EP2890468 - APPARATUS AND METHOD FOR PARALLEL ACCELERATED SOLVENT EXTRACTION [Right-click to bookmark this link] | |||
Former [2015/28] | APPARATUS FOR PARALLEL ACCELERATED SOLVENT EXTRACTION | ||
[2019/29] | Status | No opposition filed within time limit Status updated on 23.10.2020 Database last updated on 21.01.2025 | |
Former | The patent has been granted Status updated on 15.11.2019 | ||
Former | Grant of patent is intended Status updated on 04.07.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Dionex Corporation 445 Lakeside Dr. Sunnyvale, CA 94085 / US | [2015/28] | Inventor(s) | 01 /
SRINIVASAN, Kannan 2101 Cabana Lane Tracy, CA 95377 / US | 02 /
ULLAH, SM Rahmat 235 Yampa Way Fremont, CA 94539 / US | [2015/28] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2019/51] |
Former [2015/28] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 13765830.8 | 30.08.2013 | [2019/51] | WO2013US57473 | Priority number, date | US201213599837 | 30.08.2012 Original published format: US201213599837 | US201313765948 | 13.02.2013 Original published format: US201313765948 | [2015/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014036378 | Date: | 06.03.2014 | Language: | EN | [2014/10] | Type: | A1 Application with search report | No.: | EP2890468 | Date: | 08.07.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.03.2014 takes the place of the publication of the European patent application. | [2015/28] | Type: | B1 Patent specification | No.: | EP2890468 | Date: | 18.12.2019 | Language: | EN | [2019/51] | Search report(s) | International search report - published on: | EP | 06.03.2014 | Classification | IPC: | G01N30/08, B01D11/02, G01N1/34 | [2019/29] | CPC: |
B01D11/0207 (EP);
B01D11/0219 (EP);
B01D11/0284 (EP);
G01N1/34 (EP);
G01N2030/085 (EP)
|
Former IPC [2015/28] | B01D11/02, G01N1/34 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN FÜR PARALLELE BESCHLEUNIGTE LÖSUNGSMITTELEXTRAKTION | [2019/29] | English: | APPARATUS AND METHOD FOR PARALLEL ACCELERATED SOLVENT EXTRACTION | [2019/29] | French: | APPAREIL ET MÉTHODE POUR CO-EXTRACTION ACCÉLÉRÉE PAR SOLVANTS | [2019/29] |
Former [2015/28] | VORRICHTUNG FÜR PARALLELE BESCHLEUNIGTE LÖSUNGSMITTELEXTRAKTION | ||
Former [2015/28] | APPARATUS FOR PARALLEL ACCELERATED SOLVENT EXTRACTION | ||
Former [2015/28] | APPAREIL POUR CO-EXTRACTION ACCÉLÉRÉE PAR SOLVANTS | Entry into regional phase | 27.02.2015 | National basic fee paid | 27.02.2015 | Designation fee(s) paid | 27.02.2015 | Examination fee paid | Examination procedure | 27.02.2015 | Examination requested [2015/28] | 23.10.2015 | Amendment by applicant (claims and/or description) | 05.07.2019 | Communication of intention to grant the patent | 05.11.2019 | Fee for grant paid | 05.11.2019 | Fee for publishing/printing paid | 05.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.07.2019 | Opposition(s) | 21.09.2020 | No opposition filed within time limit [2020/48] | Fees paid | Renewal fee | 10.08.2015 | Renewal fee patent year 03 | 11.08.2016 | Renewal fee patent year 04 | 14.08.2017 | Renewal fee patent year 05 | 10.08.2018 | Renewal fee patent year 06 | 15.08.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.08.2013 | AL | 18.12.2019 | AT | 18.12.2019 | CY | 18.12.2019 | CZ | 18.12.2019 | DK | 18.12.2019 | EE | 18.12.2019 | FI | 18.12.2019 | HR | 18.12.2019 | LT | 18.12.2019 | LV | 18.12.2019 | MC | 18.12.2019 | MK | 18.12.2019 | MT | 18.12.2019 | NL | 18.12.2019 | PL | 18.12.2019 | RO | 18.12.2019 | RS | 18.12.2019 | SE | 18.12.2019 | SI | 18.12.2019 | SK | 18.12.2019 | SM | 18.12.2019 | TR | 18.12.2019 | BG | 18.03.2020 | NO | 18.03.2020 | GR | 19.03.2020 | IS | 18.04.2020 | PT | 13.05.2020 | IE | 30.08.2020 | LU | 30.08.2020 | BE | 31.08.2020 | [2022/32] |
Former [2022/27] | HU | 30.08.2013 | |
AL | 18.12.2019 | ||
AT | 18.12.2019 | ||
CY | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
MT | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
TR | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
IE | 30.08.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
Former [2022/26] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
TR | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
IE | 30.08.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
Former [2021/37] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
IE | 30.08.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
Former [2021/36] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
Former [2021/20] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
LU | 30.08.2020 | ||
Former [2021/18] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/14] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/51] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/47] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/40] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/37] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/36] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/35] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/32] | AL | 18.12.2019 | |
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/25] | FI | 18.12.2019 | |
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/23] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/22] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
Former [2020/21] | NO | 18.03.2020 | Cited in | International search | [XI]US5147538 (WRIGHT BOB W [US], et al) [X] 12,13,15-17 * column 3, line 7 - line 9; figure 1 * * column 2, line 59 - line 61 *[I] 1,2,4,5,7; | [XI]US5472612 (MAXWELL ROBERT J [US]) [X] 1,3,5-8,11,12,14,15,17-20 * figures 1-3 * [I] 2; | [XI]WO9625213 (SUPREX CORP [US]) [X] 12,15,17-19 * figures 1,12 * [I] 1,2,5,7-11 |