EP2873116 - FUEL SUPPLY MODULE WITH A MODULAR ELECTRICAL CONNECTOR [Right-click to bookmark this link] | |||
Former [2015/21] | MODULAR ELECTRICAL CONNECTOR AND CONNECTION METHOD | ||
[2022/10] | Status | No opposition filed within time limit Status updated on 22.09.2023 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 14.10.2022 | ||
Former | Grant of patent is intended Status updated on 05.07.2022 | ||
Former | Examination is in progress Status updated on 21.06.2022 | ||
Former | Grant of patent is intended Status updated on 22.02.2022 | ||
Former | Examination is in progress Status updated on 12.05.2017 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2016/03] | For all designated states Robert Bosch GmbH Wernerstrasse 51 70469 Stuttgart / DE | ||
Former [2015/21] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
SMITH, Daniel E. 6659 Berrywood Drive Brighton, Michigan 48116 / US | 02 /
MASON, Paul 22501 Edison Street Dearborn, Michigan 48124 / US | 03 /
TOUTANT, David 1916 Manchester Boulevard Grosse Pointe Woods, Michigan 48236 / US | [2022/46] |
Former [2015/21] | 01 /
SMITH, Daniel E. 6659 Berrywood Drive Brighton, Michigan 48116 / US | ||
02 /
MASON, Paul 22501 Edison Street Dearborn, Michigan 48124 / US | |||
03 /
TOUTAN, David 1916 Manchester Boulevard Grosse Pointe Woods, Michigan 48236 / US | Representative(s) | DREISS Patentanwälte PartG mbB Postfach 10 37 62 70032 Stuttgart / DE | [2015/21] | Application number, filing date | 13737093.8 | 01.07.2013 | [2022/46] | WO2013US48850 | Priority number, date | US201261671190P | 13.07.2012 Original published format: US 201261671190 P | US201313789859 | 08.03.2013 Original published format: US201313789859 | [2015/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014011422 | Date: | 16.01.2014 | Language: | EN | [2014/03] | Type: | A1 Application with search report | No.: | EP2873116 | Date: | 20.05.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.01.2014 takes the place of the publication of the European patent application. | [2015/21] | Type: | B1 Patent specification | No.: | EP2873116 | Date: | 16.11.2022 | Language: | EN | [2022/46] | Search report(s) | International search report - published on: | EP | 16.01.2014 | Classification | IPC: | H01R13/506, H01R13/436, H01R13/514, H01R13/53 | [2022/10] | CPC: |
H01R13/514 (EP,CN,US);
H01R13/46 (US);
H01R13/53 (EP,CN,US);
H01R13/4367 (EP,CN,US);
H01R13/506 (EP,CN,US);
H01R2201/26 (CN)
|
Former IPC [2015/21] | H01R13/514, H01R13/53 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KRAFTSTOFFVERSORGUNGSMODUL MIT EINEM MODULAREN ELEKTRISCHEN VERBINDER | [2022/46] | English: | FUEL SUPPLY MODULE WITH A MODULAR ELECTRICAL CONNECTOR | [2022/46] | French: | MODULE D'ALIMENTATION EN CARBURANT AVEC UN CONNECTEUR ÉLECTRIQUE MODULAIRE | [2022/46] |
Former [2015/21] | MODULARER ELEKTRISCHER VERBINDER UND VERBINDUNGSVERFAHREN | ||
Former [2015/21] | MODULAR ELECTRICAL CONNECTOR AND CONNECTION METHOD | ||
Former [2015/21] | CONNECTEUR ÉLECTRIQUE MODULAIRE ET PROCÉDÉ DE CONNEXION | Entry into regional phase | 13.02.2015 | National basic fee paid | 13.02.2015 | Designation fee(s) paid | 13.02.2015 | Examination fee paid | Examination procedure | 13.02.2015 | Examination requested [2015/21] | 01.09.2015 | Amendment by applicant (claims and/or description) | 04.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 26.07.2017 | Reply to a communication from the examining division | 14.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.06.2018 | Reply to a communication from the examining division | 03.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 13.05.2020 | Reply to a communication from the examining division | 22.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.03.2021 | Reply to a communication from the examining division | 23.02.2022 | Communication of intention to grant the patent | 20.06.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.07.2022 | Communication of intention to grant the patent | 07.10.2022 | Fee for grant paid | 07.10.2022 | Fee for publishing/printing paid | 07.10.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.05.2017 | Opposition(s) | 17.08.2023 | No opposition filed within time limit [2023/43] | Fees paid | Renewal fee | 31.07.2015 | Renewal fee patent year 03 | 01.08.2016 | Renewal fee patent year 04 | 31.07.2017 | Renewal fee patent year 05 | 31.07.2018 | Renewal fee patent year 06 | 31.07.2019 | Renewal fee patent year 07 | 31.07.2020 | Renewal fee patent year 08 | 02.08.2021 | Renewal fee patent year 09 | 01.08.2022 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 16.11.2022 | AT | 16.11.2022 | BG | 16.11.2022 | CZ | 16.11.2022 | DK | 16.11.2022 | EE | 16.11.2022 | ES | 16.11.2022 | FI | 16.11.2022 | HR | 16.11.2022 | IT | 16.11.2022 | LT | 16.11.2022 | LV | 16.11.2022 | MC | 16.11.2022 | NL | 16.11.2022 | PL | 16.11.2022 | RO | 16.11.2022 | RS | 16.11.2022 | SE | 16.11.2022 | SI | 16.11.2022 | SK | 16.11.2022 | SM | 16.11.2022 | NO | 16.02.2023 | GR | 17.02.2023 | IS | 16.03.2023 | PT | 16.03.2023 | IE | 01.07.2023 | LU | 01.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | [2024/51] |
Former [2024/33] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
IT | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
IE | 01.07.2023 | ||
LU | 01.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
Former [2024/26] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
IT | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
LU | 01.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
Former [2024/24] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
LU | 01.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
Former [2024/18] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
LU | 01.07.2023 | ||
Former [2024/14] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
MC | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/51] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SI | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/38] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SK | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/37] | AL | 16.11.2022 | |
AT | 16.11.2022 | ||
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/35] | AT | 16.11.2022 | |
CZ | 16.11.2022 | ||
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RO | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/34] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
EE | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/33] | AT | 16.11.2022 | |
DK | 16.11.2022 | ||
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
SM | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/29] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
NL | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/26] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
PL | 16.11.2022 | ||
RS | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
IS | 16.03.2023 | ||
PT | 16.03.2023 | ||
Former [2023/24] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
HR | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/23] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
LV | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
GR | 17.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/22] | AT | 16.11.2022 | |
ES | 16.11.2022 | ||
FI | 16.11.2022 | ||
LT | 16.11.2022 | ||
SE | 16.11.2022 | ||
NO | 16.02.2023 | ||
PT | 16.03.2023 | ||
Former [2023/20] | LT | 16.11.2022 | |
NO | 16.02.2023 | Cited in | International search | [A]GB2108331 (BICC PLC) [A] 1-20 * column 1, lines 38-58 *; | [X]EP0923164 (MOLEX INC [US]) [X] 1,6 * paragraph [0013] *; | [Y]JP2005276574 (YAZAKI CORP) [Y] 16,17 * paragraph [0033] - paragraph [0034] *; | [XYI]EP1724880 (DEUTSCH ENGINEERED CONNECTING [US]) [X] 1,3,7,8,13,14,20 * paragraphs [0024] , [0 25] , [0027] , [0 34]; figures 1a, 1b, 3a, 3b, 4, 10 * [Y] 2,9-12,16-19 [I] 15; | [Y]US2008020639 (ICHIO TOSHIFUMI [JP]) [Y] 8,10,11 * paragraphs [0043] , [0047] *; | [Y]EP2023445 (SUMITOMO WIRING SYSTEMS [JP]) [Y] 8,10,12 * paragraph [0059] *; | [X]US2011053403 (TSURUTA SATOSHI [JP], et al) [X] 1,4,5 * paragraph [0030] *; | [A]EP2302745 (TYCO ELECTRONICS CORP [US]) [A] 12* the whole document *; | [Y] - PEPPERL+FUCHS, "Engineer's Guide Pepperl+Fuchs passage", HTTP://WEB.ARCHIVE.ORG/WEB/20061024001229/HTTP://WWW.AM.PEPPERL-FUCHS.COM/PDF/DOCUMENTS/EG06_P007-96_ENGINEER_GUIDE.PDF, (20061024), pages 1 - 90, XP002556001 [Y] 2,8,9,18,19 * page 28 * | Examination | US4752251 | WO9528021 | US2004110427 |