Extract from the Register of European Patents

EP About this file: EP2864539

EP2864539 - A WATER CHAMBER FOR A STEAM GENERATING DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.12.2020
Database last updated on 10.03.2026
FormerThe patent has been granted
Status updated on  10.01.2020
FormerGrant of patent is intended
Status updated on  11.09.2019
FormerExamination is in progress
Status updated on  28.03.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Koninklijke Philips N.V.
High Tech Campus 52
5656 AG Eindhoven / NL
[2020/12]
Former [2020/07]For all designated states
Koninklijke Philips N.V.
High Tech Campus 5
5656 AE Eindhoven / NL
Former [2015/18]For all designated states
Koninklijke Philips N.V.
High Tech Campus 5
5656 AE Eindhoven / NL
Inventor(s)01 / CHEN, Sen Kee
c/o High Tech Campus 5
NL-5656 AE Eindhoven / NL
 [2015/18]
Representative(s)Coops, Peter
Philips Intellectual Property & Standards
High Tech Campus 5
5656 AE Eindhoven / NL
[2020/07]
Former [2015/18]Coops, Peter
Philips International B.V.
Intellectual Property & Standards
High Tech Campus 5
5656 AE Eindhoven / NL
Application number, filing date13759582.324.06.2013
[2020/07]
WO2013IB55162
Priority number, dateUS201261663658P25.06.2012         Original published format: US 201261663658 P
[2015/18]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2014001989
Date:03.01.2014
Language:EN
[2014/01]
Type: A2 Application without search report 
No.:EP2864539
Date:29.04.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 03.01.2014 takes the place of the publication of the European patent application.
[2015/18]
Type: B1 Patent specification 
No.:EP2864539
Date:12.02.2020
Language:EN
[2020/07]
Type: B8 Corrected title page of specification 
No.:EP2864539
Date:25.03.2020
[2020/13]
Search report(s)International search report - published on:EP06.03.2014
ClassificationIPC:D06F75/14, // D06F87/00
[2019/33]
CPC:
D06F75/14 (EP,CN,RU,US); D06F87/00 (EP,RU,US); D06F73/00 (CN)
Former IPC [2015/18]D06F75/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/18]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:WASSERKAMMER FÜR EINE DAMPFERZEUGUNGSVORRICHTUNG[2015/18]
English:A WATER CHAMBER FOR A STEAM GENERATING DEVICE[2015/18]
French:CHAMBRE À EAU POUR UN DISPOSITIF DE GÉNÉRATION DE VAPEUR[2015/18]
Entry into regional phase26.01.2015National basic fee paid 
26.01.2015Designation fee(s) paid 
26.01.2015Examination fee paid 
Examination procedure26.01.2015Examination requested  [2015/18]
10.02.2015Amendment by applicant (claims and/or description)
01.04.2019Despatch of a communication from the examining division (Time limit: M04)
01.07.2019Reply to a communication from the examining division
12.09.2019Communication of intention to grant the patent
27.12.2019Receipt of the translation of the claim(s)
02.01.2020Fee for grant paid
02.01.2020Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.04.2019
Opposition(s)13.11.2020No opposition filed within time limit [2021/03]
Fees paidRenewal fee
30.06.2015Renewal fee patent year 03
06.07.2016Renewal fee patent year 04
30.06.2017Renewal fee patent year 05
02.07.2018Renewal fee patent year 06
01.07.2019Renewal fee patent year 07
Penalty fee
Additional fee for renewal fee
30.06.201604   M06   Fee paid on   30.12.2016
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.06.2013
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MK12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
[2022/31]
Former [2022/30]HU24.06.2013
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
Former [2022/27]HU24.06.2013
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
Former [2022/26]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
Former [2021/24]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
Former [2021/20]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
IE24.06.2020
LU24.06.2020
CH30.06.2020
LI30.06.2020
PT05.07.2020
Former [2021/15]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
LU24.06.2020
PT05.07.2020
Former [2021/11]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/50]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/49]CZ12.02.2020
DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/48]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/47]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/45]FI12.02.2020
HR12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/40]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/39]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
Former [2020/38]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
GR13.05.2020
Former [2020/37]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
Former [2020/35]FI12.02.2020
NO12.05.2020
Cited inInternational search[X] DE1766129  (ROWENTA METALLWARENFAB GMBH et al.) [X] 1,2,7,8,11,13-15 * page 4, lines 2-7; figure 1 *
 [X] GB2256652  (ROWENTA WERKE GMBH et al.) [X] 1,7,8,13-15 * page 3, lines 22-27; figure 1 *
 [A] WO2011076546  (BSH BOSCH SIEMENS HAUSGERAETE et al.) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.