EP2872605 - FUEL COMPOSITION [Right-click to bookmark this link] | |||
Former [2015/21] | NOVEL FUEL COMPOSITION | ||
[2019/44] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 15.10.2019 | ||
Former | Examination is in progress Status updated on 23.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Primus Green Energy Inc. 219 Homestead Road Hillsborough, NJ 08844 / US | [2015/21] | Inventor(s) | 01 /
FANG, Howard, L. 518 Glen Ridge Drive South Bridgewater, NJ 08807 / US | 02 /
QIN, Meifang 271 Bouvant Drive Princeton, NJ 08540 / US | 03 /
BEN-REUVEN, Moshe 51 Clover Lane Princeton, NJ 08540 / US | [2015/21] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2020/15] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2015/21] | Matthews, Derek Peter Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 13816380.3 | 12.07.2013 | [2020/15] | WO2013US50328 | Priority number, date | US201213547826 | 12.07.2012 Original published format: US201213547826 | [2015/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014012027 | Date: | 16.01.2014 | Language: | EN | [2014/03] | Type: | A2 Application without search report | No.: | EP2872605 | Date: | 20.05.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.01.2014 takes the place of the publication of the European patent application. | [2015/21] | Type: | B1 Patent specification | No.: | EP2872605 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | RU | 06.03.2014 | (Supplementary) European search report - dispatched on: | EP | 06.06.2016 | Classification | IPC: | C10L1/04, C07C1/04 | [2016/12] | CPC: |
C10L1/04 (EP,CN,US);
C07C1/047 (US);
C10G2300/1022 (EP,US);
C10G2400/30 (EP,US);
C10L2200/00 (EP,US);
C10L2200/04 (EP,US)
|
Former IPC [2015/21] | C10L1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BRENNSTOFFZUSAMMENSETZUNG | [2019/44] | English: | FUEL COMPOSITION | [2019/44] | French: | COMPOSITION DE CARBURANT | [2019/44] |
Former [2015/21] | NEUARTIGE BRENNSTOFFZUSAMMENSETZUNG | ||
Former [2015/21] | NOVEL FUEL COMPOSITION | ||
Former [2015/21] | NOUVELLE COMPOSITION DE CARBURANT | Entry into regional phase | 15.01.2015 | National basic fee paid | 15.01.2015 | Search fee paid | 15.01.2015 | Designation fee(s) paid | 15.01.2015 | Examination fee paid | Examination procedure | 15.01.2015 | Examination requested [2015/21] | 05.12.2016 | Amendment by applicant (claims and/or description) | 02.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.01.2017 | Reply to a communication from the examining division | 20.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 28.03.2018 | Reply to a communication from the examining division | 25.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 15.10.2018 | Reply to a communication from the examining division | 16.10.2019 | Communication of intention to grant the patent | 21.02.2020 | Fee for grant paid | 21.02.2020 | Fee for publishing/printing paid | 21.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.01.2017 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 13.05.2015 | Renewal fee patent year 03 | 21.07.2016 | Renewal fee patent year 04 | 24.07.2017 | Renewal fee patent year 05 | 17.07.2018 | Renewal fee patent year 06 | 22.07.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.07.2013 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IE | 12.07.2020 | LU | 12.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2022/32] |
Former [2022/27] | HU | 12.07.2013 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IE | 12.07.2020 | ||
LU | 12.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2022/26] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IE | 12.07.2020 | ||
LU | 12.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/37] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IE | 12.07.2020 | ||
LU | 12.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
LU | 12.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
LU | 12.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/13] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RS | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [X]US2003028058 (WEISSMAN WALTER [US], et al) [X] 1-8* examples 1-2 *; | [X]US2003085153 (O'REAR DENNIS J [US]) [X] 1-8 * table 1 * * paragraph [0112] *; | [X]US2007187291 (MILLER STEPHEN J [US], et al) [X] 1-8 * table 5 * | International search | [Y]RU2175960 (INST KATALIZA SO RAN, et al); | [X]US2008155887 (CLARK RICHARD HUGH [GB], et al); | [X]US2012116137 (FANG HOWARD L [US], et al) | Examination | US3138645 | by applicant | US2003028058 | US2003085153 | US2007187291 | US2012116137 | US20100942680 |