EP2929381 - METHOD AND APPARATUS FOR FABRICATING AT LEAST ONE FIBER BRAGG GRATING [Right-click to bookmark this link] | |||
Former [2015/42] | METHOD AND DEVICE FOR PRODUCING AT LEAST ONE FIBRE BRAGG GRATING | ||
[2023/12] | Status | No opposition filed within time limit Status updated on 24.05.2024 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 16.06.2023 | ||
Former | Grant of patent is intended Status updated on 09.03.2023 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 25.10.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 27.11.2024 [2024/48] | Applicant(s) | For all designated states Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastr. 27c 80686 München / DE | [2022/16] |
Former [2015/42] | For all designated states Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e.V. Hansastrasse 27 c 80686 München / DE | Inventor(s) | 01 /
SCHADE, Wolfgang Zum Bohrfeld 6 38644 Goslar / DE | 02 /
BURGMEIER, Jörg Admiral-Zenker-Str. 24 37520 Osterode / DE | [2015/42] | Representative(s) | Friese Goeden Patentanwälte PartGmbB Widenmayerstraße 49 80538 München / DE | [2023/29] |
Former [2015/42] | Andrae | Westendorp Patentanwälte Partnerschaft Uhlandstraße 2 80336 München / DE | Application number, filing date | 13799521.3 | 02.12.2013 | [2015/42] | WO2013EP75232 | Priority number, date | DE201210222460 | 06.12.2012 Original published format: DE102012222460 | [2015/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2014086708 | Date: | 12.06.2014 | Language: | DE | [2014/24] | Type: | A1 Application with search report | No.: | EP2929381 | Date: | 14.10.2015 | Language: | DE | The application published by WIPO in one of the EPO official languages on 12.06.2014 takes the place of the publication of the European patent application. | [2015/42] | Type: | B1 Patent specification | No.: | EP2929381 | Date: | 19.07.2023 | Language: | DE | [2023/29] | Search report(s) | International search report - published on: | EP | 12.06.2014 | Classification | IPC: | H01S3/00, G02B6/02, B23K26/55 | [2023/12] | CPC: |
G02B6/02147 (EP,US);
G02B6/02128 (US);
B23K26/55 (EP,US);
G02B6/02152 (US);
H01S3/0057 (EP,US)
|
Former IPC [2015/42] | G02B6/02, H01S3/00, B23K26/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON ZUMINDEST EINEM FASER-BRAGG-GITTER | [2015/42] | English: | METHOD AND APPARATUS FOR FABRICATING AT LEAST ONE FIBER BRAGG GRATING | [2023/12] | French: | PROCÉDÉ ET SYSTÈME POUR FABRIQUER AU MOINS UN RÉSEAU DE BRAGG À FIBRE | [2023/12] |
Former [2015/42] | METHOD AND DEVICE FOR PRODUCING AT LEAST ONE FIBRE BRAGG GRATING | ||
Former [2015/42] | PROCÉDÉ ET DISPOSITIF POUR LA FABRICATION D'AU MOINS UNE FIBRE À RÉSEAU DE BRAGG | Entry into regional phase | 06.07.2015 | National basic fee paid | 06.07.2015 | Designation fee(s) paid | 06.07.2015 | Examination fee paid | Examination procedure | 01.07.2015 | Amendment by applicant (claims and/or description) | 06.07.2015 | Examination requested [2015/42] | 06.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.05.2018 | Reply to a communication from the examining division | 09.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.04.2021 | Reply to a communication from the examining division | 16.05.2022 | Despatch of a communication from the examining division (Time limit: M02) | 25.05.2022 | Reply to a communication from the examining division | 10.03.2023 | Communication of intention to grant the patent | 09.06.2023 | Fee for grant paid | 09.06.2023 | Fee for publishing/printing paid | 09.06.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.12.2017 | Opposition(s) | 22.04.2024 | No opposition filed within time limit [2024/26] | Fees paid | Renewal fee | 29.12.2015 | Renewal fee patent year 03 | 29.12.2016 | Renewal fee patent year 04 | 28.12.2017 | Renewal fee patent year 05 | 21.12.2018 | Renewal fee patent year 06 | 23.12.2019 | Renewal fee patent year 07 | 21.12.2020 | Renewal fee patent year 08 | 17.12.2021 | Renewal fee patent year 09 | 21.12.2022 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 19.07.2023 | DK | 19.07.2023 | EE | 19.07.2023 | ES | 19.07.2023 | FI | 19.07.2023 | HR | 19.07.2023 | IT | 19.07.2023 | LT | 19.07.2023 | LV | 19.07.2023 | MC | 19.07.2023 | NL | 19.07.2023 | PL | 19.07.2023 | RO | 19.07.2023 | RS | 19.07.2023 | SE | 19.07.2023 | SI | 19.07.2023 | SK | 19.07.2023 | SM | 19.07.2023 | NO | 19.10.2023 | GR | 20.10.2023 | IS | 19.11.2023 | PT | 20.11.2023 | IE | 02.12.2023 | LU | 02.12.2023 | BE | 31.12.2023 | CH | 31.12.2023 | [2024/48] |
Former [2024/47] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
IT | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
MC | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SI | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
IE | 02.12.2023 | ||
LU | 02.12.2023 | ||
BE | 31.12.2023 | ||
Former [2024/46] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
IT | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
MC | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SI | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
IE | 02.12.2023 | ||
LU | 02.12.2023 | ||
Former [2024/40] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
IT | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
MC | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SI | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
LU | 02.12.2023 | ||
Former [2024/36] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
IT | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SI | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/26] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
IT | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/23] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
EE | 19.07.2023 | ||
ES | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SK | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/22] | CZ | 19.07.2023 | |
DK | 19.07.2023 | ||
FI | 19.07.2023 | ||
HR | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RO | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/20] | FI | 19.07.2023 | |
HR | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
SM | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/10] | FI | 19.07.2023 | |
HR | 19.07.2023 | ||
LT | 19.07.2023 | ||
LV | 19.07.2023 | ||
NL | 19.07.2023 | ||
PL | 19.07.2023 | ||
RS | 19.07.2023 | ||
SE | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
PT | 20.11.2023 | ||
Former [2024/09] | FI | 19.07.2023 | |
LT | 19.07.2023 | ||
NL | 19.07.2023 | ||
SE | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
IS | 19.11.2023 | ||
Former [2024/08] | LT | 19.07.2023 | |
NL | 19.07.2023 | ||
NO | 19.10.2023 | ||
GR | 20.10.2023 | ||
Former [2024/05] | NL | 19.07.2023 | Cited in | International search | [Y]US2005271349 (OBARA MINORU [JP], et al) [Y] 1,4,8 * paragraphs [0028] - [0034] - [0036] - [0040]; figures 1a-2,6; claims 1-5 *; | [Y] - WIKSZAK E ET AL, "Recording of fiber Bragg gratings with femtosecond pulses using a point by point technique", LASERS AND ELECTRO-OPTICS, 2004. (CLEO). CONFERENCE ON SAN FRANCISCO, CA, USA MAY 20-21, 2004, PISCATAWAY, NJ, USA,IEEE, (20040516), ISBN 978-1-55752-777-6, XP032015952 [Y] 1,8,9 * the whole document * | [YD] - A. MARTINEZ; M. DUBOV; I. KHRUSHCHEV; I. BENNION, "Direct writing of fibre Bragg gratings by femtosecond laser", ELECTRONICS LETTERS, (20040916), vol. 40, no. 19, pages 1170 - 1172, XP006022671 [YD] 1,8,9 * the whole document * DOI: http://dx.doi.org/10.1049/el:20046050 | [Y] - HERMAN P R ET AL, "Ultrashort-pulsed laser direct writing of strong Bragg grating waveguides in bulk glasses", OPTICAL FIBER COMMUNICATION/NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2008. OFC/NFOEC 2008. CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20080224), ISBN 978-1-55752-856-8, pages 1 - 3, XP031391656 [Y] 1,4,8 * the whole document * | [Y] - GEERNAERT T ET AL, "Point-by-point fiber Bragg grating inscription in free-standing step-index, and photonic crystal fibers using near-IR femtosecond laser", OPTICS LETTERS, THE OPTICAL SOCIETY, (20100515), vol. 35, no. 10, doi:10.1364/OL.35.001647, ISSN 0146-9592, pages 1647 - 1649, XP001553881 [Y] 1,8,9 * the whole document * DOI: http://dx.doi.org/10.1364/OL.35.001647 | [Y] - JASON R GRENIER ET AL, "Femtosecond laser fabrication of phase-shifted Bragg grating waveguides in fused silica", OPTICS LETTERS, THE OPTICAL SOCIETY, vol. 37, no. 12, doi:10.1364/OL.37.002289, ISSN 0146-9592, (20120615), pages 2289 - 2291, (20120607), XP001576276 [Y] 1,8 * the whole document * DOI: http://dx.doi.org/10.1364/OL.37.002289 | [Y] - LAI Y ET AL, "DISTRIBUTED BRAGG REFLECTOR FIBER LASER FABRICATED BY FEMTOSECOND LASER INSCRIPTION", OPTICS LETTERS, THE OPTICAL SOCIETY, (20060601), vol. 31, no. 11, doi:10.1364/OL.31.001672, ISSN 0146-9592, pages 1672 - 1674, XP001242572 [Y] 1,8 * the whole document * DOI: http://dx.doi.org/10.1364/OL.31.001672 | Examination | US2005271349 | WO2007134438 | US2009147807 | DE102010001197 | by applicant | - A. MARTINEZ; M. DUBOV; I. KHRUSHCHEV; I. BENNION, "Direct writing of fibre Bragg gratings by femtosecond laser", ELECTRONICS LETTERS, (2004), vol. 40, no. 19, doi:doi:10.1049/el:20046050, page 1170, XP006022671 DOI: http://dx.doi.org/10.1049/el:20046050 |