EP2897482 - SOLE STRUCTURES AND ARTICLES OF FOOTWEAR HAVING PLATE MODERATED FLUID-FILLED BLADDERS AND/OR FOAM TYPE IMPACT FORCE ATTENUATION MEMBERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2019 Database last updated on 26.12.2024 | |
Former | The patent has been granted Status updated on 28.09.2018 | ||
Former | Grant of patent is intended Status updated on 22.09.2018 | ||
Former | Examination is in progress Status updated on 31.08.2018 | ||
Former | Grant of patent is intended Status updated on 28.08.2018 | ||
Former | Examination is in progress Status updated on 21.08.2018 | ||
Former | Grant of patent is intended Status updated on 10.04.2018 | ||
Former | Examination is in progress Status updated on 16.06.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states NIKE Innovate C.V. One Bowerman Drive Beaverton, OR 97005-6453 / US | [2015/31] | Inventor(s) | 01 /
BRUCE, Robert M. c/o NIKE, INC. One Bowerman Drive Beaverton, OR 97005-6453 / US | 02 /
HEARD, Joshua P. c/o NIKE, INC. One Bowerman Drive Beaverton, OR 97005-6453 / US | [2015/31] | Representative(s) | Tombling, Adrian George, et al Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
Former [2015/31] | Tombling, Adrian George, et al Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | Application number, filing date | 13765902.5 | 11.09.2013 | [2018/44] | WO2013US59268 | Priority number, date | US201213623722 | 20.09.2012 Original published format: US201213623722 | [2015/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014046940 | Date: | 27.03.2014 | Language: | EN | [2014/13] | Type: | A1 Application with search report | No.: | EP2897482 | Date: | 29.07.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.03.2014 takes the place of the publication of the European patent application. | [2015/31] | Type: | B1 Patent specification | No.: | EP2897482 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Search report(s) | International search report - published on: | EP | 27.03.2014 | Classification | IPC: | A43B7/14, A43B13/16, A43B13/18, A43B13/20, A43B13/38 | [2015/31] | CPC: |
A43B13/20 (EP,CN,US);
A43B13/122 (CN);
A43B13/026 (EP,US);
A43B13/04 (US);
A43B13/12 (US);
A43B13/125 (CN);
A43B13/16 (EP,US);
A43B13/18 (CN);
A43B13/181 (EP,US);
A43B13/186 (US);
A43B13/187 (EP,US);
A43B13/188 (US);
A43B13/189 (EP,US);
A43B13/38 (EP,US);
A43B13/383 (EP,US);
A43B5/00 (CN);
A43B7/1425 (EP,US);
A43B7/1435 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SOHLENSTRUKTUREN UND SCHUHARTIKEL MIT PLATTENGEDÄMPFTEN FLÜSSIGKEITSGEFÜLLTEN BLASEN UND/ODER STOSSDÄMPFUNGSELEMENTEN AUS SCHAUMSTOFF | [2015/31] | English: | SOLE STRUCTURES AND ARTICLES OF FOOTWEAR HAVING PLATE MODERATED FLUID-FILLED BLADDERS AND/OR FOAM TYPE IMPACT FORCE ATTENUATION MEMBERS | [2015/31] | French: | STRUCTURES DE SEMELLE ET ARTICLES CHAUSSANTS DOTÉS D'ÉLÉMENTS D'ATTÉNUATION DE LA FORCE DE CHOC EN MOUSSE ET/OU DE VESSIES REMPLIES DE FLUIDE MODÉRÉS PAR UNE OU PLUSIEURS PLAQUES | [2015/31] | Entry into regional phase | 10.04.2015 | National basic fee paid | 10.04.2015 | Designation fee(s) paid | 10.04.2015 | Examination fee paid | Examination procedure | 10.04.2015 | Examination requested [2015/31] | 13.11.2015 | Amendment by applicant (claims and/or description) | 14.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 21.12.2017 | Reply to a communication from the examining division | 11.04.2018 | Communication of intention to grant the patent | 20.08.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 20.08.2018 | Fee for grant paid | 20.08.2018 | Fee for publishing/printing paid | 21.09.2018 | Information about intention to grant a patent | 21.09.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18194214.5 / EP3430933 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.06.2017 | Opposition(s) | 01.08.2019 | No opposition filed within time limit [2019/41] | Fees paid | Renewal fee | 09.09.2015 | Renewal fee patent year 03 | 13.09.2016 | Renewal fee patent year 04 | 12.09.2017 | Renewal fee patent year 05 | 11.09.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.09.2013 | AL | 31.10.2018 | AT | 31.10.2018 | CY | 31.10.2018 | CZ | 31.10.2018 | DK | 31.10.2018 | EE | 31.10.2018 | FI | 31.10.2018 | HR | 31.10.2018 | LT | 31.10.2018 | LV | 31.10.2018 | MC | 31.10.2018 | MK | 31.10.2018 | MT | 31.10.2018 | NL | 31.10.2018 | PL | 31.10.2018 | RO | 31.10.2018 | RS | 31.10.2018 | SE | 31.10.2018 | SI | 31.10.2018 | SK | 31.10.2018 | SM | 31.10.2018 | TR | 31.10.2018 | BG | 31.01.2019 | NO | 31.01.2019 | GR | 01.02.2019 | IS | 28.02.2019 | PT | 01.03.2019 | [2022/31] |
Former [2021/34] | HU | 11.09.2013 | |
AL | 31.10.2018 | ||
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
MT | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2021/32] | HU | 11.09.2013 | |
AL | 31.10.2018 | ||
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2021/26] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CY | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/25] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/17] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/50] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/40] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/37] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/35] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/34] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/26] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/25] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/24] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/23] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/22] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/21] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/20] | LT | 31.10.2018 | |
NO | 31.01.2019 | Cited in | International search | [A]US6018889 (FRITON MICHAEL RAY [US]) [A] 1* column 5, lines 25-35; figures 2,14 *; | [I]US2005283999 (WHATLEY IAN [US]) [I] 1,2,4-7 * paragraphs [0034] , [0035] , [0038] , [0053]; figures 2,3 *; | [XI]US7020988 (HOLDEN LENNY M [US], et al) [X] 1-5 * column 4, lines 45-50,66; figures 2,5a-5c * * column 7, lines 3,12-17,25,26 * [I] 6,7 |