EP2906411 - PRODUCTION METHOD OF A ONE PIECE CONNECTING ROD [Right-click to bookmark this link] | |||
Former [2015/34] | ONE PIECE CONNECTING ROD AND PRODUCTION METHOD THEREOF | ||
[2018/11] | Status | No opposition filed within time limit Status updated on 10.05.2019 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 01.06.2018 | ||
Former | Grant of patent is intended Status updated on 20.02.2018 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states BD Invent SA Rue Boyou 46 4682 Heure-Le-Romain / BE | [2015/34] | Inventor(s) | 01 /
BOVEROUX, Benoît Avenue de Juprelle 43 B-4000 Rocourt / BE | 02 /
DARDENNE, Daniel Rue Boyou 44 B-4682 Heure-Le-Romain / BE | [2015/34] | Representative(s) | Pronovem Office Van Malderen Parc d'affaires Zénobe Gramme- bâtiment K Square des Conduites d'Eau 1-2 4020 Liège / BE | [2015/34] | Application number, filing date | 13776780.2 | 10.10.2013 | [2015/34] | WO2013EP71205 | Priority number, date | BE20120000688 | 11.10.2012 Original published format: BE 201200688 | [2015/34] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014057058 | Date: | 17.04.2014 | Language: | FR | [2014/16] | Type: | A1 Application with search report | No.: | EP2906411 | Date: | 19.08.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 17.04.2014 takes the place of the publication of the European patent application. | [2015/34] | Type: | B1 Patent specification | No.: | EP2906411 | Date: | 04.07.2018 | Language: | FR | [2018/27] | Search report(s) | International search report - published on: | EP | 17.04.2014 | Classification | IPC: | B29C70/32, F16C7/02, B29L31/06, B29C53/60 | [2015/34] | CPC: |
F16C7/026 (EP,CN,US);
B29C70/32 (EP,CN,RU,US);
B29C70/302 (EP,CN,RU,US);
B29C70/86 (EP,US);
B29C53/60 (EP,CN,US);
B29C70/545 (EP,CN,US);
B29K2063/00 (US);
B29K2105/0872 (US);
B29K2307/04 (US);
B29L2031/06 (EP,CN,US);
B29L2031/748 (US);
Y02T50/40 (EP,US);
Y10T74/2152 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HERSTELLUNGSVERFAHREN FÜR EINE EINSTÜCKIGE PLEUELSTANGE | [2018/11] | English: | PRODUCTION METHOD OF A ONE PIECE CONNECTING ROD | [2018/11] | French: | PROCEDE DE FABRICATION D'UNE BIELLE MONOBLOC | [2018/11] |
Former [2015/34] | EINSTÜCKIGE PLEUELSTANGE UND HERSTELLUNGSVERFAHREN DAFÜR | ||
Former [2015/34] | ONE PIECE CONNECTING ROD AND PRODUCTION METHOD THEREOF | ||
Former [2015/34] | BIELLE MONOBLOC ET SON PROCEDE DE FABRICATION | Entry into regional phase | 23.03.2015 | National basic fee paid | 23.03.2015 | Designation fee(s) paid | 23.03.2015 | Examination fee paid | Examination procedure | 23.03.2015 | Examination requested [2015/34] | 24.11.2015 | Amendment by applicant (claims and/or description) | 14.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 06.06.2017 | Reply to a communication from the examining division | 21.02.2018 | Communication of intention to grant the patent | 22.05.2018 | Fee for grant paid | 22.05.2018 | Fee for publishing/printing paid | 22.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.02.2017 | Opposition(s) | 05.04.2019 | No opposition filed within time limit [2019/24] | Fees paid | Renewal fee | 26.10.2015 | Renewal fee patent year 03 | 25.10.2016 | Renewal fee patent year 04 | 23.10.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.10.2013 | AL | 04.07.2018 | AT | 04.07.2018 | CY | 04.07.2018 | CZ | 04.07.2018 | DK | 04.07.2018 | EE | 04.07.2018 | ES | 04.07.2018 | FI | 04.07.2018 | HR | 04.07.2018 | LT | 04.07.2018 | LV | 04.07.2018 | MC | 04.07.2018 | MK | 04.07.2018 | MT | 04.07.2018 | NL | 04.07.2018 | PL | 04.07.2018 | PT | 04.07.2018 | RO | 04.07.2018 | RS | 04.07.2018 | SE | 04.07.2018 | SI | 04.07.2018 | SK | 04.07.2018 | SM | 04.07.2018 | TR | 04.07.2018 | BG | 04.10.2018 | NO | 04.10.2018 | GR | 05.10.2018 | IE | 10.10.2018 | LU | 10.10.2018 | IS | 04.11.2018 | [2020/31] |
Former [2020/28] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
MT | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
PT | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SI | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
TR | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IE | 10.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2020/16] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
MT | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SI | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
TR | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IE | 10.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2020/08] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
MT | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SI | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IE | 10.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/48] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SI | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IE | 10.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/37] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SI | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/30] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
LU | 10.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/28] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
MC | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/26] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
DK | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SK | 04.07.2018 | ||
SM | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/24] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
EE | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
SK | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/22] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RO | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/12] | AL | 04.07.2018 | |
AT | 04.07.2018 | ||
CZ | 04.07.2018 | ||
ES | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
LV | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/11] | AT | 04.07.2018 | |
CZ | 04.07.2018 | ||
FI | 04.07.2018 | ||
HR | 04.07.2018 | ||
LT | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/10] | AT | 04.07.2018 | |
CZ | 04.07.2018 | ||
FI | 04.07.2018 | ||
LT | 04.07.2018 | ||
NL | 04.07.2018 | ||
PL | 04.07.2018 | ||
RS | 04.07.2018 | ||
SE | 04.07.2018 | ||
BG | 04.10.2018 | ||
NO | 04.10.2018 | ||
GR | 05.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/08] | FI | 04.07.2018 | |
LT | 04.07.2018 | ||
NL | 04.07.2018 | ||
NO | 04.10.2018 | ||
IS | 04.11.2018 | ||
Former [2019/07] | LT | 04.07.2018 | |
NL | 04.07.2018 | ||
Former [2019/04] | NL | 04.07.2018 | Cited in | International search | [XYI]EP0626250 (AEROSPATIALE [FR]); | [Y]WO2008066606 (BOEING CO [US], et al); | [XY]WO2010084286 (CONSEIL ET TECH [FR], et al); | [YD]WO2010149768 (BD INVENT [BE], et al) | Examination | WO2012017601 | by applicant | EP0626250 | WO2008066606 | WO2010084286 | WO2010149768 |