EP2867022 - PLASTIC ASSEMBLY, METHODS OF MAKING AND USING THE SAME, AND ARTICLES COMPRISING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2019 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 09.11.2018 | ||
Former | Grant of patent is intended Status updated on 03.07.2018 | ||
Former | Request for examination was made Status updated on 15.06.2018 | ||
Former | Grant of patent is intended Status updated on 20.02.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Exatec, LLC. 31220 Oak Creek Drive Wixom, MI 48393 / US | [2015/19] | Inventor(s) | 01 /
GASWORTH, Steven Marc 31220 Oak Creek Drive Wixom, Michigan 48393 / US | [2015/19] | Representative(s) | Chevalier, Renaud Philippe, et al Cabinet Germain & Maureau BP 6153 69466 Lyon Cedex 06 / FR | [2015/19] | Application number, filing date | 13796481.3 | 29.05.2013 | [2018/50] | WO2013US43034 | Priority number, date | US201261653004P | 30.05.2012 Original published format: US 201261653004 P | [2015/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013181211 | Date: | 05.12.2013 | Language: | EN | [2013/49] | Type: | A1 Application with search report | No.: | EP2867022 | Date: | 06.05.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.12.2013 takes the place of the publication of the European patent application. | [2015/19] | Type: | B1 Patent specification | No.: | EP2867022 | Date: | 12.12.2018 | Language: | EN | [2018/50] | Search report(s) | International search report - published on: | KR | 05.12.2013 | (Supplementary) European search report - dispatched on: | EP | 22.12.2015 | Classification | IPC: | B32B27/08, B32B7/12, B32B37/02, B29C47/06, B32B5/00, B32B5/02, B32B7/00, B32B7/04, B32B7/10, B32B27/06, B32B27/16, B32B27/28, B32B27/36, B32B3/00, B32B3/02, B32B3/26, // B32B7/02 | [2016/03] | CPC: |
B32B7/027 (EP,CN,KR,US);
B32B7/12 (CN,KR,US);
B29C48/18 (KR);
B32B27/08 (KR);
B32B37/02 (KR);
B60J1/006 (EP,US);
|
Former IPC [2015/19] | B32B27/08, B32B7/12, B32B37/02, B29C47/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KUNSTSTOFFANORDNUNG, VERFAHREN ZUR HERSTELLUNG UND VERWENDUNG DAVON SOWIE ARTIKEL DAMIT | [2015/19] | English: | PLASTIC ASSEMBLY, METHODS OF MAKING AND USING THE SAME, AND ARTICLES COMPRISING THE SAME | [2015/19] | French: | ENSEMBLE EN MATIÈRE PLASTIQUE, PROCÉDÉS DE FABRICATION ET D'UTILISATION ASSOCIÉS ET ARTICLES LE COMPRENANT | [2015/19] | Entry into regional phase | 20.11.2014 | National basic fee paid | 20.11.2014 | Search fee paid | 20.11.2014 | Designation fee(s) paid | 20.11.2014 | Examination fee paid | Examination procedure | 30.03.2014 | Request for preliminary examination filed International Preliminary Examining Authority: KR | 20.11.2014 | Examination requested [2015/19] | 19.07.2016 | Amendment by applicant (claims and/or description) | 21.02.2018 | Communication of intention to grant the patent | 13.06.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 04.07.2018 | Communication of intention to grant the patent | 31.10.2018 | Fee for grant paid | 31.10.2018 | Fee for publishing/printing paid | 31.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.02.2018 | Opposition(s) | 13.09.2019 | No opposition filed within time limit [2019/47] | Fees paid | Renewal fee | 12.05.2015 | Renewal fee patent year 03 | 10.05.2016 | Renewal fee patent year 04 | 10.05.2017 | Renewal fee patent year 05 | 11.05.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.05.2013 | AL | 12.12.2018 | AT | 12.12.2018 | CY | 12.12.2018 | CZ | 12.12.2018 | DK | 12.12.2018 | EE | 12.12.2018 | ES | 12.12.2018 | FI | 12.12.2018 | HR | 12.12.2018 | IT | 12.12.2018 | LT | 12.12.2018 | LV | 12.12.2018 | MC | 12.12.2018 | MK | 12.12.2018 | MT | 12.12.2018 | NL | 12.12.2018 | PL | 12.12.2018 | RO | 12.12.2018 | RS | 12.12.2018 | SE | 12.12.2018 | SI | 12.12.2018 | SK | 12.12.2018 | SM | 12.12.2018 | TR | 12.12.2018 | BG | 12.03.2019 | NO | 12.03.2019 | GR | 13.03.2019 | IS | 12.04.2019 | PT | 12.04.2019 | IE | 29.05.2019 | LU | 29.05.2019 | BE | 31.05.2019 | CH | 31.05.2019 | LI | 31.05.2019 | [2022/31] |
Former [2021/34] | HU | 29.05.2013 | |
AL | 12.12.2018 | ||
AT | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
MT | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 29.05.2019 | ||
LU | 29.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2021/32] | HU | 29.05.2013 | |
AL | 12.12.2018 | ||
AT | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 29.05.2019 | ||
LU | 29.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2021/26] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 29.05.2019 | ||
LU | 29.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/26] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 29.05.2019 | ||
LU | 29.05.2019 | ||
BE | 31.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/21] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 29.05.2019 | ||
LU | 29.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/17] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
LU | 29.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/11] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
LU | 29.05.2019 | ||
CH | 31.05.2019 | ||
LI | 31.05.2019 | ||
Former [2020/07] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/50] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/48] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
DK | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/46] | AL | 12.12.2018 | |
AT | 12.12.2018 | ||
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/39] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/37] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/35] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
PL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/34] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
IT | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/33] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/30] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
NL | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/26] | AL | 12.12.2018 | |
ES | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/25] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/24] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/23] | ES | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/22] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/21] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
NO | 12.03.2019 | ||
Former [2019/20] | LT | 12.12.2018 | |
NO | 12.03.2019 | Documents cited: | Search | [A]US5451465 (GARRIOCH NEIL H G [US]) [A] 1-15 * abstract * * figures 1-14 ** claims 1-14 *; | [Y]US2006054277 (BYUN JUNG IL [KR], et al) [Y] 1-15 * abstract * * claim 1 * * figure 3 * * figure - * * claims 2-7 *; | [A]US2007028695 (SUZUKI KAZUHIRO [JP], et al) [A] 1-15 * abstract * * figures 1-15 * * claims 1-54 *; | [Y]US2010112317 (GASWORTH STEVEN M [US], et al) [Y] 1-15 * abstract * * claims 1-8 * * paragraph [0045] - paragraph [0080] * * claims 9-24 *; | [X]EP2218577 (STICHTING DUTCH POLYMER INST [NL]) [X] 1-15 * abstract * * paragraph [0001] * * figure 8 * * paragraph [0040] - paragraph [0041] * * paragraph [0020] * * paragraph [0027] - paragraph [0034] * * paragraph [0009] - paragraph [0020] * * claims 1, 5 ; claim 6 - "polycarbonate";; figure - * * claims 1-15 * | International search | [Y]US5451465 (GARRIOCH NEIL H G [US]); | [A]US2003092327 (ITAGAKI MINEHIRO [JP], et al); | [A]US2004094264 (YAMAGUCHI HIROAKI [JP], et al); | [A]US2006054277 (BYUN JUNG IL [KR], et al); | [A]US2006103044 (CATE PETER J [GB], et al); | [X]EP2218577 (STICHTING DUTCH POLYMER INST [NL]) | by applicant | EP2218577 |