blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2888889

EP2888889 - CHANNEL BONDING FOR ETHERNET PASSIVE OPTICAL NETWORK OVER COAX (EPOC) NETWORKS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 17.07.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  10.10.2019
FormerExamination is in progress
Status updated on  04.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Avago Technologies International Sales Pte. Limited
1 Yishun Avenue 7
Singapore 768923 / SG
[2018/52]
Former [2017/35]For all designated states
Avago Technologies General IP (Singapore) Pte. Ltd.
1 Yishun Avenue 7
Singapore 768923 / SG
Former [2015/27]For all designated states
Broadcom Corporation
5300 California Avenue
Irvine, CA 92617 / US
Inventor(s)01 / BOYD, Edward, Wayne
1806 Pembridge Street
Petaluma, CA 94954 / US
02 / LAUBACH, Mark, E.
952 7th Avenue
Redwood City, CA 94063 / US
 [2015/27]
Representative(s)Bosch Jehle Patentanwaltsgesellschaft mbH
Flüggenstraße 13
80639 München / DE
[2020/13]
Former [2015/27]Jehle, Volker Armin
Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13
80639 München / DE
Application number, filing date13760163.923.08.2013
[2020/13]
WO2013US56447
Priority number, dateUS201261693179P24.08.2012         Original published format: US 201261693179 P
US201261702104P17.09.2012         Original published format: US 201261702104 P
US201261702113P17.09.2012         Original published format: US 201261702113 P
[2015/27]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2014031992
Date:27.02.2014
Language:EN
[2014/09]
Type: A2 Application without search report 
No.:EP2888889
Date:01.07.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 27.02.2014 takes the place of the publication of the European patent application.
[2015/27]
Type: B1 Patent specification 
No.:EP2888889
Date:25.03.2020
Language:EN
[2020/13]
Search report(s)International search report - published on:EP17.04.2014
ClassificationIPC:H04Q11/00, H04L12/28
[2015/27]
CPC:
H04L5/0046 (EP,US); H04B10/27 (US); H04B10/516 (US);
H04L27/2627 (US); H04L27/36 (US); H04Q11/0067 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/27]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:KANALBINDUNG FÜR NETZWERKE MIT ETHERNETBASIERTEM, PASSIVEM OPTISCHEM NETZ ÜBER KOAXIALKABEL (EPOC)[2015/27]
English:CHANNEL BONDING FOR ETHERNET PASSIVE OPTICAL NETWORK OVER COAX (EPOC) NETWORKS[2015/27]
French:LIAISON DE CANAL POUR UN RÉSEAU OPTIQUE PASSIF ETHERNET SUR CÂBLE COAXIAL (EPOC)[2015/27]
Entry into regional phase24.03.2015National basic fee paid 
24.03.2015Designation fee(s) paid 
05.01.2015Examination fee paid 
Examination procedure05.01.2015Examination requested  [2015/27]
13.10.2015Amendment by applicant (claims and/or description)
04.11.2016Despatch of a communication from the examining division (Time limit: M06)
15.05.2017Reply to a communication from the examining division
18.10.2017Despatch of a communication from the examining division (Time limit: M04)
06.02.2018Reply to a communication from the examining division
18.02.2019Despatch of a communication from the examining division (Time limit: M04)
08.03.2019Reply to a communication from the examining division
11.10.2019Communication of intention to grant the patent
11.02.2020Fee for grant paid
11.02.2020Fee for publishing/printing paid
11.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2016
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
31.08.2015Renewal fee patent year 03
31.08.2016Renewal fee patent year 04
31.08.2017Renewal fee patent year 05
31.08.2018Renewal fee patent year 06
02.09.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.08.2013
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
GB23.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
[2022/31]
Former [2022/30]HU23.08.2013
AL25.03.2020
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
GB23.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2022/27]HU23.08.2013
AT25.03.2020
CY25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
GB23.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2022/26]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
GB23.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/38]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
GB23.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/37]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE23.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/36]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU23.08.2020
BE31.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/35]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU23.08.2020
CH31.08.2020
FR31.08.2020
LI31.08.2020
Former [2021/24]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU23.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/20]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU23.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/18]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]AT25.03.2020
CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]CZ25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]CZ25.03.2020
EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]CZ25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/45]FI25.03.2020
HR25.03.2020
LV25.03.2020
NL25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Cited inInternational search[Y]EP2073426  (INFINEON TECHNOLOGIES AG [DE]) [Y] 1-20 * abstract * * paragraph [0009] - paragraph [0019] *;
 [Y]US2011007731  (TSATSANIS MICHAIL [US], et al) [Y] 13-15 * abstract * * paragraph [0002] - paragraph [0013] *;
 [XP]EP2624588  (BROADCOM CORP [US]) [XP] 1-20 * the whole document *;
 [E]WO2013134509  (HUAWEI TECH CO LTD [CN], et al) [E] 1-20 * the whole document *;
 [Y]  - "EPoC (Ethernet PON over Coax): Architecture, MPCP, and DBA ; mukherjee_01_0312", IEEE DRAFT; MUKHERJEE_01_0312, IEEE-SA, PISCATAWAY, NJ USA, (20120504), vol. 802.3.epoc, pages 1 - 21, XP068021229 [Y] 1-20 * the whole document *
 [XP]  - PATRICK STUPAR ET AL, "EPoC Feature Matrix and Specification Impact ; stupar_01_1112", IEEE DRAFT; STUPAR_01_1112, IEEE-SA, PISCATAWAY, NJ USA, (20121114), vol. 802.3bn, pages 1 - 18, XP068047392 [XP] 1-20 * the whole document *
by applicantUS20100878643
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.