EP2906490 - METHOD AND APPARATUS FOR HANDLING GLASS SHEETS OF EXTREME LARGE DIMENSIONS [Right-click to bookmark this link] | |||
Former [2015/34] | METHOD AND DEVICE FOR TURNING LARGE-AREA PANELS IN EXTREME OVERSIZE | ||
[2017/19] | Status | No opposition filed within time limit Status updated on 01.06.2018 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 23.06.2017 | ||
Former | Grant of patent is intended Status updated on 09.05.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Grenzebach Maschinenbau GmbH Albanusstrasse 1-3 86663 Asbach-Baeumenheim / DE | [2015/34] | Inventor(s) | 01 /
HERFERT, Christian Beethovenstrasse 1 86462 Langweid / DE | [2015/34] | Representative(s) | Kindermann, Peter Karl-Böhm-Strasse 1 85598 Baldham / DE | [2015/34] | Application number, filing date | 13786618.2 | 26.09.2013 | [2015/34] | WO2013DE00550 | Priority number, date | DE20121019841 | 09.10.2012 Original published format: DE102012019841 | [2015/34] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014056470 | Date: | 17.04.2014 | Language: | DE | [2014/16] | Type: | A1 Application with search report | No.: | EP2906490 | Date: | 19.08.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.04.2014 takes the place of the publication of the European patent application. | [2015/34] | Type: | B1 Patent specification | No.: | EP2906490 | Date: | 26.07.2017 | Language: | DE | [2017/30] | Search report(s) | International search report - published on: | EP | 17.04.2014 | Classification | IPC: | B65G47/91, B65G47/92, B65G49/06 | [2017/19] | CPC: |
B65G49/067 (EP,US);
B65G47/91 (US);
B65G47/92 (US);
B65G49/068 (EP,US);
B65G2201/022 (EP,US);
B65G2249/045 (EP,US);
B65G47/915 (EP,US)
(-)
|
Former IPC [2015/34] | B65G49/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG FÜR DAS UMSETZEN GROSSFLÄCHIGER PLATTEN IN EXTREMER ÜBERGRÖSSE | [2015/34] | English: | METHOD AND APPARATUS FOR HANDLING GLASS SHEETS OF EXTREME LARGE DIMENSIONS | [2017/19] | French: | MÉTHODE ET APPAREIL DE MANIPULATION DE FEUILLES DE VERRE DE TRÉS GRANDES DIMENSIONS | [2017/19] |
Former [2015/34] | METHOD AND DEVICE FOR TURNING LARGE-AREA PANELS IN EXTREME OVERSIZE | ||
Former [2015/34] | PROCÉDÉ ET DISPOSITIF DE TRANSFERT DE PLAQUES DE GRANDE SURFACE EXTRÊMEMENT SURDIMENSIONNÉES | Entry into regional phase | 14.04.2015 | National basic fee paid | 14.04.2015 | Designation fee(s) paid | 14.04.2015 | Examination fee paid | Examination procedure | 14.04.2015 | Examination requested [2015/34] | 06.07.2015 | Amendment by applicant (claims and/or description) | 01.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 06.09.2016 | Reply to a communication from the examining division | 10.05.2017 | Communication of intention to grant the patent | 12.06.2017 | Fee for grant paid | 12.06.2017 | Fee for publishing/printing paid | 12.06.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.06.2016 | Opposition(s) | 30.04.2018 | No opposition filed within time limit [2018/27] | Fees paid | Renewal fee | 10.09.2015 | Renewal fee patent year 03 | 01.09.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 26.07.2017 | CY | 26.07.2017 | DK | 26.07.2017 | EE | 26.07.2017 | FI | 26.07.2017 | HR | 26.07.2017 | LT | 26.07.2017 | LV | 26.07.2017 | MC | 26.07.2017 | MK | 26.07.2017 | MT | 26.07.2017 | PT | 26.07.2017 | RO | 26.07.2017 | RS | 26.07.2017 | SE | 26.07.2017 | SI | 26.07.2017 | SK | 26.07.2017 | SM | 26.07.2017 | TR | 26.07.2017 | IE | 26.09.2017 | BG | 26.10.2017 | NO | 26.10.2017 | GR | 27.10.2017 | IS | 26.11.2017 | [2020/34] |
Former [2020/28] | CY | 26.07.2017 | |
DK | 26.07.2017 | ||
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
MK | 26.07.2017 | ||
MT | 26.07.2017 | ||
PT | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
TR | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2020/15] | CY | 26.07.2017 | |
DK | 26.07.2017 | ||
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
MK | 26.07.2017 | ||
MT | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
TR | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2019/51] | CY | 26.07.2017 | |
DK | 26.07.2017 | ||
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
MK | 26.07.2017 | ||
MT | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2019/47] | CY | 26.07.2017 | |
DK | 26.07.2017 | ||
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
MT | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/43] | DK | 26.07.2017 | |
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
MT | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/40] | DK | 26.07.2017 | |
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SI | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/35] | DK | 26.07.2017 | |
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
IE | 26.09.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/26] | DK | 26.07.2017 | |
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
MC | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/25] | DK | 26.07.2017 | |
EE | 26.07.2017 | ||
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
RO | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
SK | 26.07.2017 | ||
SM | 26.07.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/21] | DK | 26.07.2017 | |
FI | 26.07.2017 | ||
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/12] | FI | 26.07.2017 | |
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
LV | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/11] | FI | 26.07.2017 | |
HR | 26.07.2017 | ||
LT | 26.07.2017 | ||
RS | 26.07.2017 | ||
SE | 26.07.2017 | ||
BG | 26.10.2017 | ||
NO | 26.10.2017 | ||
GR | 27.10.2017 | ||
IS | 26.11.2017 | ||
Former [2018/09] | FI | 26.07.2017 | |
LT | 26.07.2017 | ||
SE | 26.07.2017 | ||
NO | 26.10.2017 | ||
Former [2018/08] | FI | 26.07.2017 | |
LT | 26.07.2017 | ||
NO | 26.10.2017 | ||
Former [2018/07] | LT | 26.07.2017 | |
NO | 26.10.2017 | Cited in | International search | [Y]US2003062245 (PFEILSCHIFTER THOMAS [DE], et al) [Y] 1-9 * paragraphs [0006] , [0014]; figures 1-2 *; | [Y]US2004240981 (DOTHAN EREZ [IL], et al) [Y] 1-9 * paragraph [0005] * * sentence 1, paragraph 0007 - sentence 6; figures 1-4,6; claims 1,18-19,25 * * sentence 7, paragraph 0037 - sentence 10 * * paragraphs [0009] , [0029] , [0032] , [0035] , [0047] *; | [A]US2006099064 (ANAKI YARON [IL], et al) [A] 1-9 * paragraph [0028]; figure 7 ** sentence 13, paragraph 0032 - sentence 14; claims 11-12 *; | [Y]DE202007003907U (GRENZEBACH MASCHB GMBH [DE]) [Y] 1-4 * paragraph [0035]; figure 4 * | Examination | DE102009025500 | US2011247914 | by applicant | DE19712368 | DE10148038 |