EP3031309 - COOLING APPARATUS FOR AN ELECTRICAL OR ELECTRONIC DEVICE, AND ELECTRICAL OR ELECTRONIC DEVICE, IN PARTICULAR A CIRCUIT BREAKER, COMPRISING SUCH COOLING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.10.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 02.11.2018 | ||
Former | Grant of patent is intended Status updated on 17.07.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states ABB S.p.A. Via Vittor Pisani 16 20124 Milano / IT | [2016/24] | Inventor(s) | 01 /
MOLITOR, Francoise Schaffhauserstrasse 192 CH-8057 Zurich / CH | 02 /
KAUFMANN, Patrik Wiesenstrasse 2 CH-5400 Baden / CH | 03 /
BUEHLER, Tilo Högernweg 38 CH-5504 Othmarsingen / CH | 04 /
AGOSTINI, Francesco Riedtalstrasse 4 CH-4800 Zofingen / CH | 05 /
GRADINGER, Thomas Birkenweg 3 5032 Aarau Rohr / CH | 06 /
GAMBA, Federico Via Pescaria 7/B 24123 Bergamo / IT | [2016/24] | Representative(s) | Giavarini, Francesco Zanoli & Giavarini S.p.A. Via Melchiorre Gioia, 64 20125 Milano / IT | [2018/49] |
Former [2016/24] | De Santis, Giovanni ABB S.p.A. Via L. Lama, 33 20099 Sesto San Giovanni (MI) / IT | Application number, filing date | 13745437.7 | 07.08.2013 | [2016/24] | WO2013EP66549 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015018443 | Date: | 12.02.2015 | Language: | EN | [2015/06] | Type: | A1 Application with search report | No.: | EP3031309 | Date: | 15.06.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.02.2015 takes the place of the publication of the European patent application. | [2016/24] | Type: | B1 Patent specification | No.: | EP3031309 | Date: | 05.12.2018 | Language: | EN | [2018/49] | Search report(s) | International search report - published on: | EP | 12.02.2015 | Classification | IPC: | H05K7/20, H01H9/52, H02B1/56 | [2016/24] | CPC: |
H05K7/20681 (EP);
G12B15/06 (RU);
H05K7/20218 (US);
H01H9/52 (EP,US);
H02B1/56 (EP,US);
H05K7/20336 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG ZUM KÜHLEN EINES ELEKTRISCHEN ODER ELEKTRONISCHEN GERÄTS UND ELEKTRISCHES ODER ELEKTRONISCHES GERÄT, INSBESONDERE EINES LEISTUNGSSCHALTERS MIT SOLCH EINER VORRICHTUNG | [2018/31] | English: | COOLING APPARATUS FOR AN ELECTRICAL OR ELECTRONIC DEVICE, AND ELECTRICAL OR ELECTRONIC DEVICE, IN PARTICULAR A CIRCUIT BREAKER, COMPRISING SUCH COOLING APPARATUS | [2016/24] | French: | DISPOSITIF DE REFROIDISSEMENT POUR APPAREILLAGE ÉLECTRIQUE OU ÉLECTRONIQUE ET APPAREILLAGE ÉLECTRIQUE OU ÉLECTRONIQUE, NOTAMMENT D'UN DISJONCTEUR COMPRENANT UN TEL DISPOSITIF DE REFROIDISSEMENT | [2018/31] |
Former [2016/24] | KÜHLVORRICHTUNG FÜR EINE ELEKTRISCHE ODER ELEKTRONISCHE VORRICHTUNG SOWIE ELEKTRISCHE ODER ELEKTRONISCHE VORRICHTUNG, INSBESONDERE SCHUTZSCHALTER, MIT EINER DERARTIGEN KÜHLVORRICHTUNG | ||
Former [2016/24] | APPAREIL DE REFROIDISSEMENT POUR UN DISPOSITIF ÉLECTRIQUE OU ÉLECTRONIQUE ET DISPOSITIF ÉLECTRIQUE OU ÉLECTRONIQUE, EN PARTICULIER UN DISJONCTEUR, COMPRENANT LEDIT APPAREIL DE REFROIDISSEMENT | Entry into regional phase | 19.01.2016 | National basic fee paid | 19.01.2016 | Designation fee(s) paid | 19.01.2016 | Examination fee paid | Examination procedure | 19.01.2016 | Examination requested [2016/24] | 15.09.2016 | Amendment by applicant (claims and/or description) | 18.07.2018 | Communication of intention to grant the patent | 19.10.2018 | Fee for grant paid | 19.10.2018 | Fee for publishing/printing paid | 19.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.07.2018 | Opposition(s) | 06.09.2019 | No opposition filed within time limit [2019/46] | Fees paid | Renewal fee | 19.01.2016 | Renewal fee patent year 03 | 22.08.2016 | Renewal fee patent year 04 | 22.08.2017 | Renewal fee patent year 05 | 28.08.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.08.2013 | AL | 05.12.2018 | AT | 05.12.2018 | CY | 05.12.2018 | CZ | 05.12.2018 | DK | 05.12.2018 | EE | 05.12.2018 | ES | 05.12.2018 | FI | 05.12.2018 | HR | 05.12.2018 | LT | 05.12.2018 | LV | 05.12.2018 | MC | 05.12.2018 | MK | 05.12.2018 | MT | 05.12.2018 | NL | 05.12.2018 | PL | 05.12.2018 | RO | 05.12.2018 | RS | 05.12.2018 | SE | 05.12.2018 | SI | 05.12.2018 | SK | 05.12.2018 | SM | 05.12.2018 | TR | 05.12.2018 | BG | 05.03.2019 | NO | 05.03.2019 | GR | 06.03.2019 | IS | 05.04.2019 | PT | 05.04.2019 | IE | 07.08.2019 | LU | 07.08.2019 | BE | 31.08.2019 | CH | 31.08.2019 | LI | 31.08.2019 | [2022/31] |
Former [2021/34] | HU | 07.08.2013 | |
AL | 05.12.2018 | ||
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
MT | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/32] | HU | 07.08.2013 | |
AL | 05.12.2018 | ||
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CY | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/38] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/36] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/25] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
MC | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
LU | 07.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/17] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
TR | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/50] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SI | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/48] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
DK | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/39] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SK | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
IS | 05.04.2019 | ||
PT | 05.04.2019 | ||
Former [2019/37] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
EE | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RO | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
SM | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/35] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
CZ | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
PL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/33] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
PT | 05.04.2019 | ||
Former [2019/30] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
NL | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/26] | AL | 05.12.2018 | |
AT | 05.12.2018 | ||
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/25] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
RS | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/24] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
SE | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
GR | 06.03.2019 | ||
Former [2019/23] | AT | 05.12.2018 | |
ES | 05.12.2018 | ||
FI | 05.12.2018 | ||
HR | 05.12.2018 | ||
LT | 05.12.2018 | ||
LV | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/22] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
BG | 05.03.2019 | ||
NO | 05.03.2019 | ||
Former [2019/21] | FI | 05.12.2018 | |
LT | 05.12.2018 | ||
NO | 05.03.2019 | ||
Former [2019/20] | LT | 05.12.2018 | |
NO | 05.03.2019 | Cited in | International search | [A]DE202006013674U (ABB PATENT GMBH [DE]); | [XDI]EP2256772 (ABB SPA [IT]); | [AD]EP2552182 (ABB RESEARCH LTD [CH]) | by applicant | EP2256772 | EP2552182 |