EP2811874 - BEVERAGE FORMING DEVICE AND METHOD WITH CARTRIDGE RETAINER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.02.2019 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 09.03.2018 | ||
Former | Grant of patent is intended Status updated on 25.09.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Keurig Green Mountain, Inc. 33 Coffee Lane Waterbury, VT 05676-8900 / US | [2018/15] |
Former [2014/51] | For all designated states Keurig Green Mountain, Inc. 33 Coffee Lane Waterbury, VT 05676-8900 / US | Inventor(s) | 01 /
SMITH, Geoffrey, Y. 176 Ashland Street Melrose, MA 02176 / US | 02 /
CHAN, Thomas Simatelex Manufactory Co. Ltd. 9/F Chan Wai Industrial Centre 20 Lee Chung Street Chai Wan Hong Kong / CN | 03 /
CHOI, Keith Simatelex Manufactory Co. Ltd. 9/F Chan Wai Industrial Centre 20 Lee Chung Street Chai Wan Hong Kong / CN | 04 /
LI, Benjamin Simatelex Manufactory Co. Ltd. 9/F Chan Wai Industrial Centre 20 Lee Chung Street Chai Wan Hong Kong / CN | [2014/51] | Representative(s) | HGF 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2018/15] | HGF Limited 1 City Walk Leeds LS11 9DX / GB | ||
Former [2014/51] | Barker, Rosemary Anne HGF Limited 4th Floor, Merchant Exchange 17-19 Whitworth Street West Manchester M1 5WG / GB | Application number, filing date | 13705066.2 | 05.02.2013 | [2018/15] | WO2013US24718 | Priority number, date | US201261597006P | 09.02.2012 Original published format: US 201261597006 P | [2014/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013119534 | Date: | 15.08.2013 | Language: | EN | [2013/33] | Type: | A1 Application with search report | No.: | EP2811874 | Date: | 17.12.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.08.2013 takes the place of the publication of the European patent application. | [2014/51] | Type: | B1 Patent specification | No.: | EP2811874 | Date: | 11.04.2018 | Language: | EN | [2018/15] | Search report(s) | International search report - published on: | EP | 15.08.2013 | Classification | IPC: | A47J31/40, A47J31/36 | [2017/36] | CPC: |
A47J31/3633 (EP,US);
A47J31/407 (US)
|
Former IPC [2014/51] | A47J31/36 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | GETRÄNKEHERSTELLUNGSVORRICHTUNG UND VERFAHREN MIT PATRONENHALTERUNG | [2014/51] | English: | BEVERAGE FORMING DEVICE AND METHOD WITH CARTRIDGE RETAINER | [2014/51] | French: | PROCÉDÉ ET DISPOSITIF DE PRÉPARATION DE BOISSON AYANT UN DISPOSITIF DE RETENUE DE CARTOUCHE | [2014/51] | Entry into regional phase | 29.07.2014 | National basic fee paid | 29.07.2014 | Designation fee(s) paid | 29.07.2014 | Examination fee paid | Examination procedure | 29.07.2014 | Examination requested [2014/51] | 30.12.2014 | Amendment by applicant (claims and/or description) | 12.11.2015 | Despatch of a communication from the examining division (Time limit: M04) | 16.12.2015 | Reply to a communication from the examining division | 26.09.2017 | Communication of intention to grant the patent | 16.01.2018 | Fee for grant paid | 16.01.2018 | Fee for publishing/printing paid | 16.01.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.11.2015 | Opposition(s) | 14.01.2019 | No opposition filed within time limit [2019/12] | Fees paid | Renewal fee | 26.02.2015 | Renewal fee patent year 03 | 26.02.2016 | Renewal fee patent year 04 | 27.02.2017 | Renewal fee patent year 05 | 27.02.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.02.2013 | AL | 11.04.2018 | AT | 11.04.2018 | CY | 11.04.2018 | CZ | 11.04.2018 | DK | 11.04.2018 | EE | 11.04.2018 | ES | 11.04.2018 | FI | 11.04.2018 | HR | 11.04.2018 | LT | 11.04.2018 | LV | 11.04.2018 | MC | 11.04.2018 | MK | 11.04.2018 | NL | 11.04.2018 | PL | 11.04.2018 | RO | 11.04.2018 | RS | 11.04.2018 | SE | 11.04.2018 | SI | 11.04.2018 | SK | 11.04.2018 | SM | 11.04.2018 | TR | 11.04.2018 | BG | 11.07.2018 | NO | 11.07.2018 | GR | 12.07.2018 | IS | 11.08.2018 | PT | 13.08.2018 | [2022/31] |
Former [2021/32] | HU | 05.02.2013 | |
AL | 11.04.2018 | ||
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
IS | 11.08.2018 | ||
PT | 13.08.2018 | ||
Former [2021/31] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
IS | 11.08.2018 | ||
PT | 13.08.2018 | ||
Former [2021/26] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2020/16] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/45] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/26] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/11] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/10] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/09] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/08] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/03] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/52] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
Former [2018/51] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/50] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/49] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/47] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/46] | AL | 11.04.2018 | |
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/43] | NL | 11.04.2018 | Cited in | International search | [XAYI]US2005126399 (BRAGG TIM A [US], et al) [X] 1-16,20,21,24-27,29-32,34,35 * paragraph [0024]; figures 1-7 * [A] 39-52 [Y] 17-19,22,23,33,36-38 [I] 28; | [Y]WO2005115206 (SGL ITALIA SRL [IT], et al) [Y] 22,23* page 11, line 18 - line 23; figure 8 *; | [XAI]EP2250950 (EMMEBIELLE S R L [IT]) [X] 39-43,47-49 * paragraph [0012] - paragraph [0045]; figures 1-8 * [A] 1-38,45,50-52 [I] 44,46; | [Y]DE102009049945 (KRUEGER GMBH & CO KG [DE]) [Y] 17-19,33,36-38 * paragraph [0031] - paragraph [0035]; figures 1-5c * | Examination | US5776527 | by applicant | US7165488 |