| EP2815525 - METHOD AND APPARATUS FOR INTERFERENCE CANCELLATION IN HYBRID SATELLITE-TERRESTRIAL NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.04.2018 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 28.04.2017 | ||
| Former | Grant of patent is intended Status updated on 22.12.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2018/16] |
| Former [2014/52] | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | Inventor(s) | 01 /
JIANG, Hong 600-700 Mountain Avenue Murray Hill, NJ 07974 / US | 02 /
YU, Liangkai 600-700 Mountain Avenue Murray Hill, NJ 07974 / US | [2014/52] | Representative(s) | Wetzel, Emmanuelle Alcatel-Lucent Intellectual Property Business Group 70430 Stuttgart / DE | [2017/22] |
| Former [2014/52] | 2SPL Patentanwälte PartG mbB Postfach 15 17 23 80050 München / DE | Application number, filing date | 13705877.2 | 07.02.2013 | [2017/22] | WO2013US25014 | Priority number, date | US201261597993P | 13.02.2012 Original published format: US 201261597993 P | US201213564840 | 02.08.2012 Original published format: US201213564840 | [2014/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013122802 | Date: | 22.08.2013 | Language: | EN | [2013/34] | Type: | A1 Application with search report | No.: | EP2815525 | Date: | 24.12.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.08.2013 takes the place of the publication of the European patent application. | [2014/52] | Type: | B1 Patent specification | No.: | EP2815525 | Date: | 31.05.2017 | Language: | EN | [2017/22] | Search report(s) | International search report - published on: | EP | 22.08.2013 | Classification | IPC: | H04H20/06, H04H20/22, H04H20/72, H04H20/74, H04H40/90, H04H20/67 | [2016/32] | CPC: |
H04H20/67 (EP,KR,US);
H04H20/06 (EP,US);
H04H20/72 (EP,US);
H04H20/74 (EP,KR,US);
H04H20/22 (EP,US);
H04H40/90 (EP,US)
|
| Former IPC [2014/52] | H04H20/67 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR INTERFERENZUNTERDRÜCKUNG IN EINEM HYBRIDEN SATELLITEN-/TERRESTRISCHEN NETZWERK | [2014/52] | English: | METHOD AND APPARATUS FOR INTERFERENCE CANCELLATION IN HYBRID SATELLITE-TERRESTRIAL NETWORK | [2014/52] | French: | PROCÉDÉ ET APPAREIL POUR SUPPRIMER LE BROUILLAGE DANS UN RÉSEAU HYBRIDE À SATELLITE-TERRESTRE | [2014/52] | Entry into regional phase | 15.09.2014 | National basic fee paid | 15.09.2014 | Designation fee(s) paid | 15.09.2014 | Examination fee paid | Examination procedure | 15.09.2014 | Examination requested [2014/52] | 17.02.2015 | Amendment by applicant (claims and/or description) | 23.12.2016 | Communication of intention to grant the patent | 20.04.2017 | Fee for grant paid | 20.04.2017 | Fee for publishing/printing paid | 20.04.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.12.2016 | Opposition(s) | 01.03.2018 | No opposition filed within time limit [2018/19] | Fees paid | Renewal fee | 23.02.2015 | Renewal fee patent year 03 | 22.02.2016 | Renewal fee patent year 04 | 17.02.2017 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.02.2013 | AL | 31.05.2017 | AT | 31.05.2017 | CY | 31.05.2017 | CZ | 31.05.2017 | DK | 31.05.2017 | EE | 31.05.2017 | ES | 31.05.2017 | FI | 31.05.2017 | HR | 31.05.2017 | IT | 31.05.2017 | LT | 31.05.2017 | LV | 31.05.2017 | MC | 31.05.2017 | MK | 31.05.2017 | NL | 31.05.2017 | PL | 31.05.2017 | PT | 31.05.2017 | RO | 31.05.2017 | RS | 31.05.2017 | SE | 31.05.2017 | SI | 31.05.2017 | SK | 31.05.2017 | SM | 31.05.2017 | TR | 31.05.2017 | BG | 31.08.2017 | NO | 31.08.2017 | GR | 01.09.2017 | IS | 30.09.2017 | IE | 07.02.2018 | LU | 07.02.2018 | MT | 07.02.2018 | BE | 28.02.2018 | CH | 28.02.2018 | FR | 28.02.2018 | LI | 28.02.2018 | [2020/34] |
| Former [2020/31] | HU | 07.02.2013 | |
| AT | 31.05.2017 | ||
| CY | 31.05.2017 | ||
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| MK | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| PT | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| MT | 07.02.2018 | ||
| BE | 28.02.2018 | ||
| CH | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2020/28] | HU | 07.02.2013 | |
| AT | 31.05.2017 | ||
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| PT | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| MT | 07.02.2018 | ||
| BE | 28.02.2018 | ||
| CH | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2020/15] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| TR | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| MT | 07.02.2018 | ||
| BE | 28.02.2018 | ||
| CH | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2020/08] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| MT | 07.02.2018 | ||
| BE | 28.02.2018 | ||
| CH | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2019/12] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| BE | 28.02.2018 | ||
| CH | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2019/09] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| IE | 07.02.2018 | ||
| LU | 07.02.2018 | ||
| CH | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2018/52] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| LU | 07.02.2018 | ||
| CH | 28.02.2018 | ||
| LI | 28.02.2018 | ||
| Former [2018/44] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| MC | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/25] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SI | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/11] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| IT | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| PL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| SM | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/10] | AT | 31.05.2017 | |
| CZ | 31.05.2017 | ||
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RO | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| SK | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2018/09] | AT | 31.05.2017 | |
| DK | 31.05.2017 | ||
| EE | 31.05.2017 | ||
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/52] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| NL | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/50] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| LV | 31.05.2017 | ||
| RS | 31.05.2017 | ||
| SE | 31.05.2017 | ||
| BG | 31.08.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | ||
| Former [2017/49] | AT | 31.05.2017 | |
| ES | 31.05.2017 | ||
| FI | 31.05.2017 | ||
| HR | 31.05.2017 | ||
| LT | 31.05.2017 | ||
| NO | 31.08.2017 | ||
| GR | 01.09.2017 | ||
| IS | 30.09.2017 | Cited in | International search | [A] SAUVET-GOICHON D: "PLANNING ASPECTS OF SATELLITE AND TERRESTRIAL DIGITAL SOUND BROADCASTING", INTERNATIONAL JOURNAL OF SATELLITE COMMUNICATIONS, JOHN WILEY AND SONS, US, vol. 13, no. 4, 1 January 1995 (1995-01-01), pages 215 - 221, XP000973945, ISSN: 0737-2884 [A] 1-10 * the whole document * | by applicant | "Framing Structure, channel coding and modulation for Satellite Services to Handheld devices (SH) below 3 GHz", ETSI EN 302 583 V 1.1.2, February 2010 (2010-02-01) |