EP2801031 - FAULT-TOLERANT SENSING AND MONITORING COMMUNICATIONS BUS SYSTEM FOR AGRICULTURAL APPLICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.05.2018 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 16.06.2017 | ||
Former | Grant of patent is intended Status updated on 18.01.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Dickey-John 500 Cardigan Road St. Paul, MN 55126 / US | [2014/46] | Inventor(s) | 01 /
KUHNEL, David 3534 Maplewood Lane Johnstown, CO 80534 / US | 02 /
MILLER, Gregory C. 313 Brookside Lane Chatham, IL 62629 / US | [2014/46] | Representative(s) | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB Prinz-Ludwig-Straße 40A 85354 Freising / DE | [N/P] |
Former [2014/46] | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro Prinz-Ludwig-Straße 40A 85354 Freising / DE | Application number, filing date | 13733907.3 | 07.01.2013 | [2017/29] | WO2013US20464 | Priority number, date | US201261584000P | 06.01.2012 Original published format: US 201261584000 P | [2014/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013103937 | Date: | 11.07.2013 | Language: | EN | [2013/28] | Type: | A1 Application with search report | No.: | EP2801031 | Date: | 12.11.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.07.2013 takes the place of the publication of the European patent application. | [2014/46] | Type: | B1 Patent specification | No.: | EP2801031 | Date: | 19.07.2017 | Language: | EN | [2017/29] | Search report(s) | International search report - published on: | US | 11.07.2013 | (Supplementary) European search report - dispatched on: | EP | 30.07.2015 | Classification | IPC: | G06F11/07, G06F11/20, H04L12/40, H04L12/42, A01C21/00, G01F1/76, A01B79/00, A01C7/10 | [2017/07] | CPC: |
A01B79/005 (EP,US);
A01C21/00 (EP,US);
A01C7/105 (EP,US);
G01F1/76 (US);
G05B23/0216 (US);
G06F11/0736 (EP,US);
G06F11/079 (EP,US);
G06F11/2007 (EP,US);
G06F11/2015 (EP,US);
H04L12/40 (US);
H04L12/40176 (EP,US);
H04L12/42 (EP,US);
H04L41/0668 (US);
H04L41/0686 (US);
H04L2012/40215 (US);
|
Former IPC [2015/36] | G06F11/00, G06F11/20, A01B79/00, A01C7/10, A01C17/00 | ||
Former IPC [2014/46] | G06F11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FEHLERTOLERANTE MESSUNG UND ÜBERWACHUNG EINES KOMMUNIKATIONSBUSSYSTEMS FÜR LANDWIRTSCHAFTLICHE ANWENDUNGEN | [2014/46] | English: | FAULT-TOLERANT SENSING AND MONITORING COMMUNICATIONS BUS SYSTEM FOR AGRICULTURAL APPLICATIONS | [2014/46] | French: | SYSTÈME DE BUS DE COMMUNICATION DE DÉTECTION ET DE SURVEILLANCE INSENSIBLE AUX DÉFAILLANCES POUR APPLICATIONS AGRICOLES | [2014/46] | Entry into regional phase | 18.07.2014 | National basic fee paid | 18.07.2014 | Search fee paid | 18.07.2014 | Designation fee(s) paid | 18.07.2014 | Examination fee paid | Examination procedure | 18.07.2014 | Examination requested [2014/46] | 25.02.2016 | Amendment by applicant (claims and/or description) | 27.07.2016 | Despatch of a communication from the examining division (Time limit: M02) | 05.10.2016 | Reply to a communication from the examining division | 24.01.2017 | Communication of intention to grant the patent | 01.06.2017 | Receipt of the translation of the claim(s) | 06.06.2017 | Fee for grant paid | 06.06.2017 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.07.2016 | Opposition(s) | 20.04.2018 | No opposition filed within time limit [2018/26] | Fees paid | Renewal fee | 26.01.2015 | Renewal fee patent year 03 | 11.01.2016 | Renewal fee patent year 04 | 11.01.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.01.2013 | AL | 19.07.2017 | AT | 19.07.2017 | CY | 19.07.2017 | CZ | 19.07.2017 | DK | 19.07.2017 | EE | 19.07.2017 | ES | 19.07.2017 | FI | 19.07.2017 | HR | 19.07.2017 | LT | 19.07.2017 | LV | 19.07.2017 | MC | 19.07.2017 | MK | 19.07.2017 | NL | 19.07.2017 | PL | 19.07.2017 | PT | 19.07.2017 | RO | 19.07.2017 | RS | 19.07.2017 | SI | 19.07.2017 | SK | 19.07.2017 | SM | 19.07.2017 | TR | 19.07.2017 | BG | 19.10.2017 | NO | 19.10.2017 | GR | 20.10.2017 | IS | 19.11.2017 | IE | 07.01.2018 | LU | 07.01.2018 | MT | 07.01.2018 | BE | 31.01.2018 | CH | 31.01.2018 | LI | 31.01.2018 | [2020/34] |
Former [2020/31] | HU | 07.01.2013 | |
AT | 19.07.2017 | ||
CY | 19.07.2017 | ||
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
MK | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
PT | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
MT | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/28] | HU | 07.01.2013 | |
AT | 19.07.2017 | ||
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
PT | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
MT | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/15] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
MT | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/08] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
MT | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/30] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/09] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
IE | 07.01.2018 | ||
LU | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/52] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
LU | 07.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/50] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
LU | 07.01.2018 | ||
BE | 31.01.2018 | ||
Former [2018/47] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
LU | 07.01.2018 | ||
Former [2018/39] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/24] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/21] | AT | 19.07.2017 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/12] | AT | 19.07.2017 | |
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/11] | AT | 19.07.2017 | |
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/10] | AT | 19.07.2017 | |
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
RS | 19.07.2017 | ||
NO | 19.10.2017 | ||
Former [2018/08] | FI | 19.07.2017 | |
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
NO | 19.10.2017 | ||
Former [2018/07] | LT | 19.07.2017 | |
NO | 19.10.2017 | Documents cited: | Search | [Y]US6009354 (FLAMME DAVID D [US] ET AL) [Y] 1-13 * abstract * * figures 3,5 * * column 5, line 21 - column 6, line 42 * * column 7, line 34 - column 4, line 22 * * claims 7,18 *; | [Y]US5621666 (O'NEALL DONALD L [US] ET AL) [Y] 1-13 * abstract * * figure 4 * * column 9, line 52 - column 10, line 18; figure 5 *; | [A]US2009276666 (HALEY NEIL [US] ET AL) [A] 1-13 * abstract * * paragraphs [0019] - [0024] - [0058] , [0089] - [0097]; figure 5 * | International search | [Y]US6009354 (FLAMME DAVID D [US], et al); | [Y]US2008201994 (CRAGO TERRY [US]); | [Y]US2008262669 (SMID EDZKO [US], et al); | [A]US2007042803 (ANDERSON NOEL W [US]) | by applicant | US5864781 |