EP2820667 - METHOD FOR DETERMINING THE MAXIMUM MASS PEAK IN MASS SPECTROMETRY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.02.2021 Database last updated on 14.11.2024 | |
Former | The patent has been granted Status updated on 20.03.2020 | ||
Former | Grant of patent is intended Status updated on 02.01.2020 | ||
Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Inficon GmbH Bonner Straße 498 50968 Köln / DE | [2015/02] | Inventor(s) | 01 /
ROLFF, Norbert Hauptstraße 101 50169 Horrem / DE | [2015/02] | Representative(s) | dompatent von Kreisler Selting Werner - Partnerschaft von Patent- und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | [2020/17] |
Former [2015/02] | Von Kreisler Selting Werner - Partnerschaft von Patentanwälten und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | Application number, filing date | 13708748.2 | 28.02.2013 | [2020/17] | WO2013EP54055 | Priority number, date | DE201210203137 | 29.02.2012 Original published format: DE102012203137 | [2015/02] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2013127933 | Date: | 06.09.2013 | Language: | DE | [2013/36] | Type: | A2 Application without search report | No.: | EP2820667 | Date: | 07.01.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 06.09.2013 takes the place of the publication of the European patent application. | [2015/02] | Type: | B1 Patent specification | No.: | EP2820667 | Date: | 22.04.2020 | Language: | DE | [2020/17] | Search report(s) | International search report - published on: | EP | 19.12.2013 | Classification | IPC: | H01J49/00, H01J49/28 | [2015/02] | CPC: |
H01J49/0036 (EP,US);
H01J49/0009 (EP,US);
H01J49/0031 (EP,US);
H01J49/26 (US);
H01J49/28 (EP,US);
H01J49/04 (RU)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR BESTIMMUNG DES MAXIMUMS DES MASSENPEAKS IN DER MASSENSPEKTROMETRIE | [2015/02] | English: | METHOD FOR DETERMINING THE MAXIMUM MASS PEAK IN MASS SPECTROMETRY | [2015/02] | French: | PROCÉDÉ DE DÉTERMINATION DU MAXIMUM DU PIC DE MASSE DANS LA SPECTROMÉTRIE DE MASSE | [2015/02] | Entry into regional phase | 25.08.2014 | National basic fee paid | 25.08.2014 | Designation fee(s) paid | 25.08.2014 | Examination fee paid | Examination procedure | 25.08.2014 | Examination requested [2015/02] | 08.04.2015 | Amendment by applicant (claims and/or description) | 11.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.11.2017 | Reply to a communication from the examining division | 03.01.2020 | Communication of intention to grant the patent | 17.03.2020 | Fee for grant paid | 17.03.2020 | Fee for publishing/printing paid | 17.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.07.2017 | Opposition(s) | 25.01.2021 | No opposition filed within time limit [2021/13] | Fees paid | Renewal fee | 23.02.2015 | Renewal fee patent year 03 | 24.02.2016 | Renewal fee patent year 04 | 24.02.2017 | Renewal fee patent year 05 | 27.02.2018 | Renewal fee patent year 06 | 25.02.2019 | Renewal fee patent year 07 | 21.02.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2013 | AL | 22.04.2020 | CY | 22.04.2020 | CZ | 22.04.2020 | DK | 22.04.2020 | EE | 22.04.2020 | ES | 22.04.2020 | FI | 22.04.2020 | HR | 22.04.2020 | IT | 22.04.2020 | LT | 22.04.2020 | LV | 22.04.2020 | MC | 22.04.2020 | MK | 22.04.2020 | MT | 22.04.2020 | NL | 22.04.2020 | PL | 22.04.2020 | RO | 22.04.2020 | RS | 22.04.2020 | SE | 22.04.2020 | SI | 22.04.2020 | SK | 22.04.2020 | SM | 22.04.2020 | TR | 22.04.2020 | BG | 22.07.2020 | NO | 22.07.2020 | GR | 23.07.2020 | IS | 22.08.2020 | PT | 24.08.2020 | [2024/41] |
Former [2024/29] | HU | 28.02.2013 | |
AL | 22.04.2020 | ||
CY | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
MK | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
TR | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2024/22] | HU | 28.02.2013 | |
AL | 22.04.2020 | ||
CY | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
MK | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2023/30] | HU | 28.02.2013 | |
AL | 22.04.2020 | ||
CY | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2023/27] | HU | 28.02.2013 | |
AL | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/41] | AL | 22.04.2020 | |
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/24] | AL | 22.04.2020 | |
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/10] | AL | 22.04.2020 | |
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/09] | AL | 22.04.2020 | |
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/08] | AL | 22.04.2020 | |
DK | 22.04.2020 | ||
ES | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/04] | AL | 22.04.2020 | |
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/01] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/51] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/50] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
NL | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/48] | FI | 22.04.2020 | |
LT | 22.04.2020 | ||
NL | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/47] | LT | 22.04.2020 | |
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
Former [2020/46] | IS | 22.08.2020 | Cited in | International search | [I]WO2004106881 (INFICON GMBH [DE], et al) [I] 1-8 * abstract *; | [A]US2005151073 (KATO YOSHIAKI [JP]) [A] 1-8* paragraph [0007] - paragraph [0009] *; | [I]DE102005028557 (INFICON GMBH [DE]) [I] 1-8 * abstract * | Examination | - Dominic M. Desiderio ET AL, "High resolution mass spectral photoplate data acquired and reduced with a real time remote time-shared digital computer", Analytical Chemistry, US, (19681201), vol. 40, no. 14, doi:10.1021/ac50158a027, ISSN 0003-2700, pages 2090 - 2096, XP055388103 DOI: http://dx.doi.org/10.1021/ac50158a027 |