EP2828530 - A DETERMINATION METHOD AND A CONTROL METHOD FOR A FLUID DISPLACEMENT DEVICE, CONTROLLER AND SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 31.03.2021 | ||
Former | Examination is in progress Status updated on 06.12.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Contronics Engineering B.V. Ambachtsweg 8 5492 NJ Sint-Oedenrode / NL | [2021/46] |
Former [2015/25] | For all designated states Comoco B.V. Ambachtsweg 8 5492 NJ Sint-Oedenrode / NL | ||
Former [2015/05] | For all designated states Comoco B.V. Ambachtsweg 8 5492 NJ Sint-Oedenrode / NL | ||
For all designated states Piak Electronic Design BV Markt 49 4101 BW Culemborg / NL | Inventor(s) | 01 /
VELTMAN, André Markt 49 4101 BW Culemborg / NL | 02 /
BEEKMANS, Robert Ambachtsweg 8 5492 NJ Sint-Oedenrode / NL | [2015/05] | Representative(s) | Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2021/35] |
Former [2015/05] | Nollen, Maarten Dirk-Johan Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | Application number, filing date | 13713567.9 | 15.03.2013 | [2021/35] | WO2013NL50193 | Priority number, date | NL20122008504 | 19.03.2012 Original published format: NL 2008504 | NL20122008774 | 08.05.2012 Original published format: NL 2008774 | US201261653380P | 30.05.2012 Original published format: US 201261653380 P | [2015/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013141698 | Date: | 26.09.2013 | Language: | EN | [2013/39] | Type: | A1 Application with search report | No.: | EP2828530 | Date: | 28.01.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.09.2013 takes the place of the publication of the European patent application. | [2015/05] | Type: | B1 Patent specification | No.: | EP2828530 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | International search report - published on: | EP | 26.09.2013 | Classification | IPC: | F04D15/00 | [2015/05] | CPC: |
F04D15/0088 (EP,US);
F04D13/06 (US);
F04D15/0066 (US);
F04D27/001 (EP,US);
H02P6/14 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BESTIMMUNGSVERFAHREN UND STEUERVERFAHREN FÜR EINE FLÜSSIGKEITSVERDRÄNGUNGSVORRICHTUNG, STEUERUNG UND SYSTEM | [2015/05] | English: | A DETERMINATION METHOD AND A CONTROL METHOD FOR A FLUID DISPLACEMENT DEVICE, CONTROLLER AND SYSTEM | [2015/05] | French: | PROCÉDÉ DE DÉTERMINATION ET PROCÉDÉ DE COMMANDE POUR UN DISPOSITIF DE DÉPLACEMENT DE FLUIDE, UNITÉ DE COMMANDE ET SYSTÈME | [2015/05] | Entry into regional phase | 02.09.2014 | National basic fee paid | 02.09.2014 | Designation fee(s) paid | 02.09.2014 | Examination fee paid | Examination procedure | 02.09.2014 | Amendment by applicant (claims and/or description) | 02.09.2014 | Examination requested [2015/05] | 10.12.2019 | Despatch of a communication from the examining division (Time limit: M06) | 22.06.2020 | Reply to a communication from the examining division | 01.04.2021 | Communication of intention to grant the patent | 27.07.2021 | Fee for grant paid | 27.07.2021 | Fee for publishing/printing paid | 27.07.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.12.2019 | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 25.08.2015 | Renewal fee patent year 03 | 23.03.2016 | Renewal fee patent year 04 | 27.03.2017 | Renewal fee patent year 05 | 27.04.2018 | Renewal fee patent year 06 | 27.03.2019 | Renewal fee patent year 07 | 27.03.2020 | Renewal fee patent year 08 | 29.03.2021 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 31.03.2015 | 03   M06   Fee paid on   25.08.2015 | 31.03.2018 | 06   M06   Fee paid on   27.04.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.03.2013 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | MT | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | TR | 01.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | GB | 15.03.2022 | IE | 15.03.2022 | LU | 15.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | FR | 31.03.2022 | LI | 31.03.2022 | [2024/41] |
Former [2024/29] | HU | 15.03.2013 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
TR | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/22] | HU | 15.03.2013 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 15.03.2013 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 15.03.2013 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 15.03.2022 | ||
IE | 15.03.2022 | ||
LU | 15.03.2022 | ||
FR | 31.03.2022 | ||
Former [2023/06] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
FR | 31.03.2022 | ||
Former [2022/47] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Cited in | International search | [X]US2005031443 (OHLSSON BERTIL [SE], et al) [X] 1-37 * the whole document * * claim 1 * * figure 7 *; | [X]US2010143157 (AHONEN TERO [FI], et al) [X] 1-37 * the whole document ** figure 2 * | by applicant | US5231339 | US6504338 | US2008124226 |