EP2888889 - CHANNEL BONDING FOR ETHERNET PASSIVE OPTICAL NETWORK OVER COAX (EPOC) NETWORKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 21.02.2020 | ||
Former | Grant of patent is intended Status updated on 10.10.2019 | ||
Former | Examination is in progress Status updated on 04.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Avago Technologies International Sales Pte. Limited 1 Yishun Avenue 7 Singapore 768923 / SG | [2018/52] |
Former [2017/35] | For all designated states Avago Technologies General IP (Singapore) Pte. Ltd. 1 Yishun Avenue 7 Singapore 768923 / SG | ||
Former [2015/27] | For all designated states Broadcom Corporation 5300 California Avenue Irvine, CA 92617 / US | Inventor(s) | 01 /
BOYD, Edward, Wayne 1806 Pembridge Street Petaluma, CA 94954 / US | 02 /
LAUBACH, Mark, E. 952 7th Avenue Redwood City, CA 94063 / US | [2015/27] | Representative(s) | Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstraße 13 80639 München / DE | [2020/13] |
Former [2015/27] | Jehle, Volker Armin Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13 80639 München / DE | Application number, filing date | 13760163.9 | 23.08.2013 | [2020/13] | WO2013US56447 | Priority number, date | US201261693179P | 24.08.2012 Original published format: US 201261693179 P | US201261702104P | 17.09.2012 Original published format: US 201261702104 P | US201261702113P | 17.09.2012 Original published format: US 201261702113 P | [2015/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014031992 | Date: | 27.02.2014 | Language: | EN | [2014/09] | Type: | A2 Application without search report | No.: | EP2888889 | Date: | 01.07.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.02.2014 takes the place of the publication of the European patent application. | [2015/27] | Type: | B1 Patent specification | No.: | EP2888889 | Date: | 25.03.2020 | Language: | EN | [2020/13] | Search report(s) | International search report - published on: | EP | 17.04.2014 | Classification | IPC: | H04Q11/00, H04L12/28 | [2015/27] | CPC: |
H04L5/0046 (EP,US);
H04B10/27 (US);
H04B10/516 (US);
H04L27/2627 (US);
H04L27/36 (US);
H04Q11/0067 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KANALBINDUNG FÜR NETZWERKE MIT ETHERNETBASIERTEM, PASSIVEM OPTISCHEM NETZ ÜBER KOAXIALKABEL (EPOC) | [2015/27] | English: | CHANNEL BONDING FOR ETHERNET PASSIVE OPTICAL NETWORK OVER COAX (EPOC) NETWORKS | [2015/27] | French: | LIAISON DE CANAL POUR UN RÉSEAU OPTIQUE PASSIF ETHERNET SUR CÂBLE COAXIAL (EPOC) | [2015/27] | Entry into regional phase | 24.03.2015 | National basic fee paid | 24.03.2015 | Designation fee(s) paid | 05.01.2015 | Examination fee paid | Examination procedure | 05.01.2015 | Examination requested [2015/27] | 13.10.2015 | Amendment by applicant (claims and/or description) | 04.11.2016 | Despatch of a communication from the examining division (Time limit: M06) | 15.05.2017 | Reply to a communication from the examining division | 18.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 06.02.2018 | Reply to a communication from the examining division | 18.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 08.03.2019 | Reply to a communication from the examining division | 11.10.2019 | Communication of intention to grant the patent | 11.02.2020 | Fee for grant paid | 11.02.2020 | Fee for publishing/printing paid | 11.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.11.2016 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 31.08.2015 | Renewal fee patent year 03 | 31.08.2016 | Renewal fee patent year 04 | 31.08.2017 | Renewal fee patent year 05 | 31.08.2018 | Renewal fee patent year 06 | 02.09.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.08.2013 | AL | 25.03.2020 | AT | 25.03.2020 | CY | 25.03.2020 | CZ | 25.03.2020 | DK | 25.03.2020 | EE | 25.03.2020 | ES | 25.03.2020 | FI | 25.03.2020 | HR | 25.03.2020 | IT | 25.03.2020 | LT | 25.03.2020 | LV | 25.03.2020 | MC | 25.03.2020 | MK | 25.03.2020 | MT | 25.03.2020 | NL | 25.03.2020 | PL | 25.03.2020 | RO | 25.03.2020 | RS | 25.03.2020 | SE | 25.03.2020 | SI | 25.03.2020 | SK | 25.03.2020 | SM | 25.03.2020 | TR | 25.03.2020 | BG | 25.06.2020 | NO | 25.06.2020 | GR | 26.06.2020 | IS | 25.07.2020 | PT | 18.08.2020 | GB | 23.08.2020 | IE | 23.08.2020 | LU | 23.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | FR | 31.08.2020 | LI | 31.08.2020 | [2022/31] |
Former [2022/30] | HU | 23.08.2013 | |
AL | 25.03.2020 | ||
AT | 25.03.2020 | ||
CY | 25.03.2020 | ||
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 23.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2022/27] | HU | 23.08.2013 | |
AT | 25.03.2020 | ||
CY | 25.03.2020 | ||
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
MT | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 23.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2022/26] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
TR | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 23.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/38] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 23.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
IE | 23.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
LU | 23.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/35] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
LU | 23.08.2020 | ||
CH | 31.08.2020 | ||
FR | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/24] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
LU | 23.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
LU | 23.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/10] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
PL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/09] | AT | 25.03.2020 | |
CZ | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/08] | CZ | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
ES | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/50] | CZ | 25.03.2020 | |
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/49] | CZ | 25.03.2020 | |
FI | 25.03.2020 | ||
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/48] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
SM | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/47] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LT | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/46] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/45] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
NL | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/39] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/38] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
NO | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/37] | FI | 25.03.2020 | |
HR | 25.03.2020 | ||
LV | 25.03.2020 | ||
RS | 25.03.2020 | ||
SE | 25.03.2020 | ||
NO | 25.06.2020 | ||
Former [2020/35] | FI | 25.03.2020 | |
NO | 25.06.2020 | Cited in | International search | [Y]EP2073426 (INFINEON TECHNOLOGIES AG [DE]) [Y] 1-20 * abstract * * paragraph [0009] - paragraph [0019] *; | [Y]US2011007731 (TSATSANIS MICHAIL [US], et al) [Y] 13-15 * abstract * * paragraph [0002] - paragraph [0013] *; | [XP]EP2624588 (BROADCOM CORP [US]) [XP] 1-20 * the whole document *; | [E]WO2013134509 (HUAWEI TECH CO LTD [CN], et al) [E] 1-20 * the whole document *; | [Y] - "EPoC (Ethernet PON over Coax): Architecture, MPCP, and DBA ; mukherjee_01_0312", IEEE DRAFT; MUKHERJEE_01_0312, IEEE-SA, PISCATAWAY, NJ USA, (20120504), vol. 802.3.epoc, pages 1 - 21, XP068021229 [Y] 1-20 * the whole document * | [XP] - PATRICK STUPAR ET AL, "EPoC Feature Matrix and Specification Impact ; stupar_01_1112", IEEE DRAFT; STUPAR_01_1112, IEEE-SA, PISCATAWAY, NJ USA, (20121114), vol. 802.3bn, pages 1 - 18, XP068047392 [XP] 1-20 * the whole document * | by applicant | US20100878643 |