EP2806789 - METHOD AND DEVICE FOR RECOGNIZING AND REMOVING UNDESIRED ARTIFACTS IN MULTICHANNEL MAGNETIC FIELD OR ELECTRIC POTENTIAL MEASUREMENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.07.2018 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 28.07.2017 | ||
Former | Grant of patent is intended Status updated on 12.04.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Elekta AB (PUBL). Kungstensgatan 18 103 93 Stockholm / SE | [2014/49] | Inventor(s) | 01 /
SIMOLA, Juha Kaskenpolttajantie 12 E FI-00670 Helsinki / FI | 02 /
TAULU, Samu Tunnelitie 9 G 54 FI-00320 Helsinki / FI | 03 /
KAJOLA, Matti Elontie 63 FI-00660 Helsinki / FI | [2014/49] | Representative(s) | Papula Oy P.O. Box 981 00101 Helsinki / FI | [2014/49] | Application number, filing date | 13740539.5 | 24.01.2013 | [2017/35] | WO2013IB50595 | Priority number, date | FI20120005075 | 24.01.2012 Original published format: FI 20125075 | [2014/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013111072 | Date: | 01.08.2013 | Language: | EN | [2013/31] | Type: | A1 Application with search report | No.: | EP2806789 | Date: | 03.12.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.08.2013 takes the place of the publication of the European patent application. | [2014/49] | Type: | B1 Patent specification | No.: | EP2806789 | Date: | 30.08.2017 | Language: | EN | [2017/35] | Search report(s) | International search report - published on: | SE | 01.08.2013 | (Supplementary) European search report - dispatched on: | EP | 23.09.2015 | Classification | IPC: | A61B5/04, G01R33/035 | [2015/43] | CPC: |
A61B5/7203 (EP,FI,US);
A61B5/0042 (FI);
A61B5/24 (EP,US);
G01R29/12 (US);
G01R33/0017 (FI);
G01R33/02 (US);
G01R33/025 (FI);
G01R33/035 (EP,US);
G01R33/0354 (FI);
G01R33/56 (US);
A61B5/0024 (US);
A61B5/055 (EP,US);
|
Former IPC [2014/49] | A61B5/04, A61B5/00, G01R33/035 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ERKENNUNG UND BESEITIGUNG UNERWÜNSCHTER ARTEFAKTE BEI MEHRKANALIGEN MAGNETFELDERN ODER ELEKTRISCHEN POTENTIALMESSUNGEN | [2014/49] | English: | METHOD AND DEVICE FOR RECOGNIZING AND REMOVING UNDESIRED ARTIFACTS IN MULTICHANNEL MAGNETIC FIELD OR ELECTRIC POTENTIAL MEASUREMENTS | [2014/49] | French: | PROCÉDÉ ET DISPOSITIF PERMETTANT DE RECONNAÎTRE ET DE SUPPRIMER DES ARTEFACTS NON SOUHAITÉS DANS LES MESURES DE POTENTIEL ÉLECTRIQUE ET DE CHAMP MAGNÉTIQUE À CANAUX MULTIPLES | [2014/49] | Entry into regional phase | 21.08.2014 | National basic fee paid | 21.08.2014 | Search fee paid | 21.08.2014 | Designation fee(s) paid | 21.08.2014 | Examination fee paid | Examination procedure | 21.08.2014 | Examination requested [2014/49] | 07.04.2016 | Amendment by applicant (claims and/or description) | 13.04.2017 | Communication of intention to grant the patent | 24.07.2017 | Fee for grant paid | 24.07.2017 | Fee for publishing/printing paid | 24.07.2017 | Receipt of the translation of the claim(s) | 02.08.2017 | Request for correction of the decision to grant filed | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.04.2017 | Opposition(s) | 31.05.2018 | No opposition filed within time limit [2018/32] | Fees paid | Renewal fee | 13.01.2015 | Renewal fee patent year 03 | 27.01.2016 | Renewal fee patent year 04 | 27.01.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.01.2013 | AL | 30.08.2017 | AT | 30.08.2017 | CY | 30.08.2017 | CZ | 30.08.2017 | DK | 30.08.2017 | EE | 30.08.2017 | ES | 30.08.2017 | FI | 30.08.2017 | HR | 30.08.2017 | LT | 30.08.2017 | LV | 30.08.2017 | MC | 30.08.2017 | MK | 30.08.2017 | PL | 30.08.2017 | PT | 30.08.2017 | RO | 30.08.2017 | RS | 30.08.2017 | SE | 30.08.2017 | SI | 30.08.2017 | SK | 30.08.2017 | SM | 30.08.2017 | TR | 30.08.2017 | BG | 30.11.2017 | NO | 30.11.2017 | GR | 01.12.2017 | IS | 30.12.2017 | IE | 24.01.2018 | LU | 24.01.2018 | MT | 24.01.2018 | BE | 31.01.2018 | CH | 31.01.2018 | LI | 31.01.2018 | [2020/34] |
Former [2020/31] | HU | 24.01.2013 | |
AT | 30.08.2017 | ||
CY | 30.08.2017 | ||
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MK | 30.08.2017 | ||
PL | 30.08.2017 | ||
PT | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
MT | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/28] | HU | 24.01.2013 | |
AT | 30.08.2017 | ||
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
PT | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
MT | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/16] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
TR | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
MT | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/08] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
MT | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/30] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/09] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
IE | 24.01.2018 | ||
LU | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/52] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
LU | 24.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/50] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
LU | 24.01.2018 | ||
BE | 31.01.2018 | ||
Former [2018/47] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
LU | 24.01.2018 | ||
Former [2018/39] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SI | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/25] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
SM | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/21] | AT | 30.08.2017 | |
CZ | 30.08.2017 | ||
DK | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/12] | AT | 30.08.2017 | |
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/11] | AT | 30.08.2017 | |
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/10] | AT | 30.08.2017 | |
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
RS | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/09] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/08] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/07] | LT | 30.08.2017 | |
NO | 30.11.2017 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]WO2012004458 (ELEKTA AB [SE], et al); | [A] - TAULU S. ET AL., "Spatiotemporal Signal Space Separation method for rejecting nearby interference in MEG measurements", PHYSICS IN MEDICINE AND BIOLOGY, (2006), vol. 51, no. 7, pages 1759 - 1768, XP020096211 DOI: http://dx.doi.org/10.1088/0031-9155/51/7/008 | [A] - OZKURT, T. E ET AL., "Decomposition of Magnetoencephalographic Data Into Components Corresponding to Deep and Superficial Sources", IEEE TRANSACTION OF BIOMEDICAL ENGINEERING, (2008), vol. 55, no. 6, pages 1716 - 1727, XP011342702 DOI: http://dx.doi.org/10.1109/TBME.2008.919120 | [A] - VRBA, J ET AL., "Signal Space Separation Beamformer", BRAIN TOPOGRAPHY, (2010), vol. 23, pages 128 - 133, XP019814315 | [A] - MEDVEDOVSKY, M ET AL., "Fine tuning the correlation limit of spatio-temporal signal space separation for magnetoencephalography", JOURNAL OF NEUROSCIENCE METHODS, (2009), vol. 177, pages 203 - 211, XP025841283 DOI: http://dx.doi.org/10.1016/j.jneumeth.2008.09.035 |