EP2896265 - SYSTEM ENHANCEMENTS FOR ENABLING NON-3GPP OFFLOAD IN 3GPP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 16.03.2020 | ||
Former | Examination is in progress Status updated on 05.01.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway, Suite 300 Wilmington, 19809 / US | [N/P] |
Former [2020/36] | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway, Suite 300 Wilmington, DE 19809 / US | ||
Former [2015/30] | For all designated states Interdigital Patent Holdings, Inc. 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | Inventor(s) | 01 /
WATFA, Mahmoud 7162 De Pontoise Saint Leonard, Québec H1S 2B3 / CA | 02 /
WANG, Guanzhou 3665 Croissant des Caryers Brossard, Québec J4Z 3S7 / CA | 03 /
AHMAD, Saad 350 Prince Arthur Apartment 309 Montreal, Québec H2X 3R4 / CA | 04 /
ADJAKPLE, Pascal M. 67 Red Brook Road Great Neck, New York 11024 / US | 05 /
OLVERA-HERNANDEZ, Ulises 2 Rolland Laniel Kirkland, Québec H9J 4A5 / CA | [2015/30] | Representative(s) | AWA Sweden AB Box 45086 104 30 Stockholm / SE | [N/P] |
Former [2020/36] | AWA Sweden AB P.O. Box 45086 104 30 Stockholm / SE | ||
Former [2015/30] | Badel, Xavier Claude Yves Awapatent AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 13770585.1 | 13.09.2013 | [2020/36] | WO2013US59696 | Priority number, date | US201261701262P | 14.09.2012 Original published format: US 201261701262 P | [2015/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014043494 | Date: | 20.03.2014 | Language: | EN | [2014/12] | Type: | A1 Application with search report | No.: | EP2896265 | Date: | 22.07.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.03.2014 takes the place of the publication of the European patent application. | [2015/30] | Type: | B1 Patent specification | No.: | EP2896265 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Search report(s) | International search report - published on: | EP | 20.03.2014 | Classification | IPC: | H04W76/15, // H04W92/04, H04W92/20 | [2020/09] | CPC: |
H04W76/15 (EP,CN,IL,US);
H04L63/0485 (IL,US);
H04W28/0865 (KR);
H04W28/082 (KR);
H04W28/0831 (KR);
H04W8/20 (KR);
|
Former IPC [2015/30] | H04W76/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEMVERBESSERUNGEN ZUR AKTIVIERUNG EINER NICHT-3GPP-AUSGABE IN 3GPP | [2015/30] | English: | SYSTEM ENHANCEMENTS FOR ENABLING NON-3GPP OFFLOAD IN 3GPP | [2015/30] | French: | PERFECTIONNEMENTS APPORTÉS À UN SYSTÈME POUR PERMETTRE LE TRANSFERT NON 3GPP DANS LE 3GPP | [2015/30] | Entry into regional phase | 19.03.2015 | National basic fee paid | 19.03.2015 | Designation fee(s) paid | 19.03.2015 | Examination fee paid | Examination procedure | 14.07.2014 | Request for preliminary examination filed International Preliminary Examining Authority: US | 19.03.2015 | Examination requested [2015/30] | 04.11.2015 | Amendment by applicant (claims and/or description) | 05.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.05.2018 | Reply to a communication from the examining division | 10.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2018 | Reply to a communication from the examining division | 12.04.2019 | Despatch of a communication from the examining division (Time limit: M06) | 10.10.2019 | Reply to a communication from the examining division | 17.03.2020 | Communication of intention to grant the patent | 24.07.2020 | Fee for grant paid | 24.07.2020 | Fee for publishing/printing paid | 24.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20193583.0 / EP3764731 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.01.2018 | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 28.09.2015 | Renewal fee patent year 03 | 23.09.2016 | Renewal fee patent year 04 | 22.09.2017 | Renewal fee patent year 05 | 21.09.2018 | Renewal fee patent year 06 | 27.09.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.09.2013 | AL | 02.09.2020 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | MT | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | TR | 02.09.2020 | IE | 13.09.2020 | LU | 13.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | BG | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | [2022/32] |
Former [2022/27] | HU | 13.09.2013 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MT | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
IE | 13.09.2020 | ||
LU | 13.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2022/26] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
TR | 02.09.2020 | ||
IE | 13.09.2020 | ||
LU | 13.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
IE | 13.09.2020 | ||
LU | 13.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
IE | 13.09.2020 | ||
LU | 13.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
LU | 13.09.2020 | ||
BE | 30.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/31] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
LU | 13.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
LU | 13.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/27] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
LU | 13.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/24] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/23] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Cited in | International search | [A]WO2011069119 (QUALCOMM INC [US], et al) [A] 1-15 * paragraph [0059] - paragraph [0066] * * paragraph [0087] - paragraph [0088] * * figures 2, 7 *; | [XA] - SAVIO DIMATTEO ET AL, "Cellular Traffic Offloading through WiFi Networks", MOBILE ADHOC AND SENSOR SYSTEMS (MASS), 2011 IEEE 8TH INTERNATIONAL CONFERENCE ON, IEEE, (20111017), doi:10.1109/MASS.2011.26, ISBN 978-1-4577-1345-3, pages 192 - 201, XP032021865 [X] 1-4,9-12 * abstract * * page 193, paragraph II.C - page 194, paragraph III.A * * figure 2 * [A] 5-8,13-15 DOI: http://dx.doi.org/10.1109/MASS.2011.26 | [A] - JOHN L TOMICI ET AL, "Multi-RAT traffic offloading solutions for the bandwidth crunch problem", SYSTEMS, APPLICATIONS AND TECHNOLOGY CONFERENCE (LISAT), 2011 IEEE LONG ISLAND, IEEE, (20110506), doi:10.1109/LISAT.2011.5784243, ISBN 978-1-4244-9878-9, pages 1 - 6, XP031880722 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1109/LISAT.2011.5784243 | Examination | US2012189016 | - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Network based IP flow mobility (Release 12)", 3GPP STANDARD; 3GPP TR 23.861, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120827), vol. SA WG2, no. V1.5.0, pages 1 - 49, XP050649034 | - NEC, "Clarification on the association of PDN connections with SIPTO permissions", 3GPP DRAFT; S2-112746-WAS-S2-112366_SIPTO-CLARIFICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110517), vol. SA WG2, no. Xi'An; 20110516, XP050525615 |