Extract from the Register of European Patents

EP About this file: EP2904313

EP2904313 - LIGHTING DEVICE, INSERTION AND RECEIVING ELEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.06.2018
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  14.07.2017
FormerGrant of patent is intended
Status updated on  01.03.2017
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Fischer Lighting ApS
Skjulhøj Allé 46
2720 Vanløse / DK
[2015/33]
Inventor(s)01 / ELMVANG, Stig
Hybenvænget 25a
DK-2740 Skovlunde / DK
 [2015/33]
Representative(s)Høiberg P/S
Adelgade 12
1304 Copenhagen K / DK
[2017/33]
Former [2015/33]Høiberg A/S
St. Kongensgade 59 A
1264 Copenhagen K / DK
Application number, filing date13779510.004.10.2013
[2015/33]
WO2013DK50315
Priority number, dateDK2012007061005.10.2012         Original published format: DK 201270610
US201261711411P09.10.2012         Original published format: US 201261711411 P
[2015/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014053145
Date:10.04.2014
Language:EN
[2014/15]
Type: A1 Application with search report 
No.:EP2904313
Date:12.08.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 10.04.2014 takes the place of the publication of the European patent application.
[2015/33]
Type: B1 Patent specification 
No.:EP2904313
Date:16.08.2017
Language:EN
[2017/33]
Search report(s)International search report - published on:EP10.04.2014
ClassificationIPC:F21V17/12, F21V19/02, F21V21/04, F21V23/00, F21S8/02, // F21Y115/10, F21V29/77
[2017/09]
CPC:
F21S8/026 (EP,US); F21S2/005 (US); F21V17/12 (EP,US);
F21V19/0055 (EP,US); F21V19/02 (EP,US); F21V21/043 (EP,US);
F21V23/008 (EP,US); F21V29/773 (EP,US); F21V7/0066 (US);
F21V7/24 (EP,US); F21V7/00 (EP,US); F21Y2115/10 (EP,US) (-)
Former IPC [2015/33]F21V17/12, F21V19/00, F21V19/02, F21V21/04, F21V23/00, F21S8/02, F21Y101/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/33]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:BELEUCHTUNGSVORRICHTUNG SOWIE EINSATZ- UND AUFNAHMEELEMENT[2015/33]
English:LIGHTING DEVICE, INSERTION AND RECEIVING ELEMENT[2015/33]
French:DISPOSITIF D'ÉCLAIRAGE, ÉLÉMENT DE RÉCEPTION ET D'INSERTION[2015/33]
Entry into regional phase29.04.2015National basic fee paid 
29.04.2015Designation fee(s) paid 
29.04.2015Examination fee paid 
Examination procedure04.08.2014Request for preliminary examination filed
International Preliminary Examining Authority: EP
29.04.2015Examination requested  [2015/33]
16.12.2015Amendment by applicant (claims and/or description)
15.06.2016Despatch of a communication from the examining division (Time limit: M04)
25.10.2016Reply to a communication from the examining division
02.03.2017Communication of intention to grant the patent
05.07.2017Fee for grant paid
05.07.2017Fee for publishing/printing paid
05.07.2017Receipt of the translation of the claim(s)
Divisional application(s)EP17167545.7  / EP3242071
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.06.2016
Opposition(s)17.05.2018No opposition filed within time limit [2018/30]
Fees paidRenewal fee
08.10.2015Renewal fee patent year 03
28.10.2016Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.10.2013
AL16.08.2017
CY16.08.2017
CZ16.08.2017
EE16.08.2017
HR16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
MK16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
TR16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
[2020/34]
Former [2020/30]HU04.10.2013
CY16.08.2017
CZ16.08.2017
EE16.08.2017
HR16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
MK16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
TR16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2020/16]HU04.10.2013
CY16.08.2017
CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
MK16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
TR16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2019/51]HU04.10.2013
CY16.08.2017
CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
MK16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2019/47]HU04.10.2013
CY16.08.2017
CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2019/31]HU04.10.2013
CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/43]CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
MT04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/40]CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SI16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/36]CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SK16.08.2017
SM16.08.2017
LU04.10.2017
CH31.10.2017
LI31.10.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/26]CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
MC16.08.2017
RO16.08.2017
RS16.08.2017
SK16.08.2017
SM16.08.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/25]CZ16.08.2017
EE16.08.2017
LT16.08.2017
LV16.08.2017
RO16.08.2017
RS16.08.2017
SK16.08.2017
SM16.08.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/21]CZ16.08.2017
LT16.08.2017
LV16.08.2017
RS16.08.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/12]LT16.08.2017
LV16.08.2017
RS16.08.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/11]LT16.08.2017
RS16.08.2017
BG16.11.2017
GR17.11.2017
IS16.12.2017
Former [2018/07]LT16.08.2017
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.