blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2920615

EP2920615 - PROCESS FOR CREATING IMAGE GATHERS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 18.11.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  17.02.2019
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Total SA
2 place Jean Millier La Défense 6
92400 Courbevoie / FR
[2015/39]
Inventor(s)01 / GUAN, Huimin
Total Plaza
1201 Louisiana Street Suite 1800
Houston, TX 77002 / US
02 / WILLIAMSON, Paul
Total E&P CSTJF
Avenue Larribau
F-64018 Pau / FR
03 / DUQUET, Bertrand
55 Gladstone Pi
Aberdeen AB10 6UX / GB
 [2015/39]
Representative(s)Bond, Christopher William
Forresters IP LLP
Skygarden
Erika-Mann-Strasse 11
80636 München / DE
[2019/30]
Former [2015/39]Bond, Christopher William
Forresters
Skygarden
Erika-Mann-Strasse 11
80636 München / DE
Application number, filing date13856045.313.11.2013
[2015/39]
WO2013US69882
Priority number, dateUS20121367569913.11.2012         Original published format: US201213675699
[2015/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014078406
Date:22.05.2014
Language:EN
[2014/21]
Type: A1 Application with search report 
No.:EP2920615
Date:23.09.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 22.05.2014 takes the place of the publication of the European patent application.
[2015/39]
Type: B1 Patent specification 
No.:EP2920615
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)International search report - published on:US22.05.2014
(Supplementary) European search report - dispatched on:EP23.06.2016
ClassificationIPC:G01V1/32, G01V1/30, G01V1/28, // G01V1/36
[2019/08]
CPC:
G01V1/301 (EP,US); G01V1/30 (US); G01V1/282 (EP,US);
G01V1/325 (EP,US); G01V1/28 (US); G01V1/303 (EP,US);
G01V1/362 (EP,US); G01V2210/51 (US); G01V2210/512 (EP,US) (-)
Former IPC [2016/30]G01V1/30, G01V1/28, // G01V1/36
Former IPC [2015/39]G01V1/38
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/39]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR ERZEUGUNG VON BILDSAMMLUNGEN[2015/39]
English:PROCESS FOR CREATING IMAGE GATHERS[2015/39]
French:PROCÉDÉ DE CRÉATION DE REGROUPEMENTS D'IMAGES[2015/39]
Entry into regional phase13.05.2015National basic fee paid 
13.05.2015Search fee paid 
13.05.2015Designation fee(s) paid 
13.05.2015Examination fee paid 
Examination procedure13.05.2015Examination requested  [2015/39]
12.01.2017Amendment by applicant (claims and/or description)
18.02.2019Communication of intention to grant the patent
12.06.2019Fee for grant paid
12.06.2019Fee for publishing/printing paid
12.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.02.2019
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
10.11.2015Renewal fee patent year 03
23.11.2016Renewal fee patent year 04
22.11.2017Renewal fee patent year 05
22.11.2018Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.11.2013
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
[2022/31]
Former [2021/34]HU13.11.2013
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/32]HU13.11.2013
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/26]AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/51]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/46]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IE13.11.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/37]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/36]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
LU13.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/35]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
LU13.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
IS24.02.2020
Former [2020/34]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
IS24.02.2020
Former [2020/27]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/25]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/24]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/23]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/22]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/17]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/15]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/12]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/11]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
GR25.10.2019
PT25.11.2019
Former [2020/10]AT24.07.2019
FI24.07.2019
LT24.07.2019
SE24.07.2019
BG24.10.2019
PT25.11.2019
Former [2020/09]FI24.07.2019
LT24.07.2019
Former [2020/08]LT24.07.2019
Documents cited:Search[YA]US2006185929  (KOREN ZVI [IL]) [Y] 7 * figures 1-4 * * paragraphs [0021] - [0027] - [0029] - [0033] - [0037] - [0044] - [0051] - [0053] * [A] 1-6;
 [IAY]WO2011152928  (EXXONMOBIL UPSTREAM RES CO [US], et al) [I] 1,2,5,6 * figures 1-3,5 * * paragraphs [0007] - [0021] - [0024] - [0026] * * claims 1-12 * [A] 3,4 [Y] 5,7;
 [YA]US2012092962  (NICHOLS DAVID E [US], et al) [Y] 5 * paragraphs [0013] - [0022] - [0024] - [0027] - [0030] - [0035] * * figures 1-5 * [A] 1-4,6,7;
 [IAY]  - ZHANG Y ET AL, "TRUE-AMPLITUDE, ANGLE-DOMAIN, COMMON-IMAGE GATHERS FROM ONE-WAY WAVE-EQUATION MIGRATIONS", GEOPHYSICS, SOCIETY OF EXPLORATION GEOPHYSICISTS, US, (20070101), vol. 72, no. 1, doi:10.1190/1.2399371, ISSN 0016-8033, pages S49 - S58, XP001503465 [I] 1-3,6 * abstract * * page S50 - page S52 * * page S54 - page S57 * [A] 4 [Y] 5,7

DOI:   http://dx.doi.org/10.1190/1.2399371
 [A]  - Weijia Sun ET AL, "Common-angle image gathers for shot-profile migration: an efficient and stable strategy", CSIRO Earth Science and Resource Engineering , Research Publications Repository, doi:10.1071/EG11038, (20120331), pages 1 - 15, URL: https://publications.csiro.au/rpr/download?pid=csiro:EP116883&dsid=DS1, (20160614), XP055280442 [A] 1-7 * pages 1-7 *

DOI:   http://dx.doi.org/10.1071/EG11038
International search[Y]US7196969  (KARAZINCIR MATTHEW H [US]) [Y] 7* entire document *;
 [Y]US2007203673  (SHERRILL FRANCIS G [US], et al) [Y] 1-7 * entire document *;
 [Y]US2012075954  (XU SHENG [US], et al) [Y] 1-7 * entire document *;
 [Y]US2012176861  (ABMA RAYMOND LEE [US], et al) [Y] 1-7 * entire document *
 [Y]  - STOLK et al., "Inverse Scattering of Seismic Data in the Reverse Time Migration (RTM) Approach", Proceedings of the Project Review, vol. 1, (20090000), pages 91 - 108, URL: http://gmig.math.purdue.edu/pdfs/2009/09-06.pdf, (20140125) [Y] 3-4
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.