EP2837242 - WIRELESS COMMUNICATION DEVICE, COMMUNICATION SYSTEM AND METHOD FOR ESTABLISHING DATA CONNECTIVITY BETWEEN A WIRELESS COMMUNICATION DEVICE AND A FIRST ACCESS NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.07.2018 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 28.07.2017 | ||
Former | Grant of patent is intended Status updated on 15.05.2017 | ||
Former | Examination is in progress Status updated on 18.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Google Technology Holdings LLC 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | [2016/13] |
Former [2015/08] | For all designated states Motorola Mobility LLC 600 North US Highway 45 Libertyville, IL 60048 / US | Inventor(s) | 01 /
SALKINTZIS, Apostolis K. 3 Rethimnou Street GR-15354 Athens / GR | [2015/08] | Representative(s) | Chettle, John Edward, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2017/35] |
Former [2015/08] | Chettle, John Edward, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | Application number, filing date | 13718248.1 | 04.04.2013 | [2017/35] | WO2013US35201 | Priority number, date | US201213443219 | 10.04.2012 Original published format: US201213443219 | [2015/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013154895 | Date: | 17.10.2013 | Language: | EN | [2013/42] | Type: | A1 Application with search report | No.: | EP2837242 | Date: | 18.02.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.10.2013 takes the place of the publication of the European patent application. | [2015/08] | Type: | B1 Patent specification | No.: | EP2837242 | Date: | 30.08.2017 | Language: | EN | [2017/35] | Search report(s) | International search report - published on: | EP | 17.10.2013 | Classification | IPC: | H04W48/08, H04W76/02, // H04W88/06, H04L29/06, H04W12/06 | [2017/22] | CPC: |
H04W76/12 (EP,US);
H04W12/062 (EP,US);
H04W48/08 (EP,US);
H04L63/162 (EP,US);
H04W88/06 (EP,US)
|
Former IPC [2015/08] | H04W48/08, H04W88/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | DRAHTLOSE KOMMUNIKATIONSVORRICHTUNG, KOMMUNIKATIONSSYSTEM UND VERFAHREN ZUR HERSTELLUNG EINER DATENKONNEKTIVITÄT ZWISCHEN EINER DRAHTLOSEN KOMMUNIKATIONSVORRICHTUNG UND EINEM ERSTEN ZUGANGSNETZWERK | [2015/08] | English: | WIRELESS COMMUNICATION DEVICE, COMMUNICATION SYSTEM AND METHOD FOR ESTABLISHING DATA CONNECTIVITY BETWEEN A WIRELESS COMMUNICATION DEVICE AND A FIRST ACCESS NETWORK | [2015/08] | French: | DISPOSITIF DE COMMUNICATION SANS FIL, SYSTÈME DE COMMUNICATION ET PROCÉDÉ POUR ÉTABLIR UNE CONNECTIVITÉ DE DONNÉES ENTRE UN DISPOSITIF DE COMMUNICATION SANS FIL ET UN PREMIER RÉSEAU D'ACCÈS | [2015/08] | Entry into regional phase | 16.10.2014 | National basic fee paid | 16.10.2014 | Designation fee(s) paid | 16.10.2014 | Examination fee paid | Examination procedure | 16.10.2014 | Amendment by applicant (claims and/or description) | 16.10.2014 | Examination requested [2015/08] | 22.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 07.03.2017 | Reply to a communication from the examining division | 16.05.2017 | Communication of intention to grant the patent | 20.07.2017 | Fee for grant paid | 20.07.2017 | Fee for publishing/printing paid | 20.07.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.11.2016 | Opposition(s) | 31.05.2018 | No opposition filed within time limit [2018/32] | Fees paid | Renewal fee | 27.04.2015 | Renewal fee patent year 03 | 27.04.2016 | Renewal fee patent year 04 | 27.04.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.04.2013 | AL | 30.08.2017 | AT | 30.08.2017 | CY | 30.08.2017 | CZ | 30.08.2017 | DK | 30.08.2017 | EE | 30.08.2017 | ES | 30.08.2017 | FI | 30.08.2017 | HR | 30.08.2017 | IT | 30.08.2017 | LT | 30.08.2017 | LV | 30.08.2017 | MC | 30.08.2017 | MK | 30.08.2017 | PL | 30.08.2017 | PT | 30.08.2017 | RO | 30.08.2017 | RS | 30.08.2017 | SE | 30.08.2017 | SI | 30.08.2017 | SK | 30.08.2017 | SM | 30.08.2017 | TR | 30.08.2017 | BG | 30.11.2017 | NO | 30.11.2017 | GR | 01.12.2017 | IS | 30.12.2017 | IE | 04.04.2018 | LU | 04.04.2018 | MT | 04.04.2018 | BE | 30.04.2018 | CH | 30.04.2018 | LI | 30.04.2018 | [2020/34] |
Former [2020/31] | HU | 04.04.2013 | |
AT | 30.08.2017 | ||
CY | 30.08.2017 | ||
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MK | 30.08.2017 | ||
PL | 30.08.2017 | ||
PT | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 04.04.2018 | ||
LU | 04.04.2018 | ||
MT | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/28] | HU | 04.04.2013 | |
AT | 30.08.2017 | ||
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
PT | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 04.04.2018 | ||
LU | 04.04.2018 | ||
MT | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/16] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 04.04.2018 | ||
LU | 04.04.2018 | ||
MT | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/08] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 04.04.2018 | ||
LU | 04.04.2018 | ||
MT | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/19] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 04.04.2018 | ||
LU | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/12] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
LU | 04.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/08] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
LU | 04.04.2018 | ||
Former [2018/52] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/39] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/25] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/21] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/12] | AT | 30.08.2017 | |
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/11] | AT | 30.08.2017 | |
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/10] | AT | 30.08.2017 | |
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/09] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/08] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/07] | LT | 30.08.2017 | |
NO | 30.11.2017 | Cited in | International search | [A]US2004066769 (AHMAVAARA KALLE [FI], et al) [A] 1-20 * the whole document *; | [X]US2011170517 (BAKKER JAN HENDRIK LUCAS [US], et al) [X] 1,3-5,10,12-14,20 * page 6, paragraphs 134-139 * * page 7, paragraphs 141-147,152,154-157 * * page 8, paragraphs 169,171 * * page 10, paragraphs 196,199,204-207 * * page 12, paragraphs 236,239 * * page 14, paragraphs 256,261 * * page 15, paragraphs 277,281,283 * * page 16, paragraphs 285,294 * * page 17, paragraph 303 * * page 18, paragraphs 313,314,324 *; | [X] - 3GPP, "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on S2a Mobility based On GTP & WLAN access to EPC (SaMOG); Stage 2 (Release 11)", 3GPP DRAFT; TR23.852_SAMOG_V050_RM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111123), XP050575127 [X] 1-20 * page 8, paragraphs 5, 5.1, 5.2, 5.2.1 - page 9 * * page 13, paragraph 5 * * page 24, paragraph 7.1.1 - page 27 * * page 28, paragraph 7.1.1.2 * * page 29, paragraph 7.1.1.4 - page 30 * * page 30, paragraph 7.1.2.0 * | [X] - INTEL ET AL, "Solution for Trusted WLAN access to EPC", 3GPP DRAFT; S2-113148V2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110705), vol. SA WG2, no. Naantali; 20110711, XP050548468 [X] 1,4-10,13-20 * page 1, paragraphs 1,2 * * page 2, paragraphs 2,3,4 * * page 4, paragraph 7.2.x.1 - page 5, paragraph 7.2.x.2 * * page 6 - page 7 * * figures aa,bb * | [AD] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture enhancements for non-3GPP accesses (Release 10)", 3GPP STANDARD; 3GPP TS 23.402, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101217), no. V10.2.0, pages 1 - 228, XP050462100 [AD] 1-20 * the whole document * |