| EP2874274 - POWER CONTROL DEVICE, POWER CONTROL METHOD AND POWER CONTROL SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 04.09.2020 | ||
| Former | Grant of patent is intended Status updated on 14.05.2020 | ||
| Former | Examination is in progress Status updated on 04.08.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Kyocera Corporation 6, Takedatobadono-cho Fushimi-ku Kyoto-shi, Kyoto 612-8501 / JP | [2015/21] | Inventor(s) | 01 /
NAKAYAMA, Taku c/o Kyocera Corporation Head Office 6 Takeda Tobadono-cho Fushimi-ku Kyoto-shi Kyoto 612-8501 / JP | [2015/21] | Representative(s) | SSM Sandmair Patentanwälte Rechtsanwalt Partnerschaft mbB Joseph-Wild-Straße 20 81829 München / DE | [2020/41] |
| Former [2015/21] | Schwabe - Sandmair - Marx Patentanwälte Stuntzstraße 16 81677 München / DE | Application number, filing date | 13817375.2 | 10.07.2013 | [2020/41] | WO2013JP04269 | Priority number, date | JP20120156006 | 11.07.2012 Original published format: JP 2012156006 | [2015/21] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014010242 | Date: | 16.01.2014 | Language: | JA | [2014/03] | Type: | A1 Application with search report | No.: | EP2874274 | Date: | 20.05.2015 | Language: | EN | [2015/21] | Type: | B1 Patent specification | No.: | EP2874274 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | International search report - published on: | JP | 16.01.2014 | (Supplementary) European search report - dispatched on: | EP | 30.03.2016 | Classification | IPC: | H02J13/00, G05F1/66, H02J3/14 | [2016/17] | CPC: |
G05F1/66 (EP,US);
G05B15/02 (US);
H02J13/1337 (EP,US);
H02J13/14 (EP,US);
H02J3/14 (EP,US);
H02J2105/42 (EP,US);
Y02B70/30 (EP,US);
Y02B70/3225 (EP,US);
Y02B90/20 (EP);
|
| Former IPC [2015/21] | H02J13/00, H04M11/00, H04Q9/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | STROMSTEUERUNGSVORRICHTUNG, STROMSTEUERUNGSVERFAHREN UND STROMSTEUERUNGSSYSTEM | [2015/21] | English: | POWER CONTROL DEVICE, POWER CONTROL METHOD AND POWER CONTROL SYSTEM | [2015/21] | French: | DISPOSITIF DE COMMANDE DE PUISSANCE, PROCÉDÉ DE COMMANDE DE PUISSANCE ET SYSTÈME DE COMMANDE DE PUISSANCE | [2015/21] | Entry into regional phase | 23.12.2014 | Translation filed | 23.12.2014 | National basic fee paid | 23.12.2014 | Search fee paid | 23.12.2014 | Designation fee(s) paid | 23.12.2014 | Examination fee paid | Examination procedure | 23.12.2014 | Examination requested [2015/21] | 12.10.2016 | Amendment by applicant (claims and/or description) | 04.08.2017 | Despatch of a communication from the examining division (Time limit: M06) | 31.01.2018 | Reply to a communication from the examining division | 24.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 21.02.2019 | Reply to a communication from the examining division | 02.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.12.2019 | Reply to a communication from the examining division | 15.05.2020 | Communication of intention to grant the patent | 27.08.2020 | Fee for grant paid | 27.08.2020 | Fee for publishing/printing paid | 27.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.08.2017 | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 23.07.2015 | Renewal fee patent year 03 | 22.07.2016 | Renewal fee patent year 04 | 24.07.2017 | Renewal fee patent year 05 | 27.07.2018 | Renewal fee patent year 06 | 25.07.2019 | Renewal fee patent year 07 | 23.07.2020 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.07.2013 | AL | 07.10.2020 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | IT | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | MT | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | [2024/41] |
| Former [2024/29] | HU | 10.07.2013 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| MK | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| TR | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2024/22] | HU | 10.07.2013 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| MK | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2023/30] | HU | 10.07.2013 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2023/29] | HU | 10.07.2013 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2022/23] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2022/18] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2022/10] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/49] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/48] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/45] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/37] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/36] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/35] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/34] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/33] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/32] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/28] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/25] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/24] | AT | 07.10.2020 | |
| FI | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/23] | FI | 07.10.2020 | |
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/22] | FI | 07.10.2020 | |
| NL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| NO | 07.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/21] | FI | 07.10.2020 | |
| NL | 07.10.2020 | ||
| PT | 08.02.2021 | ||
| Former [2021/20] | FI | 07.10.2020 | Documents cited: | Search | [XI] WO2010065198 (AMERICAN POWER CONV CORP et al.) [X] 1,2,5-8 * abstract * * paragraphs [0023] - [0040] *[I] 3,4 | [XI] US2012150359 (WESTERGAARD HENRIK et al.) [X] 1,5-8 * abstract * * paragraphs [0004] - [0006] - [0021] - [0040] - [0 43] - [0070] *[I] 3,4 | International search | [Y] JP2011234570 (TOSHIBA CORP et al.) | [Y] JP2003116219 (NIHON SETSUBI KOGYO CO LTD et al.) | [Y] JP2003153347 (FUJITSU LTD et al.) [Y] | [Y] JP2002320327 (MITSUBISHI ELECTRIC CORP et al.) [Y] | [Y] JP2008182840 (FUJI XEROX CO LTD et al.) [Y] | by applicant | JP2007336180 | JP2009260913 |