EP2931512 - HEAT-ASSISTED CARTON FORMATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.02.2021 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 20.03.2020 | ||
Former | Grant of patent is intended Status updated on 18.11.2019 | ||
Former | Examination is in progress Status updated on 08.06.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Graphic Packaging International, LLC Law department - 9th floor 1500 Riveredge Parkway, Suite 100 Atlanta, GA 30328 / US | [2018/19] |
Former [2015/43] | For all designated states Graphic Packaging International, Inc. 9th Floor 1500 Riveredge Parkway Suite 100 Atlanta, Georgia 30328 / US | Inventor(s) | 01 /
WALSH, Joseph, C. 5532 La Platra Circle Boulder, CO 80301 / US | [2015/43] | Representative(s) | Grättinger Möhring von Poschinger Patentanwälte Partnerschaft mbB Wittelsbacherstrasse 2b 82319 Starnberg / DE | [2020/17] |
Former [2015/43] | Grättinger Möhring von Poschinger Patentanwälte Partnerschaft Wittelsbacherstrasse 2b 82319 Starnberg / DE | Application number, filing date | 13859215.9 | 21.11.2013 | [2015/43] | WO2013US71134 | Priority number, date | US201261797141P | 30.11.2012 Original published format: US 201261797141 P | [2015/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014085169 | Date: | 05.06.2014 | Language: | EN | [2014/23] | Type: | A1 Application with search report | No.: | EP2931512 | Date: | 21.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.06.2014 takes the place of the publication of the European patent application. | [2015/43] | Type: | B1 Patent specification | No.: | EP2931512 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Search report(s) | International search report - published on: | KR | 05.06.2014 | (Supplementary) European search report - dispatched on: | EP | 05.12.2016 | Classification | IPC: | B31B50/36, B31B50/74, // B31B50/62, B31B100/00 | [2019/43] | CPC: |
B31B50/36 (EP,BR,US);
B31B50/741 (EP,US);
B31B2100/00 (EP,US)
|
Former IPC [2016/35] | B31B1/26, B31B1/04, B31B1/62, B31B1/74 | ||
Former IPC [2015/43] | B31B1/26, B31B1/04, B31B1/60 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WÄRMEUNTERSTÜTZTE FORMUNG VON KARTONS | [2015/43] | English: | HEAT-ASSISTED CARTON FORMATION | [2015/43] | French: | FORMATION DE CARTON ASSISTÉE THERMIQUEMENT | [2015/43] | Entry into regional phase | 25.06.2015 | National basic fee paid | 25.06.2015 | Search fee paid | 25.06.2015 | Designation fee(s) paid | 25.06.2015 | Examination fee paid | Examination procedure | 25.06.2015 | Examination requested [2015/43] | 21.06.2017 | Amendment by applicant (claims and/or description) | 06.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 02.10.2018 | Reply to a communication from the examining division | 13.09.2019 | Date of oral proceedings | 11.11.2019 | Minutes of oral proceedings despatched | 19.11.2019 | Communication of intention to grant the patent | 12.03.2020 | Fee for grant paid | 12.03.2020 | Fee for publishing/printing paid | 12.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.06.2018 | Opposition(s) | 25.01.2021 | No opposition filed within time limit [2021/13] | Fees paid | Renewal fee | 30.11.2015 | Renewal fee patent year 03 | 28.11.2016 | Renewal fee patent year 04 | 27.11.2017 | Renewal fee patent year 05 | 27.11.2018 | Renewal fee patent year 06 | 27.11.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.11.2013 | AL | 22.04.2020 | AT | 22.04.2020 | CY | 22.04.2020 | CZ | 22.04.2020 | DK | 22.04.2020 | EE | 22.04.2020 | FI | 22.04.2020 | HR | 22.04.2020 | IT | 22.04.2020 | LT | 22.04.2020 | LV | 22.04.2020 | MC | 22.04.2020 | MK | 22.04.2020 | MT | 22.04.2020 | PL | 22.04.2020 | RO | 22.04.2020 | RS | 22.04.2020 | SE | 22.04.2020 | SI | 22.04.2020 | SK | 22.04.2020 | SM | 22.04.2020 | TR | 22.04.2020 | BG | 22.07.2020 | NO | 22.07.2020 | GR | 23.07.2020 | IS | 22.08.2020 | PT | 24.08.2020 | IE | 21.11.2020 | LU | 21.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | [2022/32] |
Former [2022/27] | HU | 21.11.2013 | |
AL | 22.04.2020 | ||
AT | 22.04.2020 | ||
CY | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
MT | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
TR | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2022/26] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
TR | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/46] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/37] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
Former [2021/33] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
LU | 21.11.2020 | ||
Former [2021/31] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
MC | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/24] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SI | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/10] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
PL | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SK | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/09] | AL | 22.04.2020 | |
AT | 22.04.2020 | ||
CZ | 22.04.2020 | ||
DK | 22.04.2020 | ||
EE | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
IT | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/08] | AL | 22.04.2020 | |
DK | 22.04.2020 | ||
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RO | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
SM | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/04] | AL | 22.04.2020 | |
FI | 22.04.2020 | ||
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2021/01] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
BG | 22.07.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/51] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
RS | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/50] | FI | 22.04.2020 | |
HR | 22.04.2020 | ||
LT | 22.04.2020 | ||
LV | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
GR | 23.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/48] | FI | 22.04.2020 | |
LT | 22.04.2020 | ||
SE | 22.04.2020 | ||
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
PT | 24.08.2020 | ||
Former [2020/47] | LT | 22.04.2020 | |
NO | 22.07.2020 | ||
IS | 22.08.2020 | ||
Former [2020/46] | IS | 22.08.2020 | Documents cited: | Search | [A]US2876555 (PYL JR CHESTER A VANDER) [A] 15 * column 5, line 42 - line 71 *; | [IY]US5800329 (FAGER LARS [SE], et al) [I] 16 * column 3, line 18 - column 5, line 17; figures 1-5 * [Y] 1-14,17,18; | [L]US2007167304 (SELLE PAUL [US], et al) [L] 16* paragraph [0094] *; | [XYI]US2012071312 (SEICHE WERNER [DE], et al) [X] 1,4,5 * the whole document * [Y] 1-14,17,18 [I] 16 | International search | [A]US4979932 (BURNSIDE PAUL [US]); | [Y]US5800329 (FAGER LARS [SE], et al); | [A]US2009264271 (WIKLUND LENNART [SE]); | [A]US7708679 (CAILLOUX LIONEL [FR], et al); | [Y]US2012071312 (SEICHE WERNER [DE], et al) |