EP2912423 - DEVICE FOR PROCESSING AN OPTICAL PULSE IN ORDER TO MEASURE THE CONTRAST THEREOF, AND SYSTEM FOR MEASURING THE CONTRAST USING THE DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2017 Database last updated on 02.11.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives 25, Rue Leblanc Bâtiment "Le Ponant D" 75015 Paris / FR | [2016/34] |
Former [2015/36] | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives 25, rue Leblanc Bâtiment "Le Ponant D" 75015 Paris / FR | Inventor(s) | 01 /
DUBERTRAND, Jérôme Lotissement le Barrail F-33380 Mios / FR | [2015/36] | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [N/P] |
Former [2015/36] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 13779599.3 | 22.10.2013 | [2015/36] | WO2013EP72014 | Priority number, date | FR20120060137 | 24.10.2012 Original published format: FR 1260137 | [2015/36] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014064068 | Date: | 01.05.2014 | Language: | FR | [2014/18] | Type: | A1 Application with search report | No.: | EP2912423 | Date: | 02.09.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 01.05.2014 takes the place of the publication of the European patent application. | [2015/36] | Type: | B1 Patent specification | No.: | EP2912423 | Date: | 24.08.2016 | Language: | FR | [2016/34] | Search report(s) | International search report - published on: | EP | 01.05.2014 | Classification | IPC: | G01J11/00 | [2015/36] | CPC: |
G01J11/00 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG ZUR VERARBEITUNG VON OPTISCHEN PULSEN ZUR MESSUNG DES KONTRASTES UND SYSTEM ZUR MESSUNG DES KONTRASTES MIT DER VORRICHTUNG | [2015/36] | English: | DEVICE FOR PROCESSING AN OPTICAL PULSE IN ORDER TO MEASURE THE CONTRAST THEREOF, AND SYSTEM FOR MEASURING THE CONTRAST USING THE DEVICE | [2015/36] | French: | DISPOSITIF DE TRAITEMENT D'UNE IMPULSION OPTIQUE POUR MESURER LE CONTRASTE DE CELLE-CI, ET SYSTÈME DE MESURE DU CONTRASTE UTILISANT LE DISPOSITIF | [2016/14] |
Former [2015/36] | DISPOSITIF DE TRAITEMENT D'UNE IMPULSION OPTIQUE POUR MESURER LE CONTRASTE DE CELLE-CI, ET SYSTEME DE MESURE DU CONTRASTE UTILISANT LE DISPOSITIF | Entry into regional phase | 04.05.2015 | National basic fee paid | 04.05.2015 | Designation fee(s) paid | 04.05.2015 | Examination fee paid | Examination procedure | 04.05.2015 | Examination requested [2015/36] | 02.12.2015 | Amendment by applicant (claims and/or description) | 08.03.2016 | Communication of intention to grant the patent | 04.07.2016 | Fee for grant paid | 04.07.2016 | Fee for publishing/printing paid | 04.07.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.03.2016 | Opposition(s) | 26.05.2017 | No opposition filed within time limit [2017/31] | Fees paid | Renewal fee | 28.09.2015 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 24.08.2016 | AT | 24.08.2016 | CY | 24.08.2016 | DK | 24.08.2016 | EE | 24.08.2016 | ES | 24.08.2016 | FI | 24.08.2016 | HR | 24.08.2016 | IS | 24.08.2016 | IT | 24.08.2016 | LT | 24.08.2016 | LV | 24.08.2016 | MC | 24.08.2016 | MK | 24.08.2016 | MT | 24.08.2016 | NL | 24.08.2016 | PL | 24.08.2016 | RS | 24.08.2016 | SE | 24.08.2016 | SI | 24.08.2016 | SK | 24.08.2016 | SM | 24.08.2016 | TR | 24.08.2016 | IE | 22.10.2016 | LU | 22.10.2016 | BE | 31.10.2016 | CH | 31.10.2016 | LI | 31.10.2016 | BG | 24.11.2016 | NO | 24.11.2016 | GR | 25.11.2016 | PT | 26.12.2016 | [2018/46] |
Former [2018/45] | AT | 24.08.2016 | |
CY | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IS | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
MC | 24.08.2016 | ||
MK | 24.08.2016 | ||
MT | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
TR | 24.08.2016 | ||
IE | 22.10.2016 | ||
LU | 22.10.2016 | ||
BE | 31.10.2016 | ||
CH | 31.10.2016 | ||
LI | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2018/32] | AT | 24.08.2016 | |
CY | 24.08.2016 | ||
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IS | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
MC | 24.08.2016 | ||
MK | 24.08.2016 | ||
MT | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
IE | 22.10.2016 | ||
LU | 22.10.2016 | ||
BE | 31.10.2016 | ||
CH | 31.10.2016 | ||
LI | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/51] | AT | 24.08.2016 | |
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
IE | 22.10.2016 | ||
LU | 22.10.2016 | ||
BE | 31.10.2016 | ||
CH | 31.10.2016 | ||
LI | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/43] | AT | 24.08.2016 | |
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
LU | 22.10.2016 | ||
BE | 31.10.2016 | ||
CH | 31.10.2016 | ||
LI | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/37] | AT | 24.08.2016 | |
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SI | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
BE | 31.10.2016 | ||
CH | 31.10.2016 | ||
LI | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/32] | AT | 24.08.2016 | |
DK | 24.08.2016 | ||
EE | 24.08.2016 | ||
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
NL | 24.08.2016 | ||
PL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
SK | 24.08.2016 | ||
SM | 24.08.2016 | ||
BE | 31.10.2016 | ||
BG | 24.11.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/13] | AT | 24.08.2016 | |
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
LV | 24.08.2016 | ||
NL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
BE | 31.10.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/11] | AT | 24.08.2016 | |
ES | 24.08.2016 | ||
FI | 24.08.2016 | ||
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
BE | 31.10.2016 | ||
NO | 24.11.2016 | ||
GR | 25.11.2016 | ||
PT | 26.12.2016 | ||
Former [2017/10] | FI | 24.08.2016 | |
HR | 24.08.2016 | ||
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
RS | 24.08.2016 | ||
SE | 24.08.2016 | ||
BE | 31.10.2016 | ||
NO | 24.11.2016 | ||
Former [2017/09] | FI | 24.08.2016 | |
IT | 24.08.2016 | ||
LT | 24.08.2016 | ||
NL | 24.08.2016 | ||
NO | 24.11.2016 | ||
Former [2017/07] | LT | 24.08.2016 | Cited in | International search | [A]FR2899328 (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [A] 1-12 * abstract ** page 8, line 11 - page 13, line 27 *; | [A] - DONGFANG ZHANG ET AL, "Fiber-array-based detection scheme for single-shot pulse contrast characterization", OPTICS LETTERS, OSA, OPTICAL SOCIETY OF AMERICA, WASHINGTON, DC, US, (20080901), vol. 33, no. 17, doi:10.1364/OL.33.001969, ISSN 0146-9592, pages 1969 - 1971, XP001516857 [A] 1-12 * abstract * * page 1970, column l, line 14 - page 1971, column l, line 19 * DOI: http://dx.doi.org/10.1364/OL.33.001969 | by applicant | US6320692 | FR2899328 | US8095017 |