EP2915193 - SILVER BASED TRANSPARENT ELECTRODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 12.02.2021 | ||
Former | Grant of patent is intended Status updated on 04.10.2020 | ||
Former | Examination is in progress Status updated on 09.03.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Pilkington Group Limited European Technical Centre Hall Lane, Lathom Nr. Ormskirk Lancashire L40 5UF / GB | [2021/11] |
Former [2015/37] | For all designated states Pilkington Group Limited European Technical Centre Hall Lane, Lathom Nr. Ormskirk Lancashire L40 5UF / GB | Inventor(s) | 01 /
MCSPORRAN, Neil European Technical Centre Hall Lane Lathom Nr. Ormskirk Lancashire L40 5UF / US | 02 /
NICHOL, Gary Robert 20 Hob Hey Lane Culcheth Warrington Cheshire WA3 4NQ / GB | [2021/11] |
Former [2015/37] | 01 /
MCSPORRAN, Neil 4250 Champlin Drive Perrysburg, Ohio 43551 / US | ||
02 /
NICHOL, Gary Robert 20 Hob Hey Lane Culcheth Warrington Cheshire WA3 4NQ / GB | Representative(s) | Teasdale, Nicola Joanne, et al Pilkington Group Limited Intellectual Property Department Hall Lane Lathom Ormskirk, Lancashire L40 5UF / GB | [2021/11] |
Former [2015/37] | Hazzard, Alan David, et al Pilkington Group Limited NSG European Technical Centre Hall Lane Lathom GB-Ormskirk, Lancashire L40 5UF / GB | Application number, filing date | 13789031.5 | 29.10.2013 | [2015/37] | WO2013GB52815 | Priority number, date | GB20120019499 | 30.10.2012 Original published format: GB 201219499 | [2015/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014068297 | Date: | 08.05.2014 | Language: | EN | [2014/19] | Type: | A1 Application with search report | No.: | EP2915193 | Date: | 09.09.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.05.2014 takes the place of the publication of the European patent application. | [2015/37] | Type: | B1 Patent specification | No.: | EP2915193 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Search report(s) | International search report - published on: | EP | 08.05.2014 | Classification | IPC: | H01L31/0216, C03C17/36, H01L31/0224 | [2015/37] | CPC: |
H01L31/022483 (EP,CN,US);
H01L31/02168 (EP,CN,US);
C03C17/36 (EP,US);
C03C17/3618 (EP,US);
C03C17/3626 (EP,US);
C03C17/3642 (EP,US);
C03C17/3644 (EP,US);
C03C17/3671 (EP,US);
C03C17/3678 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | TRANSPARENTE ELEKTRODE AUF SILBERBASIS | [2015/37] | English: | SILVER BASED TRANSPARENT ELECTRODE | [2015/37] | French: | ÉLECTRODE TRANSPARENTE À BASE D'ARGENT | [2015/37] | Entry into regional phase | 01.06.2015 | National basic fee paid | 01.06.2015 | Designation fee(s) paid | 01.06.2015 | Examination fee paid | Examination procedure | 01.06.2015 | Examination requested [2015/37] | 21.12.2015 | Amendment by applicant (claims and/or description) | 12.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 24.09.2018 | Reply to a communication from the examining division | 11.09.2019 | Despatch of a communication from the examining division (Time limit: M06) | 18.03.2020 | Reply to a communication from the examining division | 05.10.2020 | Communication of intention to grant the patent | 04.02.2021 | Fee for grant paid | 04.02.2021 | Fee for publishing/printing paid | 04.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.03.2018 | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] | Fees paid | Renewal fee | 02.11.2015 | Renewal fee patent year 03 | 31.10.2016 | Renewal fee patent year 04 | 02.11.2017 | Renewal fee patent year 05 | 31.10.2018 | Renewal fee patent year 06 | 31.10.2019 | Renewal fee patent year 07 | 02.11.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.10.2013 | AL | 17.03.2021 | AT | 17.03.2021 | CY | 17.03.2021 | CZ | 17.03.2021 | DK | 17.03.2021 | EE | 17.03.2021 | ES | 17.03.2021 | FI | 17.03.2021 | HR | 17.03.2021 | IT | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | MT | 17.03.2021 | NL | 17.03.2021 | PL | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SE | 17.03.2021 | SI | 17.03.2021 | SK | 17.03.2021 | SM | 17.03.2021 | TR | 17.03.2021 | BG | 17.06.2021 | NO | 17.06.2021 | GR | 18.06.2021 | IS | 17.07.2021 | PT | 19.07.2021 | IE | 29.10.2021 | LU | 29.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | [2024/41] |
Former [2024/29] | HU | 29.10.2013 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
TR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2024/22] | HU | 29.10.2013 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/30] | HU | 29.10.2013 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/29] | HU | 29.10.2013 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/48] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 29.10.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 29.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/35] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 29.10.2021 | ||
Former [2022/33] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/23] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/13] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/10] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/08] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/07] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/52] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/51] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/50] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2021/48] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/46] | AT | 17.03.2021 | |
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/43] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/38] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/37] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/36] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/35] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
NO | 17.06.2021 | ||
Former [2021/33] | FI | 17.03.2021 | |
NO | 17.06.2021 | Cited in | International search | [Y]WO2012007737 (PILKINGTON GROUP LTD [GB], et al) [Y] 19 * page 1, paragraph 1 * * page 4, paragraph 2 - page 5, paragraph 2 * * page 6, paragraphs 3,4 * * page 7, paragraph 4 - page 10, paragraph 4 ** claims 1,10 *; | [Y]US2012048364 (AUVRAY STEPHANE [FR], et al) [Y] 3,15-17,20 * paragraphs [0001] , [0003] , [0093] , [0103] - paragraph [0107]; figure 2 * * paragraph [0148] - paragraph [0158]; table 5 *; | [XY]WO2012110823 (PILKINGTON GROUP LTD [GB], et al) [X] 1,2,4-13,18 * page 1, paragraph 1 * * page 5, paragraph 1 - paragraph 3 * * page 6, paragraph 3 - page 12, paragraph 6; tables example 5, 7, 9 * [Y] 3,19,20; | [XY]WO2012143704 (PILKINGTON GROUP LTD [GB], et al) [X] 1-14,18 * page 3, paragraph 5 - page 4, paragraph 1 * * page 5, paragraphs 3,4,7 - page 11, paragraph 3 * * page 14, paragraph 3 * * table 1 * [Y] 15-17 |