EP2920879 - OMNI-BAND AMPLIFIERS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.10.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 18.11.2022 | ||
Former | Grant of patent is intended Status updated on 27.06.2022 | ||
Former | Examination is in progress Status updated on 13.05.2019 | Most recent event Tooltip | 05.07.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 07.08.2024 [2024/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121 / US | [2015/39] | Inventor(s) | 01 /
TASIC, Aleksandar Miodrag 5775 Morehouse Drive San Diego, CA 92121 / US | 02 /
DAVIERWALLA, Anosh Bomi 5775 Morehouse Drive San Diego, CA 92121 / US | 03 /
NARATHONG, Chiewcharn 5775 Morehouse Drive San Diego, CA 92121 / US | 04 /
VAN ZALINGE, Klaas 5775 Morehouse Drive San Diego, CA 92121 / US | [2015/39] | Representative(s) | Klang, Alexander H. Wagner & Geyer Partnerschaft mbB Patent- und Rechtsanwälte Gewürzmühlstrasse 5 80538 München / DE | [2022/51] |
Former [2015/39] | Klang, Alexander H. Wagner & Geyer Gewürzmühlstrasse 5 80538 München / DE | Application number, filing date | 13802154.8 | 12.11.2013 | [2015/39] | WO2013US69752 | Priority number, date | US201213677017 | 14.11.2012 Original published format: US201213677017 | [2015/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014078333 | Date: | 22.05.2014 | Language: | EN | [2014/21] | Type: | A2 Application without search report | No.: | EP2920879 | Date: | 23.09.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.05.2014 takes the place of the publication of the European patent application. | [2015/39] | Type: | B1 Patent specification | No.: | EP2920879 | Date: | 21.12.2022 | Language: | EN | [2022/51] | Search report(s) | International search report - published on: | EP | 17.07.2014 | Classification | IPC: | H03F3/193, H03F3/68, H04B1/16 | [2015/39] | CPC: |
H03F3/193 (EP,CN,US);
H04W88/02 (US);
H03F3/68 (EP,CN,US);
H04B1/0053 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | OMNIBAND-VERSTÄRKER | [2015/39] | English: | OMNI-BAND AMPLIFIERS | [2015/39] | French: | AMPLIFICATEURS OMNIBANDES | [2015/39] | Entry into regional phase | 11.06.2015 | National basic fee paid | 11.06.2015 | Designation fee(s) paid | 11.06.2015 | Examination fee paid | Examination procedure | 11.06.2015 | Examination requested [2015/39] | 08.02.2016 | Amendment by applicant (claims and/or description) | 16.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2019 | Reply to a communication from the examining division | 20.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 25.05.2020 | Reply to a communication from the examining division | 13.08.2020 | Despatch of a communication from the examining division (Time limit: M02) | 14.10.2020 | Reply to a communication from the examining division | 14.07.2021 | Despatch of a communication from the examining division (Time limit: M02) | 14.09.2021 | Reply to a communication from the examining division | 28.06.2022 | Communication of intention to grant the patent | 28.10.2022 | Fee for grant paid | 28.10.2022 | Fee for publishing/printing paid | 28.10.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22205538.6 / EP4164123 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.05.2019 | Opposition(s) | 22.09.2023 | No opposition filed within time limit [2023/48] | Fees paid | Renewal fee | 18.09.2015 | Renewal fee patent year 03 | 07.11.2016 | Renewal fee patent year 04 | 08.11.2017 | Renewal fee patent year 05 | 08.11.2018 | Renewal fee patent year 06 | 14.11.2019 | Renewal fee patent year 07 | 10.11.2020 | Renewal fee patent year 08 | 08.11.2021 | Renewal fee patent year 09 | 10.11.2022 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 21.12.2022 | AT | 21.12.2022 | CZ | 21.12.2022 | DK | 21.12.2022 | EE | 21.12.2022 | ES | 21.12.2022 | FI | 21.12.2022 | HR | 21.12.2022 | IT | 21.12.2022 | LT | 21.12.2022 | LV | 21.12.2022 | MC | 21.12.2022 | NL | 21.12.2022 | PL | 21.12.2022 | RO | 21.12.2022 | RS | 21.12.2022 | SE | 21.12.2022 | SI | 21.12.2022 | SK | 21.12.2022 | SM | 21.12.2022 | NO | 21.03.2023 | GR | 22.03.2023 | IS | 21.04.2023 | PT | 21.04.2023 | [2024/32] |
Former [2024/26] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
IT | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2024/11] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SI | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/46] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
DK | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/39] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
IS | 21.04.2023 | ||
PT | 21.04.2023 | ||
Former [2023/38] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
PL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SK | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/37] | AL | 21.12.2022 | |
AT | 21.12.2022 | ||
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/35] | AT | 21.12.2022 | |
CZ | 21.12.2022 | ||
EE | 21.12.2022 | ||
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RO | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/34] | EE | 21.12.2022 | |
ES | 21.12.2022 | ||
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
PT | 21.04.2023 | ||
Former [2023/33] | ES | 21.12.2022 | |
FI | 21.12.2022 | ||
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
SM | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/29] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
NL | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/27] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
RS | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/24] | FI | 21.12.2022 | |
HR | 21.12.2022 | ||
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/23] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
LV | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
GR | 22.03.2023 | ||
Former [2023/22] | FI | 21.12.2022 | |
LT | 21.12.2022 | ||
SE | 21.12.2022 | ||
NO | 21.03.2023 | ||
Former [2023/20] | LT | 21.12.2022 | |
NO | 21.03.2023 | Cited in | International search | [X] - ITO T ET AL, "Characterization of On-Chip Multiport Inductors for Small-Area RF Circuits", IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I: REGULAR PAPERS, IEEE, US, (20090801), vol. 56, no. 8, doi:10.1109/TCSI.2008.2010096, ISSN 1549-8328, pages 1590 - 1597, XP011333489 [X] 1-3,7,15-17,19,20 * Section B. Proposed DA;; figure 6 * DOI: http://dx.doi.org/10.1109/TCSI.2008.2010096 | [X] - ZHANG F ET AL, "An Agile, Ultra-Wideband Pulse Radio Transceiver With Discrete-Time Wideband-IF", IEEE JOURNAL OF SOLID-STATE CIRCUITS, IEEE SERVICE CENTER, PISCATAWAY, NJ, USA, (20090501), vol. 44, no. 5, doi:10.1109/JSSC.2009.2020681, ISSN 0018-9200, pages 1336 - 1351, XP011256780 [X] 1,2,4,7,15-17,19,20 * Section A. DLNA;; figure 5 * DOI: http://dx.doi.org/10.1109/JSSC.2009.2020681 | [X] - ZHANG F ET AL, "Low power programmable-gain CMOS distributed LNA for ultra-wideband applications", VLSI CIRCUITS, 2005. DIGEST OF TECHNICAL PAPERS. 2005 SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20050616), doi:10.1109/VLSIC.2005.1469338, ISBN 978-4-900784-01-7, pages 78 - 81, XP010818340 [X] 1,2,4,7,15-17,19,20 * Section: Distributed Amplifier Tradeoffs;; figure 1 * DOI: http://dx.doi.org/10.1109/VLSIC.2005.1469338 | [X] - KWANG-JIN KOH ET AL, "A merged structure of LNA & sub-harmonic mixer for multi-band DCR applications", 2003 IEEE MTT-S INTERNATIONAL MICROWAVE SYMPOSIUM DIGEST.(IMS 2003). PHILADELPHIA, PA, JUNE 8 - 13, 2003; [IEEE MTT-S INTERNATIONAL MICROWAVE SYMPOSIUM], NEW YORK, NY : IEEE, US, (20030608), doi:10.1109/MWSYM.2003.1210925, ISBN 978-0-7803-7695-3, pages 243 - 246vol.1, XP032412376 [X] 1,2,4,7,15-17,19,20 * Section A. Low Noise Amplifier Design;; figure 2 * DOI: http://dx.doi.org/10.1109/MWSYM.2003.1210925 | Examination | JP2001267864 |