patent year 04 | 09.01.2017 | Renewal fee patent year 05 | 28.03.2018 | Renewal fee patent year 06 | 22.01.2019 | Renewal fee patent year 07 | 23.01.2020 | Renewal fee patent year 08 | 25.01.2021 | Renewal fee patent year 09 | 29.07.2022 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 31.01.2018 | 06   M06   Fee paid on   28.03.2018 | 31.01.2022 | 10   M06   Fee paid on   29.07.2022 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.09.2022 | AT | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | IT | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | RS | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | GB | 17.01.2023 | IE | 17.01.2023 | LU | 17.01.2023 | BE | 31.01.2023 | CH | 31.01.2023 | FR | 31.01.2023 | LI | 31.01.2023 | [2024/29] |
Former [2024/26] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
IT | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 17.01.2023 | ||
IE | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2024/08] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 17.01.2023 | ||
IE | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/52] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
FR | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/49] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 17.01.2023 | ||
LU | 17.01.2023 | ||
BE | 31.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/47] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
GB | 17.01.2023 | ||
LU | 17.01.2023 | ||
CH | 31.01.2023 | ||
LI | 31.01.2023 | ||
Former [2023/43] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
LU | 17.01.2023 | ||
Former [2023/37] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SI | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/34] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
DK | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/30] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
NL | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/29] | AL | 07.09.2022 | |
AT | 07.09.2022 | ||
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/26] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
PL | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
IS | 07.01.2023 | ||
PT | 09.01.2023 | ||
Former [2023/23] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
EE | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SK | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/22] | AT | 07.09.2022 | |
CZ | 07.09.2022 | ||
ES | 07.09.2022 | ||
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RO | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
PT | 09.01.2023 | ||
Former [2023/20] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
SM | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/10] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
HR | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
GR | 08.12.2022 | ||
Former [2023/09] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
LT | 07.09.2022 | ||
LV | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | ||
Former [2023/08] | ES | 07.09.2022 | |
FI | 07.09.2022 | ||
LT | 07.09.2022 | ||
RS | 07.09.2022 | ||
SE | 07.09.2022 | ||
NO | 07.12.2022 | Cited in | International search | [X]DE9013250U ; | [A]DE4211806 (ABS PUMPEN AG [DE]); | [XA]WO0220909 (INTELLIGENT ENVIRONMENTAL SYST [NL], et al) | Examination | DE3719068 |