EP2850442 - METHOD FOR DETERMINING AT LEAST ONE STATE OF AN ELECTRIC CIRCUIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.07.2022 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 23.07.2021 | ||
Former | Grant of patent is intended Status updated on 21.03.2021 | ||
Former | Examination is in progress Status updated on 24.04.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Valeo Systèmes de Contrôle Moteur 14 avenue des Béguines 95800 Cergy Saint-Christophe / FR | [2021/34] |
Former [2015/13] | For all designated states Valeo Systèmes de Contrôle Moteur 14 avenue des Béguines B.P. 68532 95892 Cergy Pontoise / FR | Inventor(s) | 01 /
BRUYERE, Antoine 7 ruelle du Donjon F-78700 Evequemont / FR | [2015/13] | Representative(s) | Argyma 14 Boulevard de Strasbourg 31000 Toulouse / FR | [2021/34] | Application number, filing date | 13727248.0 | 03.05.2013 | [2021/34] | WO2013FR50989 | Priority number, date | FR20120054546 | 16.05.2012 Original published format: FR 1254546 | [2015/13] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2013171403 | Date: | 21.11.2013 | Language: | FR | [2013/47] | Type: | A1 Application with search report | No.: | EP2850442 | Date: | 25.03.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 21.11.2013 takes the place of the publication of the European patent application. | [2015/13] | Type: | B1 Patent specification | No.: | EP2850442 | Date: | 25.08.2021 | Language: | FR | [2021/34] | Search report(s) | International search report - published on: | EP | 21.11.2013 | Classification | IPC: | G01R31/34, H02P29/02 | [2015/13] | CPC: |
G01R31/34 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR BESTIMMUNG VON WENIGSTENS EINES ZUSTANDES EINER ELEKTRISCHEN SCHALTUNG | [2015/13] | English: | METHOD FOR DETERMINING AT LEAST ONE STATE OF AN ELECTRIC CIRCUIT | [2015/13] | French: | PROCÉDÉ DE DÉTERMINATION D'AU MOINS UN ÉTAT D'UN CIRCUIT ÉLECTRIQUE | [2015/13] | Entry into regional phase | 17.11.2014 | National basic fee paid | 17.11.2014 | Designation fee(s) paid | 17.11.2014 | Examination fee paid | Examination procedure | 17.11.2014 | Examination requested [2015/13] | 18.05.2015 | Amendment by applicant (claims and/or description) | 29.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 05.11.2020 | Reply to a communication from the examining division | 22.03.2021 | Communication of intention to grant the patent | 15.07.2021 | Fee for grant paid | 15.07.2021 | Fee for publishing/printing paid | 15.07.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.04.2020 | Opposition(s) | 27.05.2022 | No opposition filed within time limit [2022/31] | Fees paid | Renewal fee | 28.04.2015 | Renewal fee patent year 03 | 28.04.2016 | Renewal fee patent year 04 | 29.04.2017 | Renewal fee patent year 05 | 25.05.2018 | Renewal fee patent year 06 | 23.05.2019 | Renewal fee patent year 07 | 22.05.2020 | Renewal fee patent year 08 | 28.04.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.05.2013 | AL | 25.08.2021 | AT | 25.08.2021 | CY | 25.08.2021 | CZ | 25.08.2021 | DK | 25.08.2021 | EE | 25.08.2021 | ES | 25.08.2021 | FI | 25.08.2021 | HR | 25.08.2021 | IT | 25.08.2021 | LT | 25.08.2021 | LV | 25.08.2021 | MC | 25.08.2021 | MK | 25.08.2021 | MT | 25.08.2021 | NL | 25.08.2021 | PL | 25.08.2021 | RO | 25.08.2021 | RS | 25.08.2021 | SE | 25.08.2021 | SI | 25.08.2021 | SK | 25.08.2021 | SM | 25.08.2021 | BG | 25.11.2021 | NO | 25.11.2021 | GR | 26.11.2021 | IS | 25.12.2021 | PT | 27.12.2021 | IE | 03.05.2022 | LU | 03.05.2022 | [2024/41] |
Former [2024/22] | HU | 03.05.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
MK | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 03.05.2022 | ||
LU | 03.05.2022 | ||
Former [2024/20] | HU | 03.05.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CY | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 03.05.2022 | ||
LU | 03.05.2022 | ||
Former [2024/18] | HU | 03.05.2013 | |
AL | 25.08.2021 | ||
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 03.05.2022 | ||
LU | 03.05.2022 | ||
Former [2023/20] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
IE | 03.05.2022 | ||
LU | 03.05.2022 | ||
Former [2023/08] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
LU | 03.05.2022 | ||
Former [2023/06] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
MC | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/36] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
IT | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SI | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/29] | AL | 25.08.2021 | |
AT | 25.08.2021 | ||
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/26] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
SM | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/24] | AT | 25.08.2021 | |
CZ | 25.08.2021 | ||
DK | 25.08.2021 | ||
EE | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RO | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
SK | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/21] | AT | 25.08.2021 | |
DK | 25.08.2021 | ||
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/16] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
NL | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/10] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
HR | 25.08.2021 | ||
LT | 25.08.2021 | ||
LV | 25.08.2021 | ||
PL | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
GR | 26.11.2021 | ||
IS | 25.12.2021 | ||
PT | 27.12.2021 | ||
Former [2022/09] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
RS | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
PT | 27.12.2021 | ||
Former [2022/08] | AT | 25.08.2021 | |
ES | 25.08.2021 | ||
FI | 25.08.2021 | ||
LT | 25.08.2021 | ||
SE | 25.08.2021 | ||
BG | 25.11.2021 | ||
NO | 25.11.2021 | ||
Former [2022/07] | AT | 25.08.2021 | |
LT | 25.08.2021 | ||
NO | 25.11.2021 | Cited in | International search | [X]US5568034 (HUGGETT COLIN [US], et al) [X] 1-13 * the whole document *; | [A] - Hussein Dogan ET AL, "Performance Analysis and Comparison of Three IPMSM with High Homopolar Inductance for Electric Vehicle Applications", EPE 2011, Birmingham, ISBN 978-9-07-581515-3, (20110914), pages 1 - 10, URL: http://hal.inria.fr/docs/00/62/36/11/PDF/0751-epe2011-full-20321821.pdf, (20130225), XP055054467 [A] 1-13 * figure 1 * | [A] - ERTUGRUL N ET AL, "Fault tolerant motor drive system with redundancy for critical applications", POWER ELECTRONICS SPECIALISTS CONFERENCE; [ANNUAL POWER ELECTRONICS SPECIALISTS CONFERENCE],, (20020623), vol. 3, ISBN 978-0-7803-7262-7, pages 1457 - 1462, XP010595953 [A] 1-13 * tables 1,2 * | [A] - ABOLHASSANI M T ET AL, "Fault tolerant permanent magnet motor drives for electric vehicles", ELECTRIC MACHINES AND DRIVES CONFERENCE, 2009. IEMDC '09. IEEE INTERNATIONAL, IEEE, PISCATAWAY, NJ, USA, (20090503), ISBN 978-1-4244-4251-5, pages 1146 - 1152, XP031475916 [A] 1-13 * the whole document * |